A freestanding TV cabinet looks like a small line item on a furniture schedule until it lands in the middle of a villa living room or a guest suite media wall. Then it drives three separate conversations at once: joinery dimensions, screen and equipment clearances, and the electrical package behind it. Writing those requirements into the procurement brief before quotation is far cheaper than resolving them during production. The steps below follow how Santerson Freestanding TV Cabinets are actually configured on our side, so the brief you send and the shop drawings you approve line up from day one.
Freestanding or wall-mounted: settle this before anything else
Our media range covers both mounting approaches, and the two behave very differently on site. A freestanding unit carries its own weight through its base, so the brief needs floor finish levels, skirting details and a clear statement about whether the wall behind it may be used for fixing or cable routing. A floating TV unit transfers load into the wall build-up, which means substrate type, blocking positions and access panels belong in the wall trade package instead.
In mixed packages we see this decision arrive late, after the tiling and plasterboard scopes are already priced. Fix it at concept stage: for each room, record whether the media unit is freestanding, wall-hung, or a full-height built-in system, because that single choice determines which trades carry the structural and electrical work.
Dimensions and clearances to write into the brief
Our listings are made-to-measure, so we do not publish a fixed size table for this collection. That flexibility is an advantage only if the brief carries real numbers rather than a nominal length. For every unit, specify:
- Overall envelope: width, height and depth, plus finished floor level and any recess, alcove or return wall it sits against.
- Screen data: display size, mounting method, and the manufacturer's bracket pattern and cable exit position if already selected. If the screen is still an allowance, say so explicitly in the brief.
- Equipment stack: which devices sit inside — soundbar, console, set-top box, AV receiver — and whether their rear connections need clearance for insertion depth.
- Ventilation route: closed compartments trap heat. State whether doors or panels are perforated, hinged or sliding, and how service access is intended.
- Cable path: where the trunking or through-panel openings sit, and who forms the wall chase.
Depth is the item most often under-specified. A cabinet depth that suits a slim television on a bracket may be too shallow once a receiver with deep rear cabling goes on a shelf. Give us the equipment list, not just the screen size, and we will set the internal shelf depths around it.
Layout, storage split and door type
Tell us how the room is used, because that drives the open-to-closed ratio. A guest suite usually needs mostly closed storage with one clear shelf for a welcome directory; a family living room needs daily-access shelving and something to hide consoles out of sight. We then set drawer banks, open niches and closed compartments accordingly.
Where display is the point rather than concealment, the same collection also offers glass front media units. Glass changes the brief in two practical ways: glazing type and thickness need confirming for each project, and hardware specification — hinges, handles, soft-close fittings — moves to the front of the approval list because it becomes visible. For both glass and solid-front units, we ask you to confirm glass, storage and hardware selections per project rather than relying on a catalogue default.
Materials, finishes and how they must match the rest of the package
Freestanding media units rarely stand alone visually. They sit against wall panelling, opposite wardrobes, and under the same lighting scheme as the joinery elsewhere in the project. So specify finish by reference, not by name alone: send the laminate, veneer or lacquer sample reference used on the cabinetry package, the sheen level, and the edge treatment for visible returns. Where a unit abuts a different material — stone hearth, timber floor, plaster — record the joint detail you expect.
If the media unit is part of a wider fit-out, ordering it through the same custom furniture manufacturer as the wardrobes and vanities removes an entire category of matching risk. Our custom and OEM service covers bespoke finishes, textures and edge details, which is what keeps a media unit consistent with the rest of the joinery schedule across rooms.
Integrated lighting: put it in the brief or lose it
Niche and shelf lighting is often decided after quotation, when it becomes a variation. Where display shelving is lit, consider integrated LED media units in the same collection instead of adding surface fittings later. Integrated lighting changes what we need from you: driver location and whether it is accessible for replacement, switching arrangement and control interface, cable route to the unit, and the colour temperature standard used across the project.
Lighting and electrical details are confirmed per project with your electrical consultant. We build the channels and housings; the supply, control and commissioning side stays with the electrical package, so name both scopes in the brief to avoid a gap between them.
What we need from you before we quote
| Item in the brief | Why it changes price or lead time |
|---|---|
| Room-by-room schedule with unit type (freestanding, wall-hung, built-in) | Determines which trade carries fixing, blocking and cable routes |
| Made-to-measure dimensions with finished floor levels | Non-standard heights and recess returns affect panel cut and handling |
| Screen and equipment list with mounting data | Sets shelf depths, ventilation openings and service access |
| Door and drawer type per compartment | Hinges, slides and soft-close hardware are specified per unit |
| Finish references matched to the cabinetry package | Prevents colour and sheen mismatch between joinery lots |
| Lighting and electrical intent, with driver access point | Channels must be built into panels at production, not retrofitted |
| Delivery address, unpacking and install sequence | Affects packaging, container loading plan and site handling |
Procurement through a single supplier
Media units arrive alongside flooring, wall panels, wardrobes and bathroom fixtures, and they share the same approvals chain. Coordinating them as one package under a one-stop furniture and building materials supplier means one set of shop drawings to review, one finish schedule to sign off, and one consolidated shipment plan. Our workflow runs through consultation, design and planning, production, logistics, installation and after-sales, with door-to-door delivery arranged for the whole order rather than per item.
For project teams sourcing in Australia, that single package also means one point of contact for documentation and shipment tracking. Import terms, duties and delivery scope are confirmed case by case for each project, so treat them as items to agree in the contract rather than assumptions carried across from another job.
Before you send the enquiry: attach the room schedule, the equipment list for each media position, and the finish references already approved for the joinery package. Confirm dimensions, materials, hardware, glass and lighting specifications per project at drawing stage — that is where mismatches are cheapest to correct.
If you have a villa, hotel or office package with media positions still open, send us the schedule and we will return shop drawings for each unit with the storage split, ventilation route and lighting detail resolved. Contact PHILLIP at santerson@qq.com or on WhatsApp +86-13928214007 to start the review.