A product submittal is the document package a buyer, architect or contractor reviews before approving outdoor furniture for a villa, hotel pool deck or resort lounge. For a modular aluminum outdoor sofa set with teak tabletop and armrest details, the submittal has to do more than show an attractive photograph. It has to record what is being bought, how it can be configured, which materials touch which environment, and what the supplier will actually deliver. Below is the checklist we use when preparing submittals for this category, using our Modular Aluminum Outdoor Sofa Set with Teak Tabletop & Armrest as the working example.
1. Identification page: model, category and source drawing
Open with a single page that lets a reviewer match the document to the specification line item. Include the product name exactly as it appears in the catalog, the product URL, the project reference and the submittal number, so comments coming back from the design team can be traced to one version of the package.
State the category plainly — outdoor furniture, modular lounge suite — and list the modules covered. A modular set is not one SKU; it is a family of seat modules, armless units, corner units, armrests with teak caps and a coffee table with a teak top. If the submittal only shows the largest arrangement in the photograph, an approver cannot tell whether a smaller straight run or an L-shaped layout is available from the same tooling.
2. Module inventory and layout options
The core of a modular submittal is the module list. For each element give the name, the plan dimension, whether it carries an armrest, and how many are needed for each recommended arrangement. Then show three or four layouts drawn to plan scale so the buyer can place them against a terrace or pool deck drawing.
- Seat modules: corner unit, armless unit, and ottoman or pouf module, each dimensioned in millimeters with seat height and seat depth noted.
- Armrests: listed as separate line items with the teak cap shown in detail, because they are usually specified per outer end rather than per module.
- Table: the coffee table with teak tabletop, dimensioned overall and by clear legroom, plus any integrated side trays that come with specific modules.
- Arrangements: a compact two-seat conversation layout, a straight sectional run, and an L-shaped or wrap-around configuration sized for a lounge zone.
Where the project needs a different footprint, note comparable sets in the same family so the reviewer can switch layouts without reopening the material discussion. Our L-Shaped Aluminum Outdoor Corner Sofa Set with Teak-Look Slat Tops covers projects that want a fixed corner footprint, while the Aluminum Frame Outdoor Conversation Sofa Set with Teak Tabletop & Arm Caps suits a small pool terrace where three pieces are enough.
3. Material schedule: frame, teak, weave and cushion
Buyers approve outdoor furniture by material, not by style name. Give a four-part schedule and keep each row specific to what we actually supply on this model.
| Component | What the submittal should record |
|---|---|
| Frame | aluminum frame, tube or section size where applicable, surface finish options (powder-coated color or wood-effect finish), and the finish sample reference the buyer has approved. |
| Teak parts | Natural teak on armrest caps and tabletop; state thickness, edge profile, oil-finished or unfinished condition, and that teak is a natural material with color variation between pieces. |
| Weave or panel infill | If the set combines aluminum with rope weave or wicker panels, name the material and the color option chosen for the project. |
| Cushions | Foam density range, cover fabric type with the performance-fabric option named, color code from the approved swatch, and which covers are removable for cleaning. |
Two lines protect you later. First, separate what is aluminum from what is teak: reviewers often assume the whole armrest is metal. Second, describe weather exposure in the buyer's own words — covered pool deck", "open terrace, full sun" — and let the material schedule answer it. Our product description for this set states thick padded cushions in weather-resistant performance fabric built for prolonged sun exposure and light rain; that sentence belongs in the submittal with the fabric option attached to it, not as a stand-alone claim.
4. Dimensioned drawings and clearances
Include overall dimensions for every arrangement, plus critical dimensions an installer needs: seat height, armrest height, the depth of the teak tabletop, and the footprint of each module when nested for storage or stacked for shipping. Add clearance notes — walkway width around the set, distance from a pool edge, and space needed to pull a chair back — because these are the questions that delay approval on site.
If the terrace has a fixed element such as a planter, step or sun lounger zone, show the set superimposed on the buyer's layout. A drawing that answers "will it fit" in one look removes two rounds of email.
5. Customization options and what changes the price
A submittal that omits options invites change orders later. For this category we support custom cushion fabrics, frame colors and module combinations for hospitality project orders, so list them with the consequence of choosing each one:
- Cover fabric grade and color — affects lead time if the fabric is not a stocked option.
- Frame finish and color — affects tooling or coating sequence on the aluminum frame.
- Module combination — affects carton count, container loading plan and freight cost.
- Teak dimensions or edge detail — affects the timber cutting list and should be confirmed before production starts.
State minimum order quantities for custom work in the same section. Hospitality buyers comparing two suppliers make decisions on total landed cost, so an honest options table builds more confidence than a single fixed price.
6. Care, maintenance and expected ageing of teak
Include one page the owner will keep after handover: how to clean the aluminum frame, how to wash cushion covers, and what happens to natural teak left outdoors. Teak weathers to a silver-gray tone unless it is oiled on a schedule; say so, and give the recommended cleaning frequency for salt-air and poolside settings. This page prevents the most common after-sales dispute in outdoor projects, which is a color change that was always going to happen.
7. Packaging, shipping and site handling
Modular sets arrive as several cartons with different contents, so the submittal should show the packing list per arrangement: carton count, dimensions, gross weight, and which modules travel in which carton. Add the loading plan if the order shares a container with other goods from the same project — outdoor furniture, furniture series pieces and building finishes are often consolidated into one shipment for villa and hotel work.
Note handling requirements at the delivery point: lift size, stair access, and whether the set can be carried in modules and assembled on the terrace. This is where a modular design earns its cost, and it belongs in writing.
8. After-sales terms to confirm in writing
Close the package with the practical commitments: warranty scope for frame and for teak and fabric separately, spare-parts availability for replaceable modules and cushion covers, and the contact route for snag lists after installation. Keep these as project-specific terms agreed on the purchase order rather than generic marketing promises.
Submittal practice note: any performance figure, test standard or compliance statement in a submittal must come from a document we can attach. Where a project requires testing to a specific regional standard, that requirement is confirmed with our team before the submittal is issued rather than assumed from catalog copy.
A short approval checklist
- Model name and URL match the specification line item.
- All modules, armrests and tables listed with dimensions.
- Three or more layout options drawn to plan scale.
- Material schedule separates aluminum, teak, weave and cushion components.
- Approved color and fabric codes recorded, not just described.
- Packing list per arrangement plus site handling notes.
- Care and ageing guidance for natural teak included.
- Options with lead-time and cost impact, and after-sales terms.
SANTERSON prepares submittals for outdoor furniture projects from our own production drawings, and we handle the full package — design coordination, custom/OEM manufacturing, door-to-door delivery and installation support. Send us the terrace or pool deck drawing and the arrangement you need, and we will return a complete submittal for approval before production starts: Contact Us.