A door quote that looks complete on the surface is often the reason a joinery package arrives short. Hardware missing, opening sizes taken from a drawing rather than the built opening, and finishes named without a reference sample all turn into variation orders after production has started. If you are pricing Santerson Decorative Interior Doors for a villa, apartment or hospitality fit-out, the checks below cover what a supplier quotation should state before you sign it.
1. Item and opening schedule: quantities are not the same as openings
Decorative interior doors in a project are usually quoted as a set of types rather than one line item: leaf, frame (jamb), architrave or casing, and sometimes matching wall panelling that carries the door into the surrounding surface. A quote should list each type with a room-by-room schedule, so you can reconcile it against your own door schedule instead of accepting one lump quantity.
Ask specifically what is included per unit. A price that covers the leaf only, with frame and architrave quoted as extras, looks low until the total is rebuilt. Compare quotes on a "per complete opening" basis: leaf plus frame plus architrave on one side or both sides.
2. Sizes: made-to-measure needs dimensions from site, not from design
Santerson's interior door listings describe made-to-measure sizing with material and finish options selected per project, which means the quotation is only as accurate as the dimensions you supply. Before a quote is confirmed, the supplier should show width, height and wall thickness for every opening, and state whether those figures are design dimensions or site-verified openings.
- Clear opening size versus finished floor level — confirm which datum the height is measured from.
- Wall build-up and total thickness, including plasterboard, render or cladding that will be added after the frame is installed.
- Whether out-of-plumb or irregular openings are rebated by the supplier or corrected on site at your cost.
- Any non-standard heights for ceiling-height doors, and how the head detail is closed.
3. Construction and core: ask what is behind the face
Two doors can share a finish specification and differ completely in build. The quote should name the door leaf construction and core type, the frame material, and how the finish is applied — paint-grade surface, laminate, melamine or wood veneer. This matters most for decorative doors that sit against matching panelling, where the face and edge must read as one surface.
Confirm these points in writing:
- Leaf core type and edge construction (edge banding, solid lipping, or mitred veneer edge).
- Finish system and whether the door is supplied pre-finished or for site finishing.
- Veneer species and cut, if a veneered option is quoted — quarter-cut or rotary-cut changes the figure.
- Moisture content expectations for the destination climate, and how the doors are packed between sites.
4. Hardware: the most common omission in a door quotation
Decorative doors often specify concealed hinges, invisible or flush hinges, and recessed or pull-and-push fittings instead of conventional lever handles. Those items need to be on the quote with model references, not described as "hardware as shown". Hinge quantity per leaf depends on leaf height and weight, so ask the supplier to state the number of hinges and the load rating they are pricing.
Also check whether lock bodies, strike plates, door closers, acoustic or smoke seals, and floor guides for sliding variants are included, excluded, or supplied by others. If your project uses concealed doors that align flush with the wall, confirm which system carries the hanging hardware and who supplies it.
5. Finishes and colour: name them properly
A quote line reading "matte white" or "oak" is not a specification. Ask for the finish reference — paint code or RAL number, laminate or melamine decor code, veneer species with cut and grain direction, and lacquer sheen level. For decorative doors matched to wall panels and wardrobes in the same project, request that the door leaf, frame, architrave and panelling are produced from the same batch of material so the tone matches.
Before production is released, ask for a physical finish sample or a first-article door. A colour approved on screen is not an approval; paint and veneer read differently under site lighting.
6. What the price covers: freight, packing and sequence
Interior doors are easy to damage in transit and expensive to remake, so the quotation should state packing method (edge protection, vertical or flat packing, crate type) and the delivery basis — ex-works, FOB, CIF or door-to-door. SANTERSON lists logistics support covering freight forwarding by sea, air and rail, customs paperwork, container loading and door-to-door delivery, so ask which of those are inside this price and which are separate.
Confirm the delivery sequence as well. Doors arrive after wet trades are finished on most sites; a quote that ships everything in one container can leave doors sitting in a damp store for weeks. Ask whether the door package can be shipped separately or in phases by floor or building.
7. Lead time, tolerances and installation responsibility
Ask the supplier to state lead time from two points: from confirmed drawings, and from approved finish samples. Those dates differ, and the second one is what actually controls your programme. The quote should also say who installs — a site team working from the supplier's fixing details, or an installer supplied with the package — and how snags, replacement leaves and spare hardware are handled after handover.
| Quote line | What should be stated |
|---|---|
| Unit price | Complete opening basis: leaf, frame, architrave; extras listed separately |
| Sizes | Width, height, wall thickness per opening; site-verified or design dimension |
| Construction | Leaf core, edge detail, frame material, pre-finished or unfinished |
| Finish | Paint code / decor code / veneer species and cut, sheen level |
| Hardware | Model reference, hinge count per leaf, locks and seals included or excluded |
| Packing and freight | Packing method, Incoterms, whether door package can ship separately |
| Lead time | From approved drawings and from approved samples; phasing options |
| After sales | Snag rectification, replacement leaves, spare hardware supply |
8. Coordinating doors with the rest of the joinery package
Decorative interior doors rarely stand alone. When the same supplier also produces integrated door and panelling, wardrobes, vanities and kitchen cabinetry for the project, one quotation covering those items keeps material batch, finish reference and delivery sequence aligned. If doors are quoted separately from cabinetry, expect tone mismatch between a veneered door and a veneered wardrobe panel from a different production run.
For buyers working across several trades, SANTERSON works as a one-stop furniture and building materials supplier, covering design coordination, custom and OEM manufacturing, logistics and installation support — useful when the door schedule has to be reconciled with panelling, storage walls and other built-in work rather than priced in isolation.
Before you sign
Send your own door schedule back to the supplier and ask them to price it line by line, complete-opening basis, with hardware listed by model reference and finishes named by code. A quotation that answers those points is straightforward to compare between suppliers; one that does not will cost more later than the difference in unit price now.