A swim spa quoted from a model number alone is not comparable with another one. Two units that look identical on a spec sheet can differ in pump count, filtration duty, power load and what is actually included in the price. If you are evaluating Outdoor Swim Spa WS-P001 for a villa terrace, a resort garden or an apartment rooftop, this guide shows how to turn the catalogue entry into a clear, quotable specification that suppliers can price consistently and your site team can install without surprises.
Why the Specification Document Matters More Than the Model Number
Swim spas are assembled systems. The shell, jets, pumps, control unit, lighting and water treatment each arrive with their own lead time, and an electrical load that has to match the supply available on site. When a project sends only "1 x WS-P001" to several suppliers, each one answers against a different assumption about what is standard and what is optional. The result is a set of quotations that cannot be compared line by line, followed by change orders after production has started.
A written specification fixes the scope before the first quotation request goes out. It becomes the reference for the purchase order, the packing list, the customs paperwork and the installation brief. For projects working with a one-stop furniture and building materials supplier, the swim spa specification also has to sit alongside adjacent scopes such as paving, decking, outdoor furniture, perimeter drainage and power distribution, so that one party is clearly accountable for each interface.
The Six Blocks Every Swim Spa Specification Needs
1. Shell Geometry and How the Numbers Are Read
State length, width and depth in millimetres, and say explicitly whether the figure is the external shell dimension or the internal water volume envelope. Catalogue dimensions usually describe the shell as built; they do not include steps, plant cabinets, handrails or a cover. For WS-P001 the catalogue lists 3500 x 950 mm. Note that this entry gives two values rather than three, so depth must be confirmed in writing against the configuration you are ordering before it goes into a drawing.
Then record the installation condition: above ground on a finished deck, semi-recessed, or fully sunken with an access pit. Each option changes the access hatch, the insulation detail and how the filter pump is reached for routine service.
2. Water Movement: Jets, Pumps and Training Equipment
List jet count and jet type separately from pump count. A jet total tells you the hydrotherapy layout; the pump schedule tells you how many machines are driving that layout and what they draw. For WS-P001 the catalogue shows 81 jets in total, 2 water pumps and 1 filter pump. Where a swim training system is required for lap-style use, record it as a line item. The WS-P001 entry does not list one, so if your programme assumes counter-current swimming you must confirm whether that equipment can be added to this shell or whether a different model in the range is the right starting point.
3. Water Treatment and Sanitation
Ozone and UV sterilisation are frequently shown as options rather than inclusions, and their consumables have replacement intervals that belong in the operating budget. WS-P001 is shown with ozone; UV sterilisation appears in the optional accessories list for this range. Write down which system is included, which is quoted as an add-on, and what the supplier recommends for a unit that will run unattended between guest visits in a hospitality setting.
4. Filtration and Maintenance Access
Specify filter pump quantity, filtration method and where the equipment sits relative to the shell. Sand filtration is listed as an option for this range; cartridge systems are more common on compact shells. Whatever you choose, mark the clearance needed to lift the pump lid and change the media on your layout drawing. A 950 mm deep shell installed flush into a deck with no service opening is a maintenance problem your facilities team will discover on day one.
5. Electrical Load and Control
This is the block that most often causes site delays. Record total connected power, supply voltage and phase, circuit protection, and whether heating is included or added by a heat pump. WS-P001 is shown with a total power figure of 8.35 kW and 1 control system. Treat that as the catalogue value for the base configuration: adding a heat pump, an automatic cover or extra lighting changes the load, and your electrical contractor needs the final number before the sub-board is sized.
6. Options, Accessories and What Is Excluded
List optional items as a priced table rather than prose: control system, UV sterilisation, additional water pumps, heat pump, sand filtration, insulation and steps. Then state exclusions in the same document: crane or lifting gear, sub-base and concrete works, perimeter drainage, paving and decking, local electrical connection, permits. Clear exclusions are what stop a "supply only" quotation from becoming a site dispute.
Worked Example: WS-P001 Specification Table
Use the supplier's catalogue entry as your starting grid, then fill every blank before you circulate it. The table below mirrors what is published for this model; anything marked "not listed" must be confirmed in writing rather than assumed.
| Specification line | Catalogue value for WS-P001 | Action before ordering |
|---|---|---|
| Model | WS-P001 | Confirm the exact variant and configuration code. |
| Catalogue dimensions | 3500 x 950 mm | Confirm depth and whether steps or plant cabinet are included in that footprint. |
| Control system | 1 set | Confirm control placement, waterproof rating and remote operation. |
| Swim training system | Not listed | Confirm availability for this shell or select a model that includes it. |
| Water pump | 2 pcs | Confirm pump duty and whether jets are zoned. |
| Filter pump | 1 pc | Confirm filtration method and service clearance. |
| Jet total | 81 pcs | Request a jet layout drawing for seat and lounge positions. |
| LED lights | 2 pcs | Confirm fitting location and colour options. |
| Total power | 8.35 kW | Reconfirm after all options are fixed; hand the final figure to your electrician. |
| Features shown | Water jets, LED lighting, ozone | Confirm consumables and replacement intervals for sanitation. |
Matching the Shell to the Site Before You Specify It
A compact shell in this range suits a tight terrace, a villa garden room or a hotel courtyard where the footprint is constrained and the primary use is hydrotherapy rather than swimming length. Longer shells in the same swim spa collection carry swim training systems and larger jet layouts, which changes both the power demand and the civil works. Decide the primary use first, whether recovery, hydrotherapy for guests or daily lap training, because that single decision drives shell length, jet count and electrical load far more than aesthetic preference does.
Then check three site conditions in parallel with the quotation: the load path to the slab or deck, the route the unit travels from the delivery vehicle to its final position, and where the condensate and drainage discharge will go. Any of these can rule out a shell that otherwise looks perfect on paper.
Putting the Specification into a Procurement Package
Once the six blocks are complete, package them so the same document travels through every stage of the order. A workable sequence:
- Issue the specification with dimensions and required options to shortlist suppliers, and require each quotation to answer your line items in the same order.
- Compare quotations on included equipment and exclusions, not headline price. Two identical totals can differ by a heat pump and a cover.
- Freeze the configuration in writing before production starts, and record any change as a dated variation with its effect on power load and lead time.
- Have the supplier confirm packing, container loading and delivery terms against your site access. See logistics and door-to-door delivery for how freight and customs documentation are handled on project shipments.
- Hand the final electrical and dimension sheet to your installer with the acceptance checklist below, and agree who signs off each item at handover. See installation and after-sales support.
Acceptance Checklist for Handover
- Delivered model and configuration match the frozen specification sheet, item by item.
- Actual shell dimensions verified on site against the drawing used for the deck opening.
- All jets confirmed operating, with the layout drawing checked against seat positions.
- Filtration cycle, ozone system and control panel verified in front of your facilities representative.
- Measured supply load recorded and compared with the agreed connected power figure.
- Service access to the filter pump demonstrated, with consumable part numbers handed over.
- Spares list, warranty document and maintenance schedule received in writing.
Frequently Asked Questions
Can one specification be sent to several suppliers for comparison?
Yes, and that is the point. If every supplier answers your line items in the same order, with inclusions and exclusions stated, price differences become visible as scope differences rather than surprises at installation.
What is the fastest way to tell whether a shell suits my site?
Draw the footprint at 1:50 on your deck plan with service clearance added, then check the delivery route. If the unit cannot reach position without lifting equipment, that cost belongs in the quotation before you compare suppliers.
Should electrical work be quoted by the swim spa supplier or locally?
Local connection is normally a local contractor's scope, because supply voltage and protection requirements are set by the site. Your job is to hand that contractor the final connected power figure and control placement from the frozen specification.
Send us your swim spa specification for a written quotation
Share the model, required options and site condition, and we will confirm configuration, included equipment and electrical load before production. SANTERSON supplies swim spas alongside outdoor furniture, interior fixtures and building materials for villa, hospitality and office projects, with freight, installation support and after-sales service through one project team.