A swim spa shell arriving on site is only half of a finished installation. For the Outdoor Swim Spa WS-PC07A-T, the weeks before the container is loaded decide whether the crane, the slab, the electrical feed and the plant room are ready on the same day. This guide walks through the delivery and installation sequence we use with buyers, contractors and villa project managers, so the pool suite, its pumps and its control equipment land in the right order and go live without rework.
Start from the footprint, not the brochure
The WS-PC07A-T is listed in our Swimming Pools and Swim Spas range with catalog dimensions of 7000 × 3000 × 1470 mm. Treat that figure as the starting point for three separate measurements on your site, because they are not the same number:
- Structural opening — the clear width and length of the access route from the truck to the final position, including gates, side passages and any overhead obstruction such as a pergola beam or power line.
- Finished footprint — the shell position once steps, coping and any surrounding decking are added. Steps and insulation are catalog-listed options for this range, so confirm with us whether they are in your configuration before you set out the deck line.
- Service zone — the space needed to open the equipment compartment, remove the filter pump and lift a water pump out for service without draining the spa or cutting the deck.
Send us the site plan with these three dimensions marked. We will confirm against your selected configuration whether the access route works, and where the control system needs to sit relative to the shell.
Confirm the equipment list before you order the electrical work
The catalog entry for this model shows a control system, a swim training system, one water pump, one filter pump, 56 jets and four LED lights, with a total power figure of 11.55 kW. That total is a catalog value for the shown configuration, not an electrical design figure for your site. Options in this range include UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps — each changes the connected load.
So the order of work matters:
- Fix the configuration with us in writing: which pump set, whether a heat pump is included, whether ozone or UV sterilisation is fitted, and which control system is supplied.
- Take that confirmed list to your electrician for the supply sizing, protective device, earthing and any local approval. The catalog power figure is a reference for budgeting; the final load comes from the equipment actually shipped.
- Only then place the electrical rough-in, so the cable route, isolator position and conduit land where the delivered control system expects them.
Plan the delivery around the site's access reality
A 7 m spa shell is a bulky, awkward load rather than a heavy one, and most delays we see on projects come from access assumptions made too late. Before booking the lift, agree these points with your builder:
| Item to confirm | Why it matters |
|---|---|
| Crane or crane-bag window | The shell must be placed on the prepared base in one move. Book the crane for the same day the base is signed off, not the week before. |
| Base and slab readiness | The reinforced base, its level and its drainage must be complete and cured before the shell sits on it. A shell parked on shoring while works catch up invites load damage. |
| Delivery date vs. trade sequence | Waterproofing, decking, tiling and electrical final connection should be sequenced so none of them blocks the crane route or the equipment compartment. |
| Goods receipt on site | Someone competent must be present to check cartons against the packing list and note any transit damage on the delivery paperwork on the day. |
Our Logistics and Door-to-door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading plans, shipment tracking and delivery to site. For a swim spa order we also plan how the shell, the plant items and the smaller accessories are packed and unloaded, because installing pumps and a control system straight off a mixed container is where components go missing.
Sequence installation so commissioning is one clean event
Our Installation and After-sales Support service covers on-site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance. Agree the handover order below with the main contractor before mobilisation:
- Base accepted, levels recorded, drainage tested — documented before the shell is placed.
- Shell set, aligned and packed; equipment compartment confirmed accessible.
- Pumps, filter pump, control system and swim training system installed per the supplied layout, with pipework labelled.
- Electrical final connection by your licensed electrician, then first fill.
- Commissioning run: jets, LED lighting, ozone or sterilisation (if fitted), heating and filtration cycle checked one by one against the delivered specification.
- Snag walk with the client, defect list closed, then handover of the operating instructions and spare-parts reference to the building owner or facility manager.
Keep one photo record per stage. When a fault appears months later, that record shows whether the issue sits with the shell, the pipework, the electrical supply or a component, and it stops a warranty claim stalling while everyone argues about what was installed.
Coordinate the swim spa with the rest of the outdoor package
On villa and resort projects the spa rarely stands alone. Loungers, daybeds, pergolas and poolside dining usually come from the same procurement round, and if they arrive in a separate shipment they are stored, moved twice and damaged. Bundling them into one production and delivery plan means one site mobilisation, one inspection and one handover document set.
SANTERSON works as a one-stop furniture and building materials supplier, so the swim spa can be ordered alongside outdoor furniture for villas and resorts and, where the project extends indoors, bathroom fixtures, wall panels, flooring and cabinetry. Where a client wants a different shell shape or finish, our Custom Furniture Manufacturer service covers bespoke design, prototyping and material selection for project-specific products.
A pre-delivery checklist worth signing
- Confirmed configuration sheet signed by both sides — pumps, jets, lighting, ozone or UV, heat pump, insulation, steps, control system.
- Electrical load confirmed from the shipped equipment list, not from a catalog figure.
- Access route measured and photographed; crane booked against the base-completion date.
- Base, waterproofing and drainage completed, tested and recorded.
- Storage area identified for cartons that cannot be installed on delivery day.
- Named site contact for goods receipt, plus the main contractor's trade sequence shared with us.
- Commissioning date and snag-walk attendees fixed before the shell ships.
Tell us the site conditions, the configuration you want and your target handover date, and we will return a delivery and installation plan for the WS-PC07A-T with the equipment list, packing plan and on-site sequence set out. For Australian villa and hospitality work, see our Turnkey Interior Project Solutions and published Australian Villa Furniture Projects.