A wardrobe that pairs a glass front with a lacquered body looks simple on a mood board and complicated on site. The two materials behave differently under light, they move differently with humidity, and they are produced by different processes inside the same order. That is why approval meetings for Glass & Lacquer Combination Wardrobes should end with a written set of confirmations rather than a signed-off picture. The checklist below follows the order in which decisions actually have to be made: opening, then carcass, then doors, then hardware and glazing, then tolerances, then logistics.
Start With the Opening, Not the Door
Combination wardrobes are made to measure for each project, so the door design is a consequence of the opening, not the other way round. Before any finish is approved, the site dimensions need to be recorded in their finished condition: floor level after the final screed and covering, ceiling level after the ceiling grid or plasterboard, and the position of skirting, architraves, switches, sockets and any radiator or pipework that runs down the wall. A wardrobe ordered against a structural drawing rather than a finished-condition survey is the most common cause of a site adjustment.
Confirm and record all of the following:
- Width, height and depth at three points across the opening, plus the out-of-plumb reading on each vertical leg
- Whether the unit runs floor to ceiling or stops below a cornice, and how the gap above is closed off
- Obstructions within 150 mm of the carcass: door reveals, light switches, thermostat, sprinkler heads, air grilles
- Floor covering type and thickness at the front of the unit, because sliding tracks and hinged swing clearance both depend on it
- Whether walls are stud, masonry or a combination, which determines how the unit is anchored
Our team works from these measurements together with the room layout, so internal zoning can be planned around actual access rather than a generic template.
Agree the Carcass Before Talking About Colour
The carcass carries the doors, and in a combination unit the glass panels add weight that a plain panelled box never has to carry. Two points decide whether the finished wardrobe stays square after delivery: how tall each section is, and how the sections are joined.
- Maximum single-piece height for the carcass panels, and where joints are allowed if the run is longer than one module
- Back panel type and thickness, and whether it is fixed into a rebate or pinned to the rear — this changes how rigid the unit feels once glazed doors hang on it
- Adjustable feet or a plinth, and the levelling range available for uneven floors
- Hanging rail positions, shelf spans and drawer widths, since long unsupported shelf spans deflect over time under loaded shelving
Internal layout is worth settling at the same meeting. Hanging zones, drawer banks and shelf storage are set to the client's storage pattern, and once the carcass is cut, moving a rail is easy but moving a drawer bank is not. For bedroom layouts that lean on clean lines and concealed storage, Custom Minimalist Bedroom Wardrobe layouts show how handleless fronts and flat panels are arranged around the same zoning logic.
Specify Both Surfaces as Separate Line Items
This is where combination units get mis-specified. The lacquered part and the glazed part come from different finishing stages, so a single note saying "grey wardrobe" leaves both open to interpretation.
For the lacquered surfaces, confirm the sheen level first — high gloss or matte changes how every edge reads, because gloss reveals the joint line while matte softens it. Then confirm the colour reference: a named paint code, a physical sample board, or both. Screen appearance is not a specification, and the same image can read warm grey on one display and green-grey on another. The Matte Lacquer Wardrobes and High Gloss Lacquer Wardrobes pages are useful comparison points when a client is choosing between the two finishes.
For the glazed surfaces, confirm the glass type and its visual effect rather than a product name alone. Clear, frosted, bronze, smoked and ribbed glass each behave differently in a bedroom: clear shows the contents, frosted diffuses them, bronze and smoked darken the reflection, ribbed breaks it into vertical lines. Also confirm which face is treated, since that decides how the edge looks from the side.
Ask for one physical sample that carries both finishes on adjacent surfaces. A lacquer board with a glazed offcut mounted beside it reveals mismatch in undertone far more reliably than two separate samples reviewed on different days.
Fix the Door Type and Its Hardware Together
Glass and lacquer combination fronts can be hinged or sliding, and each choice carries a hardware decision that cannot be reversed later without rework.
- Hinged: confirm hinge type, the swing arc against the bed or opposite wall, and whether handles are used at all. Handleless fronts need a profile or a routed edge, which changes the front's appearance up close.
- Sliding: confirm track type, the overlap between panels, the pocket depth that panels disappear into, and floor clearance for the lower track on carpet or timber.
- Framed glass fronts: where an aluminium-framed glass door is used instead of a full glass panel, confirm frame colour and section width, because the frame reads as a line across the elevation. Aluminum Frame Glass Wardrobes are the reference for that detail.
- Glass fixing: confirm how glass is held in the door — gasket, bead or structural fixing — and whether the glazing is tempered. This belongs on the purchase order, not in a site conversation.
Where a run mixes closed storage with open display, Combination Modular Wardrobes give a way to alternate glazed and solid modules on the same wall without changing carcass depth.
Write Down the Tolerances Someone Has to Live With
Approval should record the visual outcomes both parties accept, because combination units show their joints. The following are worth stating explicitly in the drawing notes:
- Mitre quality at corners and whether any edge is finished with a matching banding instead of a mitre
- Shade variation permitted between panels from different production batches, especially on gloss lacquer
- Expansion allowance around the unit where it meets wall and ceiling, and the trim used to close it
- Alignment tolerance for door gaps and the reference face used when levelling a long run
- Whether glass panels are matched in one batch across the whole order, so reflection tone stays consistent
These notes cost nothing at approval stage and settle disputes quickly on handover.
Confirm Packing, Sequence and Installation Before the Order Closes
A glazed wardrobe is a freight risk that a solid one is not. Panels need edge protection, glass needs separate crating, and the two arrive with different handling requirements. Confirm how the order is packed, how cartons are numbered against the drawing, and whether the delivery address allows a truck and trolley access to the floor in question.
Then confirm sequence. Wardrobes need the room finished — flooring, paint, electrical fixings — before installation, but after any built-in joinery that shares the wall. When the same supplier also provides Interior Fixtures such as vanities, kitchen cabinetry and panelling for the project, this sequencing is set once across the whole fit-out instead of being negotiated unit by unit at handover.
Finally, confirm what happens after installation: who inspects, what list of items is signed off, how replacement panels or hardware are ordered later, and who carries out the fixing on site. Getting these agreed while the order is still open keeps the project team's approval record complete.
Approval checklist in one place
- Finished-condition survey of the opening, signed and dated
- Carcass heights, joint positions, back panel type, levelling method
- Lacquer sheen plus named colour reference; glass type, treated face, edge appearance
- Door type, hardware model, handleless profile if used, glazing method and whether tempered
- Written tolerances for mitres, batch shade variation, expansion gaps and door alignment
- Packing plan, carton numbering, delivery access, installation window, snag and spare-parts route
Send us the room drawings or a site survey for your wardrobe package and we will return a made-to-measure specification with finish samples, internal layout options and a production plan that matches your installation sequence.