A mahogany wardrobe specified on a drawing and a mahogany wardrobe that works on site are two different things. The difference is almost always decided before production starts, by the project information available to the people making the casework. This guide walks through the project details that change the specification of Mahogany Solid Wood Wardrobes, and what a buyer should have in hand when a quotation is requested.
Why the Room Itself Comes First
Solid wood casework is made to measure, so the starting point is a survey of the actual opening rather than a nominal dimension taken from a plan. Bedrooms rarely have square corners, level floors or plumb walls, and a wardrobe that runs floor to ceiling will show every deviation. Before any layout is fixed, record:
- Wardrobe width, height and depth at several points along the wall, not just one, plus the position of skirting, cornices and architraves.
- Floor level across the full run, because a slope or an out-of-level floor changes door alignment and drawer operation.
- The projection into the room once wardrobe doors are open, including handles, and whether a bed, nightstand or doorway swing interferes.
- Positions of power outlets, switches, air-conditioning grilles, sprinkler heads and light fittings that the carcass will cover or approach.
These measurements decide whether the wardrobe can be a single continuous run or must be split into modules to pass through a lift, a stairwell or a doorway on the way to the bedroom. That transport question is settled far more often by access than by design intent.
Occupancy Pattern and Storage Mix
The interior configuration of a wardrobe follows from how the space will actually be used, which differs sharply between a private residence, a serviced apartment and a rental villa where turnover is high.
| Use case | What it changes in the wardrobe specification |
|---|---|
| Owner-occupied bedroom | Hanging lengths for coats and dresses, drawer banks for folded clothing, shelving for linen, and space for a suitcase or seasonal items. |
| Serviced apartment or short-stay villa | Fewer delicate internal finishes, more hanging rail than shelf, a luggage position, and hardware that survives frequent handling by different guests. |
| Guest room used occasionally | A simpler wardrobe mix is enough; budget is better spent on the master bedroom where daily use justifies it. |
Where a bedroom has no depth for a full-height wardrobe, or where a whole wall of storage is required, the same timber specification can be carried into an adjoining dressing area. Our Island Walk in Wardrobes and L Shaped Walk in Wardrobes are laid out from the same project drawings, so a wardrobe run in the bedroom and a dressing room can share one material and finish schedule.
Door Type Is a Space Decision, Not Only an Aesthetic One
The wardrobe door system determines how much clear floor the unit consumes in use, and it constrains carcass depth and the wall returns beside it.
- Hinged doors need clearance to swing fully, so they suit bedrooms where circulation is generous. They also allow a full-height panel with a moulded profile, which is the usual choice for traditional and classic interiors.
- Sliding doors keep the walkway clear in narrow bedrooms, but they require an allowance for the track and for panels to overlap, and they limit access to one bay at a time.
- Open or curtain-fronted wardrobe storage removes the door question altogether and is used where the unit sits inside a recess or a dressing room that can be closed off separately.
For projects that want a specific door language rather than a solid panel, related collections in the same catalogue include Classic Wooden Hinged Wardrobes and Wooden Sliding Door Wardrobes. Keeping the carcass specification constant while changing only the door front is often the cheapest way to match two different room styles in one house.
Finish, Tonal Range and How It Is Approved
Mahogany as a species name covers several timbers with different colour ranges, and even boards from one log will vary. For that reason the wardrobe finish should be fixed by an approved physical sample, not by a photograph or a colour code.
- Agree a sample board showing the stain or clear coat, the sheen level, and both a light and a dark end of the acceptable grain range.
- Sign and date two copies of the sample: one stays with the factory as the production reference, one is held on site for inspection at handover.
- Check the wardrobe finish against adjacent timber in the same room — doors, architraves, flooring and vanities — under the room's own lighting before approving.
- Decide whether visible grain variation is wanted. A darker, more uniform film-forming finish hides variation; a clear or lightly tinted finish will show it.
Moisture and Movement in the Building Envelope
Solid timber wardrobe carcasses and doors move with the humidity of the space they sit in. A unit built against an external wall, or in a bedroom that is heated or cooled on a schedule rather than continuously, needs detailing that allows for that movement.
- Confirm whether the bedroom's air conditioning runs continuously or only when occupied, and at what setpoint.
- Note any wall that receives direct sun through an unshaded window, which affects both the wardrobe finish and the panel construction.
- In dressing rooms adjoining bathrooms, confirm the extract arrangement and whether the wardrobe carcass shares a wall with a wet zone.
- Allow for expansion detailing in the panels and mouldings rather than relying on tight site fitting.
Hardware, Lighting and Internal Accessories
Wardrobe hardware is usually the first component to fail and the last item specified, which is the wrong order. Handles, hinges, soft-close fittings, drawer runners, rails and any internal lighting should be named on the drawing with a brand or model reference, because they affect panel thickness, door weight and the reveal between doors.
- State handle style and fixing centres early; some profiles require rebates or through-bolts that must be machined at panel production.
- Confirm load ratings for rails and drawers where heavy items such as linen or luggage are stored.
- If internal lighting is wanted, decide the switching method — door-activated, motion sensor or a wall switch — and route power before the carcass reaches site.
Ordering Sequence and Site Coordination
Wardrobes sit late in a fit-out but must be ordered early, because their specification depends on decisions made by other trades. A practical sequence for a custom wardrobe package:
| Stage | What must be confirmed before the next stage starts |
|---|---|
| Design freeze | Room survey, wardrobe layout, door type, internal configuration, handle and accessory schedule. |
| Sample approval | Signed timber and finish sample for the wardrobe doors and carcass, plus a mock-up of one bay where the profile is complex. |
| Production | Shop drawings signed off; final wardrobe dimensions taken from completed floors and walls, not from the design drawing. |
| Delivery and access | Route from vehicle to bedroom measured; module sizes set so each piece passes lifts, turns and doorways. |
| Installation | Wet trades, flooring, painting and electrical first fix complete; snag list signed at handover. |
For projects that combine wardrobes with other joinery, it is worth ordering the wardrobe package, doors and vanities against one drawing set so the profiles, edges and finishes match. Our Custom Minimalist Bedroom Wardrobe | Modern Storage Solutions range is specified this way when a whole bedroom or floor is being fitted out.
Before you request a quotation: have the room survey, the internal configuration sketch, the wardrobe door type, the finish reference and the access route to the bedroom ready. Those five items are what turn a price per metre into a firm, buildable offer.
Frequently Asked Questions
Are these wardrobes supplied assembled or flat-packed?
It depends on the module size and the access route to the bedroom. Large floor-to-ceiling wardrobe runs are frequently built in sections that are assembled as far as possible in the factory and joined on site, so that they can be delivered through lifts and stairwells. Confirm the delivery route at the drawing stage.
Can the mahogany specification be matched to our existing doors and flooring?
It can be approached closely by matching a physical sample rather than a colour name, but natural timber will never be an exact match to an installed floor of a different board cut. Agreeing the tolerance in writing at sample stage prevents disputes later.
What happens if the on-site dimensions differ from the drawings?
This is normal, which is why final wardrobe dimensions should be taken after flooring and wall finishes are complete. Fillers and scribes are designed into the wardrobe elevation so that out-of-plumb walls are absorbed without cutting visible mouldings on site.
Information to send with your enquiry
- Floor plan and elevations of the bedroom or dressing room, with dimensions at multiple points.
- Photographs of the space, including corners, skirting and any obstruction.
- Wardrobe door type preference, or a note asking for advice based on circulation.
- Internal configuration: hanging lengths, drawer counts, shelving, luggage and accessory positions.
- Finish reference — a sample number, a photograph of an existing timber in the property, or a request to choose from our range.
- Delivery address and access details, including lift size and stair dimensions.
SANTERSON manufactures solid wood wardrobes and matching joinery to project-specific dimensions, layouts and finish options. Send drawings and site measurements for a made-to-measure proposal, or contact the team to discuss your project.