A set of wood veneer hinged doors looks finished on site but is cut to order in a factory, which means the information you send with an enquiry decides whether the leaves fit the openings, swing the way the plan intends and match the joinery around them. The measurements below are the ones we need to price and produce correctly; anything you can add about the project itself helps us check the rest.
What the product actually is
Our hinged doors sit in a residential collection where finish, layout and dimensions are specified per space rather than chosen from fixed sizes. Configuration covers made-to-measure sizing together with material and finish choices, so the door leaf, its face and its edge detail are all confirmed against your drawings before production starts. The same principle applies across the wider range: flush hinged doors for a wall-aligned look, wood veneer folding doors and wood veneer pocket doors where a swing leaf would crowd the room. Send the same measurement pack for any of them, plus the operating style you have chosen.
Opening dimensions to send for every door
Give us the structural opening and tell us what has already been built into it. Where an opening is still open concrete or studwork, say so; where a lining or frame is already in place, measure inside that lining instead.
| Item | What to record |
|---|---|
| Opening width | Three horizontal measurements across the opening (top, middle, bottom). Old openings are rarely square, and one number is not enough. |
| Opening height | Two or three vertical measurements, left jamb to floor, centre, right jamb to floor. |
| Wall build-up | Total thickness from face to face of the wall, and what the wall is made of, so the frame depth and any architrave can be matched. |
| Floor finish level | Whether the floor covering is already laid or still to come, and the intended finished floor level. This drives the undercut and the leaf height. |
| Plumb and square | Whether the opening has been checked with a level, and how far out it sits if it has not. |
Door leaf and frame details
Once the opening is fixed, the next group of numbers describes the door itself.
- Leaf size and quantity: width and height per leaf, single or paired leaves, and how many doors in total. List them by room or by a door schedule number so nothing gets mixed up on site.
- Handing and swing direction: which jamb the hinges sit on, and whether the leaf opens into the room or out of it. Do this for every opening; it is the most common thing to get wrong on a batch order.
- Frame type and depth: whether you want a face-applied architrave or a flush detail where the frame sits level with the wall finish, plus the frame depth that suits your wall build-up.
- Veneer species, grade and grain direction: name the wood and the cut, and say whether the grain runs vertically across the batch. Veneer is matched by tone and figure, so state which reference sample or board you are working from.
- Finish build-up: open natural, tinted, matt or full gloss surface, and how the edges are treated where the leaf meets the frame rebate.
Ironmongery, thresholds and clearances
Hardware changes the door construction, so it has to be known before cutting rather than after.
- Hinges: quantity per leaf, bearing size, finish, and whether concealed or surface-mounted hinges are wanted.
- Lock preparation: latch type, backset, case height from the floor, and any privacy, bathroom or office lock function.
- Handles and pull furniture: rose or lever on plate, through handles for paired leaves, and the finish to match other ironmongery in the project.
- Thresholds and transitions: door bottoms at thresholds, and how they meet engineered wood flooring, tile or carpet. If the floor levels differ between two rooms, tell us both levels.
- Swing clearance: what sits in the path of the open leaf, such as a wall return, a basin, a wardrobe side or furniture, plus any restriction from a ceiling line or skirting.
Project information that prevents rework
Doors are usually one line in a larger package, and the lines around them matter. As a one-stop furniture and building materials supplier, we often produce doors alongside the joinery they meet, which is why we ask for the surrounding context.
- Matching work: whether the doors should match wood veneer panels, wardrobe fronts or kitchen cabinetry in the same veneer, and which of those are already ordered.
- Drawing set: plans, elevations and any door schedule you hold, with the version date marked. A sketch with dimensions is acceptable for a small job.
- Site conditions: building type, whether the project is new build or renovation, and the environment the doors will live in.
- Delivery arrangement: destination address, whether you take delivery at site or through a forwarder, and how the batch should be packed and labelled for installation sequence.
- Sequence on site: which openings are needed first, so production and dispatch follow the install programme instead of arriving all at once.
How an enquiry moves forward
Send the measurements, handing and finish choices with your drawings, and we check them against how the doors will be produced. Our interior design services cover space planning, product specification and drawing coordination, while the wider turnkey solutions scope covers production, door-to-door logistics, installation and after-sales support for villa and hospitality projects. If you are assembling a whole fit-out rather than doors alone, send the room list and we will tell you what else needs measuring at the same time.