A product submittal is the document pack a buyer, contractor or designer reviews before a wardrobe order is released for production. For made-to-measure joinery such as Two Tone Acrylic Wardrobes, the submittal is where colour breaks, door layout and opening heights get settled on paper — the stage where a misunderstanding is corrected on paper instead of after panels have been machined.

Most disputes over built-in wardrobes trace back to an incomplete approval pack. The drawings were signed off without the finish sample. The panel thickness was quoted from memory. The interior layout appeared for the first time in a photograph after delivery. Below is the checklist we work to on residential wardrobe projects, and what each item should actually contain so that your approval signature means something.

1. Scope of supply and the drawings that define it

Start with a drawing set that states, in one place, exactly which rooms and which elevations are covered. A submittal for wardrobes should include room-by-room elevation drawings showing overall width, height and depth; the split between carcass sections; and how each run meets the ceiling, skirting and adjacent wall. Mark the floor finish level, because a two-tone door that reads correctly on a drawing can sit awkwardly against a thick carpet or a raised threshold.

For villa and apartment projects in Australia, note on the drawings which walls are structural, which are lined partitions, and where services run. Anchorage and clearance decisions follow from that, and it is far cheaper to record them now than during installation.

2. Finish schedule: the two-tone split stated in words and numbers

Two-tone acrylic fronts are the whole point of this product family, so the finish schedule has to be unambiguous. For every elevation, record which panel carries which colour, whether the darker tone sits on the door face and the lighter tone on the frame or the reverse, and where the transition line falls relative to handles and drawer fronts.

  • Colour reference for each tone as a code plus a physical sample number — never a colour name alone, since names are not shared across suppliers.
  • Gloss level for each surface, stated separately for the door face, edge and any internal panel.
  • Sample size and who keeps the approved reference copy after sign-off.
  • Direction of grain or sheen where a wood-effect tone is paired with a solid one.

Ask for physical finish samples before you approve, not photographs. Acrylic reflects light strongly, and two tones that look well separated on a screen can read as near-identical in a north-facing bedroom or under warm downlights.

3. Door type, opening geometry and clearances

State the operating principle for each wardrobe: hinged, sliding, pocket or open. The door type drives everything downstream — required clearance in front of the run, drawer placement inside the carcass, mirror thickness, and whether a handle or a recessed pull is used.

Item to recordWhy it belongs in the submittal
Door type per elevationDetermines clearance zone, hardware set and interior layout options
Number of doors and leaf widthsVery wide single leaves sag over time; split them at the design stage
Track, rail or hinge specificationLoad rating must match door weight, including mirror panels
Opening clearance in front of the runConfirms the wardrobe does not block a bed swing, doorway or bathroom entry
Handle, profile or push-open choiceAffects the visible line between the two tones

4. Interior layout and storage zones

A wardrobe submittal that shows only the outside faces is half a document. Include an interior elevation for each section: hanging rails with their heights split between long-garment and short-garment zones, shelf positions, drawer bank heights, and any open display niche or lighting provision. Confirm which items are included in the quoted price and which are optional accessories.

If a run is being coordinated with other joinery on the same project — Combination Modular Wardrobes in a hallway, or cabinetry in an adjoining dressing room — show the interface between them so the shadow gaps and trims line up.

5. Materials, substrate and edge treatment

The word "acrylic" describes the door face, not the whole panel. The submittal should state the substrate behind that face, the total panel thickness for doors, carcass and shelves, and how edges are finished — matching edge band, wrapped edge or painted edge. Edge detail is where a two-tone design either looks resolved or looks assembled, so ask for it to be shown on a detail drawing and confirmed on the sample.

Record shelf load assumptions too. A deep shelf carrying folded denim behaves differently from one holding light linens, and span limits follow from that.

6. Dimensional verification and site conditions

Because these wardrobes are made to measure, the submittal must say who took the site dimensions and when. State whether heights were measured off the finished floor level or the structural slab, and how out-of-plumb walls and uneven ceilings will be handled — scribe pieces, packers or a shadow gap. Any dimension that has to be re-verified after another trade finishes its work should be listed as a hold point.

7. Manufacturing, packaging and delivery terms

Include the production sequence: sample or first-article confirmation, then batch release, then packing. For wardrobe panels travelling internationally, ask how large panels are protected at the corners, how sections are numbered against the drawing set, and how hardware is separated from panels in the crate. A clear packing list keyed to room and elevation names saves a day on site.

Confirm Incoterms, container mix if wardrobes ship alongside other joinery, and who handles customs clearance at destination. Where a project also sources interior fixtures and finishes from the same supplier, consolidating shipments reduces both freight cost and the number of delivery appointments to manage.

8. Installation sequence and handover

The submittal should close with an installation plan: site preparation required before the panels arrive, the order in which runs are erected, who supplies the fixing to lined partitions, and how finished acrylic faces are protected while other trades complete nearby work. Then a snag list format and a record of what is covered after handover — spare doors, replacement hardware, and adjustment visits.

9. Approvals, sign-off and version control

Every page of the pack should carry the same revision number, date and project name. When a change is made after approval — a different tone split, an added drawer bank — it needs a new revision and a fresh signature, not a note in an email chain. State clearly which revision the factory will build to.

A short pre-approval check

  • Elevation drawings for every run, with dimensions tied to finished floor level
  • Two-tone finish schedule with codes, gloss levels and physical samples approved
  • Door type, leaf widths, hardware and front-of-run clearances
  • Interior layout per section, including what is included in the price
  • Substrate, panel thickness and edge treatment on a detail drawing
  • Named responsibility for site measuring and re-verification hold points
  • Packing list keyed to room and elevation, with agreed Incoterms
  • Installation sequence, protection plan and snag/handover process
  • One revision number across the whole pack, signed and dated

Specification note: finish availability, panel thickness options, hardware ranges and minimum order quantities for acrylic wardrobes vary by project and should be confirmed with the factory for each order. Do not carry figures over from a previous project's submittal.

If you are preparing a wardrobe package for a villa or apartment project, send us the room elevations and your shortlist of tones. We will return a submittal pack — drawings, finish schedule, interior layouts and packing plan — for review before anything enters production. Enquire through our contact page.