A custom outdoor swim spa is ordered on paper long before it reaches a site. For the Outdoor Swim Spa WS-PC07ST-L, the difference between a smooth production run and an expensive rework usually comes down to a short list of items agreed in writing: shell dimensions, equipment package, electrical supply, access route and the handover scope. This guide walks through each one from the buyer's side.
SANTERSON is a China furniture and building materials manufacturer working on villa, hospitality and office projects, and swim spas sit inside that wider supply scope alongside outdoor furniture, lighting, ceramics, cabinetry and wall finishes. Ordering a spa as part of the same package saves coordination effort, but it also means the specification has to be closed out properly before production starts.
1. What the Catalog Already Fixes for WS-PC07ST-L
Before negotiating anything, work from the published figures for this model. They set the baseline that every later decision is measured against.
| Item listed in the catalog | Value shown on the product page |
|---|---|
| Model | WS-PC07ST-L |
| Catalog dimensions (L x W x H) | 7490 x 2400 x 1470 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Filter pump | 1 pc |
| Jet total | 6 pcs |
| LED lights | 4 |
| Total power | 6.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Two details in that table deserve attention before an order is placed. First, the catalog does not list a water pump for this model, while it does list one filter pump — so the pump arrangement actually supplied must be stated on the proforma invoice, not assumed from a sibling model. Second, total power is given as 6.55 kW; that number drives the electrical design and changes if optional equipment such as a heat pump is added.
Model suffixes matter more than buyers expect. The catalogue lists WS-PC07ST at 7000 x 2400 x 1470 mm and WS-PC07ST-S at the same length, while WS-PC07ST-L is shown at 7490 mm — nearly half a metre longer. The -S variant also carries an automatic cover option that the -L listing does not show. Quote the full model code in drawings and purchase orders, because slab dimensions and cover provision both follow that suffix.
2. Confirming the Equipment Package Line by Line
Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs a yes or no in writing rather than a tick box on a brochure.
Filtration and sanitation
- Which filter pump is included, and its flow rate against the water volume of the 7490 x 2400 x 1470 mm shell.
- Whether ozone is the only sanitation method supplied, or whether UV sterilization is added as an option for the project.
- Whether sand filtration replaces or supplements the standard filter arrangement, and where the filter equipment sits relative to the spa for servicing access.
Heating and insulation
- Is a heat pump included, and if so what is its capacity and how does it change total connected power beyond the 6.55 kW figure?
- What insulation is specified for the shell and cover, which matters more in cool-climate villas than in sheltered courtyards.
- Who supplies the thermal cover, and whether it is packed in the same container as the spa.
Jets, lighting and swim training
- Six jets are listed in total. Confirm their positions on the shell drawing, because jet layout determines where a swimmer sits relative to the current.
- Four LED lights are listed. Confirm colour mode, control method and whether lighting is tied to the same control system as the pumps.
- The swim training system is listed as one set. Ask what the set contains — nozzle, flow control and mounting hardware — and how it is operated from inside the water.
3. Site Conditions That Decide Whether Installation Works
A production order is also the point at which site conditions need to be settled. The items below are handled by local trades, and each one should be checked against the approved drawing before the shell leaves the factory.
- Structure and support. A spa of this footprint carries a large water load. The slab, plinth or recessed pit must be engineered locally to carry it, with the bearing area matching the shell base shown on the drawing.
- Electrical supply. With 6.55 kW of listed equipment, the incoming supply, circuit protection and cable route must be designed by a local electrician to the rules of the project's country.
- Drainage and plant room. Drainage for backwash, overflow and maintenance emptying needs an agreed route, plus space near the equipment compartment for filter cleaning.
- Access for delivery. A shell over seven metres long has to reach its position. Check gate widths, turning radii, crane or forklift access, and whether the spa can be set before surrounding paving or landscaping is finished.
4. Customisation: What to Agree Before Production Starts
Beyond the standard catalogue items, custom and OEM service covers bespoke finishes, materials and configuration work for project buyers. For a swim spa order this is the window where the following should be settled:
- Shell colour and finish, plus coping or decking edge detail where the spa meets the surrounding terrace.
- Steps arrangement and which side of the shell they sit on, checked against the site plan rather than a stock photo.
- Control system placement — wall-mounted, equipment-compartment mounted, or both — so the cable run is built into the shell at factory stage.
- Optional shapes. Where a project calls for something other than a rectangular footprint, the customizable shape outdoor spa line covers square, round, oval and curved designs in an acrylic shell with structural reinforcement.
Anything decided after production begins becomes a change order. Treat the approved drawing as the contract document.
5. Packaging, Freight and Handover
Swim spas travel by sea freight with the rest of a project package. The logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery.
For a spa order specifically, agree the following before the container is loaded:
- Container type and how many units fit per container, which changes the landed cost per unit.
- Incoterms for the shipment, who arranges insurance, and who handles import clearance at destination.
- Packaging for fragile components — LED fixtures, control panels, jet trim — and whether spares travel in the same consignment.
- Unloading responsibility at site: the supplier delivers, but offloading and positioning normally need a local crane or crew.
After arrival, installation support, inspection with a snag list, warranty coverage, spare parts and maintenance fall under installation and after-sales support. Warranty terms, response times and exclusions should be read carefully and confirmed for the destination country, since on-site service availability differs by region.
6. Ordering a Swim Spa with the Rest of the Project
Buyers rarely order a spa alone. Poolside loungers, pergolas, outdoor dining sets, changing-room cabinetry, wall cladding and lighting all surround it, and one supplier handling the whole scope means one set of drawings, one container plan and one point of contact — see one-stop solution for how that coordination is organised.
That is also where the commercial argument sits. Rather than juggling a spa vendor, a furniture vendor and a fit-out contractor, SANTERSON furniture and building materials supply runs from design consultation and material selection through manufacturing, project management and handover, which supports the villa and hospitality work listed in the project cases section.
Figures quoted above — 7490 x 2400 x 1470 mm, 6 jets, 4 LED lights, 6.55 kW total power — are the values published on the WS-PC07ST-L product page and apply to the standard configuration. Optional equipment changes connected power and dimensions. Confirm the final specification for your configuration with SANTERSON before ordering.
Before you place a production order for WS-PC07ST-L
Send the site plan, the intended equipment options and the destination port. The team checks the pump arrangement, power load and access route against the configuration you need, then issues drawings for approval.
Contact: https://www.santerson.com/contact/ | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com