A storage and display combination looks simple on a drawing: open niches here, closed doors there, the television centred on the wall. On site it is rarely simple. Shelf heights arrive wrong, two finishes that matched on a sample board do not match under the room lighting, and cable provisions end up behind a fixed panel. The finish schedule, more than the layout, decides whether a Santerson Storage & Display Combo installs cleanly or turns into a list of site adjustments. This guide sets out what a buyer, contractor or designer should have written down before an order is placed.

What the Product Page Actually Specifies

The Santerson Storage & Display Combo sits in the Media & TV Walls collection and is described as a configurable combination of closed storage and open display, with finish, layout and dimensions specified to suit each space. That description is honest about one thing: it is a system built per project, not a catalogue item with a fixed specification sheet. Made-to-measure sizing, material and finish options, and a layout tailored to the project are what you order; the numbers behind them come from your drawings.

This has a practical consequence for procurement. Two projects can order the same named product and receive different panels, different hardware and different lighting provisions. So the enquiry should not stop at the product name. It should attach the finish code, the elevation, the opening schedule and the electrical layout, because those documents are what the factory works from.

A useful test before you submit an enquiry: if a detail is only described in words on your drawing — "matching shelf", "soft close", "concealed lighting" — it is not yet specified. Write it as a code, a dimension or a hardware reference.

Surface Finish: The Decisions That Cause the Most Rework

1. Name the finish by code, not by colour word

"Walnut", "oak" and "grey" are marketing words shared by many different surfaces. On a media wall you may be combining a veneer panel, a lacquered door and a laminate carcass, and each of those can be offered in the same colour name with visibly different results. For matching work across rooms — wardrobes, tall cabinets, panelling — request the supplier's finish reference for every component and record it in your own schedule.

Where the design depends on wood grain, ask which veneer cut and grain direction will be used, and whether panels are matched or book-matched. A grain pattern that reads well on a single door can look busy across a full-height run of open display niches.

2. Confirm sheen level, not just surface type

Matte, satin and high gloss are often treated as finish names when they are really two separate choices: the surface material and its sheen. Sheen changes how a wall reads in a lit living room far more than hue does, and it also changes how fingerprints, dust and edge wear show up on doors that get opened daily. If your specification calls for a matte door beside a gloss display cabinet, ask for both samples under the same light source before sign-off.

3. Decide how edges, profiles and handles are resolved

  • Edge treatment on open shelves and niche reveals — matched, contrasting or a visible substrate line.
  • Door profile: flat slab, rebated panel or handleless reveal. A handleless detail needs an agreed finger clearance at every door.
  • Handle and knob finish, and whether hardware is supplied by the cabinet maker or procured locally.
  • Shadow gaps and trims where the unit meets plasterboard, skirting or a ceiling line — these are the details that make a built-in look designed rather than fitted.

4. Check finish continuity across adjoining products

Media walls rarely stand alone. If the same finish continues into Walnut Veneer Wardrobes, a tall cabinet or Wood Veneer Panels on the opposite wall, then the batch, veneer lot and sheen have to be coordinated in one order rather than three. Placing them separately is the most common way a project ends up with two "identical" woods that do not sit next to each other.

Substrate, Carcass and Structural Confirmation

The visible door finish gets all the attention, but the carcass is what carries the load. For a wall system that will hold books, display objects and a screen, confirm in writing:

  • Board material and thickness for carcass, shelves and back panels, and which spans need reinforcement or a thicker shelf to avoid deflection.
  • Maximum unsupported shelf span and the load rating your design assumes — state the intended use of each niche, not just its size.
  • Fixings to the wall build: solid backing or noggins where the unit anchors, and who supplies them. Where a TV is fixed to the panel rather than the wall behind it, the fixing detail must be agreed before the panel is manufactured.
  • How the unit accommodates floor and ceiling irregularities — scribe pieces, concealed levelling legs or an approved shadow gap.

Open Display Side: Shelves, Glass and Lighting

The display half of a Storage & Display Combo is where finish quality is most exposed, because there is nothing hiding it. Settle these points before production:

  • Shelf depth and vertical spacing per niche, fixed or adjustable, and the pitch of adjustment holes if adjustable — visible hole rows are a finish decision in themselves.
  • Glass type where used: clear, low-iron, tinted or ribbed; thickness; and whether edges are polished and arrised.
  • Lighting inside niches. Santerson Integrated Cabinet Lighting is configurable, so treat it as part of the joinery order: confirm the electrical specification and its compatibility with the cabinet design, plus driver location, switching, colour temperature and whether the tape or profile sits in a routed channel.
  • Cable routes for the screen, soundbar and any devices, including where the trunkings land and how they stay hidden behind a fixed or removable panel.

Closed Storage Side: Doors, Interiors and Hardware

  • Door type and swing — hinged, sliding or lift-up — plus the clearance each mechanism needs for full travel, especially next to a handleless run.
  • Hinge and slide brand or grade, soft-close provision, and whether hardware is inset, concealed or surface mounted.
  • Interior fit-out: fixed versus adjustable shelving, drawer units, pull-out trays, and any integrated power points inside closed cabinets for charging or devices.
  • Ventilation where equipment sits behind a door, since heat build-up affects both electronics and the panel finish.

Documentation to Lock Before Production

Item to confirmWhat "confirmed" looks like
Finish scheduleOne line per component: surface material, finish code, sheen, edge treatment, grain direction
Elevations and setting-outOverall width, height and depth; niche dimensions; TV centre line and screen size; ceiling and floor conditions
Opening scheduleEvery door and drawer: type, size, hardware reference, swing or travel direction
Electrical layoutNiche lighting specification, driver position, switch positions, TV and device cable drops
Interface detailsSkirting, cornice, adjacent wall finish, reveal sizes and scribing allowance
Packaging and deliveryPanel identification marks keyed to the elevations, delivery address and access route
Installation scopeWho sets out, fixes, connects lighting and clears snags at handover

Samples, Approvals and Tolerance Checks

Before the main order is released, ask for a physical sample of each surface in the schedule — door face, shelf edge, and any glass or metal trim — and view them together in the actual room. Light temperature changes how veneers and lacquers read, and a sample approved on a bright factory desk can look different under warm residential lighting.

Then verify the two measurements that most often fail on site: the finished overall dimensions against the as-built wall, and the position of services against the drawing. Where the wall build is still open, a quick site re-measure after plastering costs far less than re-making a full-height panel.

SANTERSON's stated workflow runs from design consultation and material selection through production, logistics and installation support, so approvals are best handled as part of that sequence rather than as an afterthought once goods are in transit. If the unit is shipping internationally, agree the identification marks on each panel against your elevations before packing; a labelled crate is what makes a two-person install straightforward.

A Short Pre-Order Checklist

  • Finish code, sheen and edge treatment recorded for every component, not just the doors.
  • Veneer batch and grain matching agreed where finishes continue into wardrobes or panelling.
  • Shelf spans and load assumptions stated per niche; reinforcement confirmed where needed.
  • TV fixing method and backing detail fixed before panel manufacture.
  • Niche lighting electrical specification and driver location confirmed with the cabinet design.
  • Hardware brand, grade and supply responsibility named.
  • Samples approved in situ, on-site re-measure completed after wet trades.

Related configurations in the same collection include Santerson Full Height Media Walls, Santerson Integrated TV Panels and Santerson Open Display Units. If your design mixes closed storage with lit display, review the finish schedule across all of them in one pass.

Send us your elevation and finish schedule

Share the room drawings, the surfaces you want matched and the equipment you plan to mount, and we will confirm dimensions, materials, hardware and lighting provisions for a storage and display wall built to your project.

Contact: PHILLIP · Phone/WhatsApp +86-13928214007 · Email santerson@qq.com · Contact page