A wardrobe quotation is easy to compare on price and hard to compare on substance. Two suppliers can both quote a melamine two-tone wardrobe for the same bedroom and still deliver very different results, because the difference sits in the line items that never appear in the headline number: how the panel sizes were derived, which face material and edge treatment sit behind the colour sample, what the internal layout actually contains, and who signs off the drawings before production starts. This guide walks through the sections of a manufacturer’s proposal for Two Tone Melamine Wardrobes and shows what to verify in each one before you approve an order.
1. Check that the proposal is priced on your actual openings
Melamine wardrobe pricing is normally derived from developed panel area or from a run-metre rate, so the measurement basis decides whether two quotes are comparable at all. A proposal built on nominal room dimensions rather than surveyed ones will be re-costed later, once the installer finds out-of-square walls, a ceiling that drops toward one corner, or a skirting board that stops a carcass sitting flat.
In the proposal, look for these items before accepting any figure:
- The measurement source: a site survey, an architect’s joinery schedule, or a dimension supplied by you. If it is the last one, ask who carries the cost of a correction.
- Whether each wardrobe run is dimensioned individually, including the return at a corner and the depth at a doorway reveal.
- How the top closure is treated — a scribe panel, an integrated pelmet, or a cut to a soffit line. A missing scribe is the most common add-on after order.
- Whether the quoted height assumes a finished floor level, and which floor build-up that assumption uses.
Santerson builds these wardrobes to made-to-measure sizing, with the layout and dimensions set per project rather than selected from fixed widths. That removes the “nearest standard size” compromise, but it also means your approval drawing, not the catalogue page, becomes the contractual reference. Read it as such.
2. Match the colour sample to the face material and the edge
“Two tone” describes a pairing, usually a darker body or door field against a lighter frame, shelf or carcass interior, or the reverse. Two manufacturers can reproduce the same pair of colours with different surface structures, and the difference shows under bedroom lighting and after a year of use.
Ask for these details in writing against each colour reference:
- The face material family. Within melamine wardrobes, the finish options on this site include matte, textured, wood grain, solid colour and glossy finish surfaces. A wood-grain board and a solid colour board age differently at the edges, so state which one each tone uses.
- The edge treatment: factory-applied edge banding matched to the panel, or an on-site post-forming. Matched factory edging on door edges and all visible shelf fronts is what keeps a two-tone scheme reading as designed rather than assembled.
- Whether both tones come from the same board range and batch series. Mixed ranges are where a “matching” grey turns warm or cool between doors and carcass.
- The direction of any grain on textured and wood-grain boards, and how door handles or integrated pulls sit relative to that direction.
3. Read the internal layout as a list of components
The internal configuration is where a wardrobe either serves the household or becomes expensive dead space. A proposal that says only “standard internal layout” has not committed to anything.
| Component | What the proposal should state |
|---|---|
| Hanging areas | Single or double hang, rail heights, and whether any rail is lowered for a shorter user. |
| Shelving | Number of shelves, shelf depths, and which shelves are adjustable on pegs versus fixed. |
| Drawer banks | Drawer count, soft-close provision, and whether drawers sit behind doors that need a clearance allowance to open. |
| Open display sections | Whether an open bay is included, and how its carcass edges are finished on show faces. Minimalist open wardrobes in the same range pair open bays with closed fields for exactly this reason. |
| Corner and return units | Whether a corner is fitted with a carousel, angled shelving or a simple square return. Each has a different cost and access profile. |
| Lighting | If interior lighting is offered: fitting type, cable route, transformer location and where the supply point must be left on site. |
Where a project needs more than one wardrobe type across several rooms — sliding doors in a narrow corridor, hinged doors in a main bedroom, an L shaped walk in wardrobe in a dressing room — ask for the components to be listed per unit rather than as one blended allowance. Blended allowances are where scope quietly narrows.
4. Confirm the interface with the building, not just the furniture
A built-in wardrobe is a joinery item inside a building envelope, and most disputes arise at that interface rather than in the panel itself. The proposal should say what the manufacturer needs from site: finished floor levels set, plaster completed and sanded, electrical first-fix positions confirmed, and a dry, enclosed space for delivery.
- Ask how the unit is fixed to the wall and whether the wall build-up can carry it. Tiled, insulated or lightweight partition walls need different fixings.
- Confirm where sealing and silicone are the manufacturer’s job and where they are the site contractor’s.
- If the wardrobe passes under a bulkhead or around a beam, check that the drawing shows the reduction in clear hanging height it creates.
5. Test how the manufacturer handles changes and handover
The sections below are usually where a supplier with real project experience separates itself from a workshop that only sells standard sizes.
- Approval stage. Is there a drawing set you sign before cutting, and is a revision window stated? Santerson’s stated cooperation steps run from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up — which means your detail confirmation is the point at which every dimension above should already be closed.
- Custom scope. The Custom & OEM service covers bespoke finishes, textures and material choices alongside design and prototyping. Useful when a scheme needs a tone that is not in the standard range; ask what the change costs and how long it adds before you request it.
- Packaging and delivery. Panel protection, pallet build, and whether delivery goes to site or to a port or depot. Confirm who carries risk between those points.
- Installation and after-sales. Ask which scope is installed by the manufacturer’s team and which by your trades, what snags are inspected at handover, and what the warranty covers for panels, edging, hinges and runners respectively. Response-time and warranty wording on a website is marketing until it appears in your order terms.
Pre-approval checklist
1. Measurement basis named, with each run dimensioned and top closure priced.
2. Both tones specified by face material, edge banding and grain direction, not colour name alone.
3. Internal components listed per unit: rails, shelves, drawers, open bays, corners, lighting.
4. Site prerequisites and fixing method stated against the actual wall build-up.
5. Signed approval drawing before production, with a revision window defined.
6. Delivery, installation and after-sales scopes separated, each with a named owner.
A worked comparison: same two tones, different proposals
Take two quotations for a bedroom run of the same length in a matte charcoal and light oak pairing. The lower one prices by linear metre at a single height, assumes standard shelf spacing, and lists edging as “matched” without saying whether drawer fronts and open bay edges are included. The higher one prices developed area, shows a scribe panel to an uneven ceiling, lists adjustable shelves with peg detail, and names factory edge banding on every visible edge including the return at the doorway.
The second proposal is usually the cheaper project once site variations are counted, because it has already priced the conditions you were going to discover during installation. That is the assessment to make: not which number is smaller, but which document has already absorbed the unknowns.
Send your drawings for a line-item review
Santerson manufactures built-in furniture including wardrobe ranges under Built-in Furniture, with project-specific dimensions, layout and finish selection. Share your room dimensions, preferred tone pairing and internal layout requirements, and the returned quotation will state panel sizes, materials and configuration item by item so you can compare it against competing offers on the same basis.