An arched French door is one of the few openings that changes how a room reads from both sides. It frames light, sets the height line for cabinetry and wall panelling, and it is expensive to change once the opening is built. That is why the buyers who get the best results on villas and hospitality projects ask precise questions before the order is placed, not after the drawings come back. Below is the checklist we use when a client enquires about Santerson Arched French Doors, and the answers you should expect from any supplier you are evaluating.
1. What exactly is being measured on site?
Arched units are not a standard width times standard height calculation. The clear opening, the springing point where the curve begins, the radius of the arch and the finished floor level all have to be recorded together, and they have to be recorded after the floor build-up is known. Ask the supplier how they want those dimensions submitted and who verifies them.
- Whether you supply opening dimensions or the supplier sends a measurement sheet with the springing height and radius called out separately.
- Whether tolerances for plaster, render and floor finishes are deducted by you or allowed for by the factory.
- How the arch is set out on site, and whether a template or setting-out drawing is provided before installation.
Santerson Arched French Doors are made to measure for each project, so this conversation happens at quotation stage rather than at delivery. If a supplier will not discuss measurement responsibility in writing, treat that as a warning sign.
2. Which material and finish are you actually specifying?
The same arch profile can be built in several substrates and finished in several ways, and the specification changes both the price and how the door ages. Product pages usually show a configurable overview rather than a fixed bill of materials, so ask for the exact construction: core, frame material, glazing type, gasket and hardware set, and the finish system with its sample reference.
- Wood, engineered panel, metal frame and veneer options behave differently in humid bathrooms, coastal villas and high-traffic hotel corridors.
- Ask for a physical finish sample before signing off a colour, not only a rendered image on a drawing.
- Confirm the glazing build and whether the glass is clear, low-iron, patterned or acoustic, since that decision follows from the room's use.
If the arch detail sits within a wider joinery package, it is usually simpler to specify it alongside Classic French Double Doors or Santerson Modern Slim Frame French Doors in the same order, so the profiles, hardware and finishes are produced against one reference.
3. Who coordinates the door with the surrounding works?
A made-to-measure arch fails most often at the interface: the wall thickness, the reveal, the architrave detail and the ceiling line above the curve. Before ordering, agree which party is responsible for the opening preparation, who supplies the lining, and how the door leaf clearance relates to skirting, drapery tracks and any nearby panelling.
For whole-project work this is where a whole-space indoor and outdoor furnishing service earns its keep. Doors, wall panelling, cabinetry and flooring are drawn together, so the arch does not arrive as an isolated item that clashes with a joinery elevation produced by a different vendor.
4. How is the order confirmed before production starts?
Ask what you will receive in writing and when. A clear sequence protects both sides: drawing and specification approval, quotation with the confirmed configuration, then production release. Anything vague at this stage becomes a change order later.
- Signed-off shop drawings with dimensions, handedness of each leaf, opening direction and ironmongery schedule.
- A stated configuration list: sizes, finish code, glass build, hardware set and any arch radius confirmation.
- The point at which changes stop being free, because re-work on a curved frame is not the same as re-cutting a straight one.
Santerson's custom and OEM service covers bespoke finishes, textures and prototyping for projects that need the arch to match an existing joinery language rather than a catalogue profile.
5. How does it travel, and what arrives in which container?
Curved frames are awkward freight. Ask how the units are packed, whether glazing travels loose or fitted, how the arch heads are protected against point loading, and how the consignment is grouped with the rest of the fit-out. Then confirm the delivery terms you are buying under.
- Packaging method and container loading plan for oversized and irregular items.
- Which documents the supplier prepares, and which import formalities sit with you.
- Whether the doors ship together with the rest of the joinery or on a separate movement, and how that affects site sequencing.
Santerson arranges freight forwarding, customs paperwork and door-to-door delivery as part of project logistics, but the practical terms for your destination should be confirmed case by case rather than assumed.
6. Who installs it, and what happens afterwards?
Hanging an arched leaf is a different trade from hanging a flat panel door. Establish whether the supplier provides installation or on-site guidance, what the site team must prepare in advance, and how defects and spare parts are handled once the project is handed over.
- Whether an installer attends, supervises, or supplies instructions to your local contractor.
- The snag and inspection process before practical completion.
- Availability of replacement hardware and glass for a curved unit years later.
Installation support, snags and spare parts are listed services on this site, so ask which of them apply to your project and in what scope before the order is released.
A short pre-order checklist
- Opening, springing height, arch radius and finished floor level recorded and cross-checked.
- Material, core, glazing and finish confirmed with a physical sample reference.
- Handedness, opening direction and ironmongery schedule on approved drawings.
- Interface details agreed for wall thickness, lining, architrave and ceiling line.
- Packing, container grouping and delivery terms stated in the quotation.
- Installation responsibility, snag process and spare-parts route written down.
Working through these six questions before you commit turns an arched French door from a risky custom item into a straightforward line on a purchase order. Send us the opening dimensions, the room's use and the drawings you already have, and we will confirm the configuration, finish options and coordination scope for Santerson Arched French Doors as part of your wider villa or hospitality package.
Enquiries reach our team through the contact page, where we review drawings and confirm specification, packing and delivery scope for each project.