A swim spa quote is only comparable when every supplier is pricing the same scope. Two quotations for Outdoor Swim Spa WS-PC06ST can look equally complete and still differ sharply in price: one includes a heat pump, insulation and steps, the other lists the shell and pumps only. The checklist below is what we ask buyers to put into an RFQ so that specifications, options, delivery terms and responsibilities are all on the table before a price is compared.
Start with the catalogue data you already have
WS-PC06ST sits in our configurable outdoor swim and hydrotherapy range. The catalogue entry for this model shows an overall envelope of 5900 x 2400 x 1470 mm, one control system, one swim training system, one filter pump, six water jets, four LED lights and a total power figure of 6.55 kW. Copy those figures into the RFQ rather than paraphrasing them, and ask each supplier to confirm line by line what their price covers. Two practical cautions apply before you send it:
- The published specification list for this model does not name a separate water pump, so treat the 6.55 kW total as configuration-dependent and request a full equipment schedule with each item's rating.
- Confirm the electrical supply available at your site: phase, voltage, dedicated circuit sizing and protection. State it in the RFQ. Electrical requirements vary by the options you select, and this is where local electricians and import standards have to be reconciled early.
State how and where the spa will be used
The same shell can be specified very differently depending on the duty it has to perform. Tell the supplier:
- Primary use. Daily swim training against the swim system, hydrotherapy and massage sessions, or a mixed family and guest routine. Jet layout, seating depth and control placement follow from this.
- Climate and season. Whether the unit runs year-round in a cold or exposed outdoor location, or seasonally. This drives insulation, heating capacity and cover requirements.
- Installation setting. Above-ground on a prepared slab, partly recessed, or under a pergola or roof structure. Note access for delivery, the bearing capacity of the base, drainage around the unit, and distance to the power supply.
- Occupancy. Typical number of bathers at one time, which affects water treatment capacity and maintenance intervals.
List the options you want priced as separate line items
Our catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options for this range. Availability and compatibility vary by model, so ask for them as numbered add-ons with individual prices instead of a bundled "full package". That way you can compare like for like and decide later what to drop.
| Option | What to specify in the RFQ |
|---|---|
| Heat pump | Required water temperature, ambient design temperature, and whether heating runs continuously or on a timer |
| Insulation | Covered areas (shell, base, side panels) and cover type for the spa itself |
| Filtration | Filter pump duty, sand filtration yes or no, run hours per day expected |
| Water treatment | Ozone is listed for this model; ask whether UV sterilisation is added and how dosing is maintained |
| Steps and access | Step configuration, handrail needs, and whether steps are fixed or removable |
| Lighting and controls | Number of LED points, colour options, control system interface and remote operation |
Ask for the commercial terms in writing
Once the technical scope is fixed, the remaining differences between quotations are commercial. For a project purchase we recommend the RFQ require:
- Delivery term and place. State your Incoterm and destination, and ask what the price excludes: import duty, local taxes, port charges, inland freight to site.
- Packaging and container plan. How the shell, plant and accessories are packed and loaded, and how damaged items are reported on arrival.
- Warranty scope. What is covered, for how long, which parts are consumables, and who supplies spare parts after the warranty period.
- Installation and commissioning. Whether guidance, remote support or on-site commissioning is included, and what the site contractor must complete beforehand.
- Payment and lead time. Deposit, balance trigger (before shipment or on bill of lading), production lead time, and how changes to the option list affect both.
Coordinate the spa with the rest of the outdoor package
A swim spa is rarely bought alone. Poolside loungers, a shaded pergola, outdoor dining and storage for towels and chemicals usually arrive in the same phase of a villa or resort project. Buying these through one one-stop furniture and building materials supplier reduces the number of container schedules, inspection points and warranty contacts you have to manage. See our Swimming Pools and Swim Spas range alongside Outdoor Furniture for Villas and Resorts. For buyers in Australia, sourcing the pool area together with interior joinery, bathroom fixtures and lighting is also how we keep a single project coordinator responsible for handover on villa projects.
A short RFQ template you can copy
- Project name, site address, delivery destination, target installation date.
- Model reference and catalogue dimensions; the equipment schedule you want confirmed (pumps, jets, swim system, lights, controls).
- Option list priced individually: heat pump, insulation, sand filtration, UV, steps, covers.
- Site conditions: base type, recessed or above-ground, roof or shade structure, phase and voltage available, distance to power.
- Required documents: equipment schedule with ratings, dimensioned drawings, packing list, warranty terms, spare-parts list.
- Commercial request: price by line item, Incoterm, lead time, payment terms, what is excluded.
Note: figures quoted above are the values shown on the WS-PC06ST catalogue page and should be reconfirmed against the configuration you order. Options differ between models in this range, and electrical requirements change with the equipment selected.
Send us your RFQ. Tell us the model, your site conditions and the options you want priced, and we will return an itemised quotation with the equipment schedule and delivery terms for Outdoor Swim Spa WS-PC06ST or a closer alternative from the same range.
Contact: PHILLIP, Phone/WhatsApp +86-13928214007, Email santerson@qq.com, Contact page