Laundry is rarely on the shortlist of items a project team reviews early. It sits at the back of a corridor, behind a door, and gets specified last. That is exactly why it causes problems later: a machine that does not fit, services that land in the wrong place, or a stack of linen carts with nowhere to go. A purpose-built enclosure solves all three at once. Our WasherDryer Cabinets are made-to-measure joinery that houses washing and drying equipment inside a finished cabinet, sized to the room rather than the other way around. Below is where this type of cabinetry earns its keep in hotel and villa work.
Serviced apartments and extended-stay rooms
This is the most direct application. A one- or two-bedroom serviced apartment is sold on the fact that a guest can do their own laundry, so the machine has to be visible enough to find and discreet enough not to dominate a compact room. A cabinet lets you place the appliance under a counter in the kitchenette, inside a hallway cupboard, or in a bathroom alcove, with the door closed and the front finished to match the rest of the joinery.
Two practical points matter more than appearance here. First, the machine is on a plinth or an open recess rather than sitting straight on the floor screed, which keeps the base clear for cleaning and protects the cabinet carcass from spillage. Second, the enclosure is planned with access panels behind it, so a plumber can reach taps, waste and the fill valve without removing the joinery. Where the room is very tight, Compact Laundry Solutions cover the same brief in a smaller footprint.
Hotel floors that need their own laundry point
Not every hotel runs all laundry off-site. Small boutique properties, guesthouses, hostels and serviced residences often keep a machine or two on each floor for staff use, for guest self-service, or for handling an overflow during high occupancy. In these situations the room available is usually a leftover sliver of floor — under a stair, at the end of a corridor, inside a housekeeping niche.
Standard off-the-shelf laundry furniture rarely fits those gaps. Made-to-measure cabinetry fills the recess exactly, and vertical space does the rest: Stacked Laundry Units put the dryer above the washer and free up the floor for folding, while Multi Function Tall Cabinets carry detergents, spare linen and equipment in the same run of joinery. That keeps a housekeeping store working as one unit instead of three separate pieces of furniture competing for the same corner.
Villas with a utility room or back-of-house corridor
In a private villa, laundry is a design question rather than a plumbing one. A family villa in a suburb such as North Turramurra, or a coastal house where towels and beach linen run through the machine constantly, usually has a dedicated utility room off the kitchen or garage. The brief there is storage capacity: hampers, ironing surfaces, hanging rails for delicates, shelving for supplies, and enough counter to sort a week of washing.
This is where a Laundry & Storage Combo does more work than a simple machine housing. The cabinet carries the appliances, the folding surface and the storage in one continuous run, finished to match the kitchen cabinetry so the utility room reads as part of the house rather than an afterthought. Pull-out hampers inside the carcass keep dirty linen out of sight and remove the plastic baskets that collect in a corner.
Guest villas and short-let properties
A villa rented by the week has a different requirement: guests need to wash, but they should not see the machine while they are living in the house. The usual answer is a concealed enclosure in a service corridor, a bathroom vestibule, or a cupboard under the stairs, closed with a door that matches the wall panelling around it.
Because we build to your drawings, the cabinet can be finished on both faces — the side facing the guest and the side facing the plant or services behind it. Where a property has several units sharing one laundry point, the same enclosure design repeats across rooms, which keeps the joinery schedule simple and the cost predictable.
Staff accommodation and resort back-of-house
Resorts and larger hotels employ staff who live on site or nearby, and those rooms need laundry too. Staff quarters are specified quickly, in volume, and on a tight budget, so the enclosure has to be durable rather than decorative: a board that takes knocks, hardware that survives daily use, and a layout that is identical from room to room so maintenance staff learn one arrangement.
The same specification also works for the villa compounds and apartment blocks around a resort, where each unit gets an identical laundry enclosure. Repeating one detail across many rooms is where made-to-measure joinery pays back — you approve a sample once and the rest follow.
What to send us before we quote: the appliance make and model, or at least its width, depth and height; where the water inlet, waste and power point sit in relation to that space; whether the machine is to be stacked or side by side; and the finish you want the doors and carcass matched to. With those four items we can produce a layout for your review.
How the specification works in practice
Each unit in the Laundry Integration collection is built to your dimensions, with material and finish selected per project. That means the same enclosure type can appear as a stainless-steel-edge utility cabinet in a staff block, a handleless matt cabinet in a serviced apartment, and a full-height run matching the kitchen in a villa. The construction stays consistent; the appearance follows the project.
We supply these cabinets as part of a wider fit-out package alongside bathroom fixtures, cabinetry, joinery and interior products, so the laundry enclosure arrives on the same delivery as the rest of the joinery and is finished by the same trade. For a project covering several buildings or room types, that single point of supply removes one coordination headache from the site programme.
It also keeps the laundry detail consistent with everything else you order from us. As a villa furniture and interior project supplier, we build wardrobes, vanities, tall cabinets and wall panelling to the same drawings, so the cabinet doors, handles and carcass edges in the utility room match the joinery in the bedrooms and bathrooms without a second supplier having to interpret your schedule.
Questions we are asked most often
Can the cabinet hide a stacked washer and dryer?
Yes. A stacked pair sits in a single vertical recess with the doors running full height, or with the machine section left open and everything above it enclosed for storage. Tell us the stack dimensions and we work the rest around them.
Does the enclosure need ventilation?
Condenser dryers in particular need air to work efficiently, so the door or side panels are detailed with grilles or gaps sized for the appliance you have chosen. We set this out on the drawing before production rather than leaving it to the installer.
Can the doors match existing kitchen cabinetry?
Yes, and this is the usual request in villas and serviced apartments. Send the door profile and finish you are using elsewhere on the project, or pick from our material and finish options, and the laundry cabinet carries the same look.
Is this only for bathrooms?
No. The collection sits under bathroom and sanitary fixtures because that is where most projects place it, but the enclosures go into kitchenettes, utility rooms, corridors and plant cupboards just as readily.
Tell us the room, the appliance and the finish, and we will send back a made-to-measure laundry enclosure for your hotel or villa project. As part of our wider range of bathroom sanitary fixtures, it is specified with the rest of your fit-out package rather than as a separate purchase.