A toilet is one of the smallest items on a bill of quantities and one of the most expensive to get wrong. Once the waste outlet, rough-in dimension and floor level are set in a bathroom slab or wall cavity, changing the specification later means breaking finishes, re-piping and re-tile work that no project manager wants to absorb. The checklist below is written around our washdown one piece toilet, model 1003A, and it applies just as well when you are comparing any close-coupled WC for a villa, hotel or commercial washroom package.
Why the checklist starts before the product page
Most specification failures on sanitaryware are not quality failures. They are dimension and drainage mismatches caught at installation. A buyer who confirms outlet type, rough-in measurement, water supply position and mounting detail before choosing a model avoids the majority of site problems. Everything in this checklist is something you can answer from drawings and a site survey, so it belongs in your procurement file next to the shop drawings.
1. Outlet type and rough-in dimension
This is the first box on the list and the one that decides whether a toilet can be installed at all. Close-coupled WCs are made for two common drainage arrangements, and a single model may be produced in both.
- P-trap (wall drain). The waste leaves the pan horizontally into the wall. On the 1003A this is supplied for a 180 mm rough-in, measured from the finished wall face to the centre of the waste outlet.
- S-trap (floor drain). The waste drops through the floor with a short rear connection. On the 1003A this option is built to a 250 mm rough-in.
Check the finished wall face, not the structural wall. Tiling, waterproofing and any framed cavity change that dimension by centimetres, and a 20 mm error is enough to leave a gap or prevent the pan from seating. Record the measurement for every bathroom, not one representative room.
2. One-piece or two-piece construction
A one-piece pan and cistern casting has no exposed seam between the two bodies. On the 1003A that seamless body removes the crevices where grime and bacteria collect behind a two-piece coupling, which matters in high-turnover hotel rooms and shared commercial washrooms where housekeeping works on a fixed schedule. Two-piece pans are still worth specifying where access to internal cistern parts is a priority; both formats exist in our range, including the two piece washdown toilet 1038A with dual S-trap and P-trap options.
3. Flushing type and building water supply
Washdown flushing moves a single wash of water from the cistern through the trapway rather than spreading a rim-jet ring around the bowl, and it is a common choice where noise and mechanical simplicity matter. When you review any washdown pan, ask the supplier what the flushing arrangement is designed for in your building type: gravity feed, pumped mains, or a cistern fed from a storage tank. A pan that performs well on mains pressure can underperform on a low-head gravity supply, so state your supply condition in the enquiry and get the model confirmed against it.
4. Ceramic body and glaze
The 1003A is made from vitreous ceramic with a glossy glaze, chosen because the surface resists yellowing and staining and wipes clean without aggressive products. For project buyers, three questions are worth asking on any sanitaryware line:
- Is the glaze applied inside the trapway as well as on visible surfaces? An unglazed passage is where blockages begin.
- What is the firing standard for the body, and how is it checked before packing?
- How are pans inspected and packed for ocean freight, since damage in transit is a commercial risk as much as a technical one.
5. Certification and documentation you should actually hold
The 1003A carries CE certification. Treat that as what it is: conformity for the European market. It is useful evidence of a documented production standard, but it does not by itself prove acceptance under Australian plumbing regulations, which are set state by state and administered through the National Construction Code and WaterMark-type requirements. Before you place an order for an Australian project, ask the supplier in writing which certificates they can provide for your specific model and destination, and have your plumber or hydraulic consultant confirm acceptance locally. Do not assume that a CE mark transfers to another market.
6. Specification sheet, item by item
A complete buying checklist for a project order should record each of these lines before the purchase order is raised. Use the 1003A as the worked example.
| Checklist item | What to confirm | 1003A reference |
|---|---|---|
| Model and finish | Exact model code, colour, glaze finish on every order line | 1003A, white glossy glaze |
| Drain type | P-trap wall drain or S-trap floor drain per bathroom | Both options available |
| Rough-in dimension | Measured from finished wall face to outlet centre | 180 mm for P-trap, 250 mm for S-trap |
| Construction | One-piece or two-piece body, and housekeeping implications | One-piece seamless casting |
| Flushing system | Washdown arrangement matched to building supply pressure | Washdown flush, cistern fed |
| Seat and cover | Included or separate line item, soft-close or standard, material | Confirm with your quotation |
| Mounting and load | Floor-mounted pan; confirm substrate and fixing method on site | Floor-standing close-coupled |
| Documentation | Certificates, packing list, spare-parts availability for the model | CE certification stated on the product page |
| Spare parts plan | Cistern internals and seat stocked for the same model code | Ask supplier at quotation stage |
| Packaging and freight | Ceramic-safe packing, container loading plan, breakage terms | Agree before shipment |
7. Seat, cistern fittings and spare parts
The pan is only part of the order. Seats, covers, flush buttons or levers, inlet valves and fill mechanisms are separate line items with their own lead times, and in a hotel they will be replaced several times over the life of the property. Specify one model code across the whole project so that replacement parts fit years later, and order a spare-parts consignment with the first shipment rather than chasing components after handover.
8. Quantities, spares and site storage
Order to the room-by-room schedule, then add a small buffer of identical pans for future replacements and for breakage that appears only after unpacking. Ceramic should be stored upright, dry and unopened until installation, with handling agreed in advance with the installer. If your delivery is staged across several site phases, confirm that the model code and glaze batch will stay consistent between shipments.
9. Who coordinates the rest of the bathroom
Buying sanitaryware as isolated line items means several suppliers, several delivery dates and several sets of dimensions to reconcile. As a one-stop furniture and building materials supplier, we coordinate ceramic suites together with vanities, basins, shower systems, lighting, cabinetry and wall and floor finishes for villa and hospitality projects, which keeps the wet-room dimensions in one set of drawings. Our custom and OEM service covers bespoke sizing and finish where a standard model does not fit the design, and our logistics and door-to-door delivery service handles freight forwarding, export paperwork and container loading for ceramic consignments.
Common checklist mistakes
- Measuring the rough-in before tiling, then ordering the wrong trap option.
- Mixing floor-standing pans and wall-hung suites in one layout without checking carrier frame height and support details for each type.
- Treating a CE mark as automatic approval for local plumbing code.
- Skipping spare-parts provisioning, so a failed fill valve stops a room from being let.
- Mixing model codes across phases, which ends matching replacement seats and internals.
Questions to send with your enquiry
Which trap option suits my drawings? Send the waste outlet position from the finished wall face for each bathroom and we will confirm P-trap or S-trap per room.
Can you supply documentation for my market? Ask for the certificates available for the exact model and destination, then have a local hydraulic consultant confirm acceptance before order confirmation.
What is included in the price? Confirm seat and cover, cistern internals, spare-parts provision, packing standard and delivery terms line by line in the quotation.
Can the model be customised? Where a project needs non-standard dimensions or finishes, request our custom and OEM service before the design is frozen.
Before you place the order
A complete buying checklist for a washdown one piece toilet comes down to four confirmations: the trap type and rough-in for every bathroom, a flushing arrangement matched to your building's water supply, a documented ceramic and glaze standard, and written certification plus spare-parts support naming the exact model. Work through those boxes on paper, share the room schedule with your supplier, and let your plumber sign off the dimensions before production starts. That sequence is what keeps sanitaryware procurement out of the variation log.