A laser cut metal screen rarely fails on the drawing. It fails in the handover meeting, when a panel arrives too wide for the opening, when the finish reads differently under the lobby downlights than it did in the sample box, or when nobody has agreed who is fixing it to what.
If you are specifying a Custom Laser Cut Metal Screen - Decorative Partition for Hotel Reception, the installation plan is where the budget is protected. Below is the checklist we work from on hospitality and villa projects, written so that a project manager, a joinery contractor and a procurement officer can all read the same page.
1. The purpose statement, agreed before anyone draws anything
"Partition" covers several different jobs, and each one changes the build-up of the panel. Write down which of these applies to your reception:
- Sight screen only. It hides the check-in back-of-house, a stairwell or a service door. No structural role, no impact rating.
- Space divider with traffic behind it. Guests brush past it with luggage trolleys; edge protection and fixing strength matter more.
- Acoustic or privacy aid. A perforated metal screen is not a sound barrier on its own. If the brief says "reduce noise", state the required outcome and let the acoustic consultant tell you what infill, backing or glazed layer is needed.
- Backlit feature. The pattern becomes a light drawing at night. This adds a lighting circuit, a driver location and a maintenance access route.
Put this statement in the plan in plain words. "Decorative screen between reception desk and lounge, non-structural, backlit from ceiling void, cleaning access required both faces" removes half of the arguments that usually appear on site.
2. Site dimensions taken the way a fabricator needs them
Screens are made to exact dimensions, so the survey is worth doing once properly rather than twice approximately. Record:
- Floor-to-soffit height at several points across the run — floor levels in a refurbished lobby are rarely flat.
- The finished floor level and finished ceiling line, not the structural slab and deck.
- Where skirting, cornices, thresholds or door frames intrude into the opening.
- What is behind the wall or soffit the screen fixes to: blockwork, plasterboard stud, steel frame or existing joinery. A laser cut panel is heavy relative to its area, and a plasterboard lining needs blocking or a frame.
- Obstructions: sprinkler heads, downlights, data points, signage, handrails.
3. Panel breakdown, not one giant sheet
A reception screen often spans more than a lift car can deliver. Split the elevation into panels early and confirm each panel against three limits: the maximum sheet the fabricator cuts, the openings it has to pass through on the way in, and the weight one installer can hold while the fixing is set.
- Mark movement gaps where the run exceeds a single floor bay.
- Keep the pattern continuous across joints by setting panel breaks on a repeat line of the motif — otherwise the design visibly jumps.
- Note which joints are visible from reception. A shadow gap reads as a design line; an overlap reads as a mistake.
4. Material, finish and pattern decisions on one sheet
Our screens are cut from stainless steel, with the surface treatment chosen per project; brushed gold, matte black and antique bronze are common on hospitality work. The same decision sheet applies to a Custom Gold Stainless Steel Laser Cut Decorative Screen Partition or a Custom Bronze Stainless Steel Laser Cut Decorative Screen Partition, where material, finish, panel count and size are all made to order:
| Decision | What to record in the plan |
|---|---|
| Finish sample | Approve a physical sample under the actual lobby lighting before release. Gold and bronze shift noticeably between warm downlights and daylight from a curtain wall. |
| Pattern file | Clean vector artwork with the cut line distinguished from engraving or etching. A JPEG trace is not a production file. |
| Open area ratio | How much of the panel is hole. It drives stiffness, weight, privacy and how much light passes through. |
| Edge treatment | Framed edges, returned edges or raw cut edges at the perimeter. Framing hides site tolerance; raw edges need a cleaner substrate line. |
| Cleaning regime | Hollow patterns collect dust on both faces. Say who cleans them, how often, and whether the panel is removable. |
5. Fixing method drawn, not described
This is the section most often left to the installer, which is how screens end up out of plumb. The plan should show:
- The substrate or support frame the panels hang on, including its material and centre-to-centre upright spacing.
- Fixing type and centres, and whether fixings are concealed behind the pattern or visible as standoff bosses.
- Top and bottom restraint — a free-standing screen needs a base detail that will not trip guests or trap water in a wet-lobby entrance.
- Clearance for any integrated lighting, cable route and access panel to drivers.
- Whether panels are demountable. Reception screens get damaged by luggage; a removable panel is cheaper than a re-cut wall.
6. Sequencing, protection and the people involved
Name one responsible party per line in the plan: who surveys, who supplies the substrate frame, who cuts, who fixes, who inspects. Then sequence it realistically.
- Order after the finished floor and ceiling levels are fixed, not at concept stage.
- Install late — after painting, wet trades, lighting commissioning and heavy furniture delivery. Reception screens get knocked during exactly those activities.
- Protect the faces on delivery and keep the protection on until handover; state who removes it.
- Hold a pre-installation check on site: levels confirmed, substrate accepted, samples signed off, access route clear.
7. Handover documents worth asking for
- Shop drawings with the approved panel breakdown and fixing detail, initialled against the survey.
- The signed finish sample and the released pattern file.
- Packing list keyed to each panel position on the elevation drawing.
- Cleaning and maintenance note for both faces, plus a spare-panel allowance for high-traffic lobbies.
How this fits into a wider fit-out
A reception screen is one line in a hospitality package that also carries joinery, wall and ceiling finishes, lighting and loose furniture. Coordinating it with the rest of the order — rather than letting each trade buy separately — is where a one-stop furniture and building materials supplier helps: one set of drawings, one production schedule and one delivery window. Our services cover custom and OEM manufacturing, logistics and door-to-door delivery and installation and after-sales support, so the screen can be ordered alongside the rest of the fit-out instead of arriving alone and waiting.
Send us your drawing, photograph or reference image. We fabricate to exact dimensions — pattern, size, panel count, material and finish all customised for your reception. Share the elevation, the substrate condition and your target handover date, and we will come back with a panel breakdown you can price.