An open modular wardrobe package can look excellent on a rendering and still fail in the field. Doors that bind, shelves that bow under load and units that never line up with an out-of-plumb wall are all procurement problems long before they are site problems. The checklist below shows what a buyer, contractor or consultant should confirm in a proposal before any deposit is placed.

What "Open" and "Modular" Actually Mean Here

In the Open Modular Wardrobes range, "open" describes the storage presentation: hanging rails, drawers and shelves left exposed rather than hidden behind hinged or sliding doors. It does not mean an unassembled flat-pack system, and it does not mean a fixed catalogue size. Each run is made to measure, with the layout, material and finish specified for the room it sits in.

"Modular" describes how the run is built up from repeatable carcass units - hanging sections, drawer stacks and shelf bays - so that a long wall can be assembled from consistent parts instead of being drawn as one bespoke box. In a commercial fit-out that matters for two reasons: replacement or extension later matches the original module, and production can be batched across guest rooms or floors rather than re-detailed each time.

The same logic runs through the wider wardrobe range. A Combination Modular Wardrobes proposal mixes open bays with closed cabinets, which is often what a serviced-apartment or staff-accommodation brief actually needs: display and daily-use storage in the open sections, personal or linen storage behind doors. Glass Modular Wardrobes take the opposite approach and put glazed fronts on the modular carcass, which suits boutique retail, dressing rooms and showroom settings where presentation is part of the brief.

Check 1: Does the Proposal State the Module Grid?

A serious proposal shows the module width, the vertical division of each bay, and how the run resolves at the ends. Ask for:

  • The carcass width per module and the total number of modules per room type.
  • Which bays are hanging, which are drawer stacks, which are shelves - drawn, not described in words.
  • How end panels, scribes and skirting reliefs are handled against an out-of-plumb wall.
  • Whether the top bay reaches the ceiling or stops below it, and what fills the gap.

If a quotation lists only "wardrobe, 2400 mm wide" with no module breakdown, you are buying an assumption. Two suppliers quoting the same wall can produce very different interiors at similar prices, and without the grid there is no way to compare them.

Check 2: Materials and Structure for the Actual Use

Open storage exposes everything, including the substrate. Ask what the carcass and shelf material is, what edge treatment is used on visible edges, and how deep and long each unsupported span is. Shelf span matters more than it sounds: an open bay loaded with folded linen or stock will tell you within a year whether the board and thickness were chosen for the load.

For hospitality and multi-unit work, also confirm:

  • Drawer runner type and rated load, and whether soft-close is standard or an option.
  • Rail material and length per bay - rails sag over long unsupported runs.
  • Edge banding on all four edges of visible components, not just the front edge.
  • Back panel thickness and fixing method, which affects how square a completed run stays.

Check 3: Finish Specification, Not Finish Names

"Matte oak" means nothing on its own. A comparable proposal names the surface system and the reference - laminate, melamine, lacquer, veneer or acrylic - with a manufacturer code or an approved sample number, plus the direction of grain where it is visible. Where the wardrobe sits beside glazing, ask what the supplier has observed about that specific finish under light exposure, rather than accepting a general assurance.

For projects replicating a look across many rooms, request one signed-off physical sample per finish, kept on site as the reference for deliveries. Photographs and 3D renders are not an approval record.

Check 4: How the Package Is Delivered

Wardrobes rarely arrive alone. In a full fit-out they sit in the same wall as doors, panelling, vanities and lighting, and the interfaces between them are where cost overruns appear. A supplier handling several of those trades reduces the number of handovers you have to manage. The Turnkey Solutions scope covers villa, hospitality and office projects from design through production to site coordination, with separate pages for Custom & OEM Service, Logistics & Door-to-Door Delivery and Installation & After-sales Support.

Treat each of those as a scope to be defined in writing, not a promise. Confirm what site coordination covers, who measures the openings, what is included in packing for container loading, and which costs sit with the buyer under your chosen Incoterms.

Reading the Price Line

Line itemWhat to verify before comparing totals
Unit rate per module or per linear metreWhether the rate includes end panels, scribes, interior fittings and lighting, or whether those are extras.
Interior accessoriesWhich rails, drawers, trays and dividers are included per room type, and what each addition costs.
Packaging and freightContainer loading plan, protection for glazed and finished components, and whether replacement parts ship separately.
Site worksWhether installation, levelling against finished floors and snag rectification are in scope, and by whom.
VariationsThe rate card for changes after approval, agreed before production starts rather than during it.

Questions Worth Putting to the Supplier in Writing

  • Which room types use which module configuration, and can the layout differ per floor or unit?
  • What is fixed at approval, and what can still change after production starts?
  • How are short-lead replacement modules handled if a unit is damaged in transit or on site?
  • Who signs off the sample, and where is the approved reference kept?
  • What tolerance is allowed for floor level and wall alignment at handover?

A practical sequence: confirm the module grid first, then materials and spans, then finishes with a physical sample, then delivery and installation scope. Pricing comparison only becomes meaningful after those four are fixed - which is why two proposals for the same wall should never be compared on price alone.

Frequently Asked Questions

Is an open wardrobe practical in a hotel or serviced apartment?

It works where the storage is curated and daily-use items stay within reach, usually paired with closed cabinets for personal belongings. Combination layouts are the usual answer on hospitality projects.

How do I compare two proposals for the same wall?

Only after the module grid, board material and spans, finish references and installation scope are all stated in writing. On price alone, two quotations for identical dimensions can cover very different interiors.

For a wardrobe package that has to survive repeated use across many rooms, the specification detail in the proposal is the best predictor of the finished result. Send your drawings and room schedule to SANTERSON and request a module-by-module breakdown with finish references before you compare bids.