Before a single carton of sanitary ware is booked for a villa, hotel or apartment project, the bathroom schedule has to survive one question from the site team: will this fixture actually connect to the pipework we already have? For the washdown one piece toilet 1004A, that answer depends on a short list of measurements and project inputs. This guide sets out exactly what to send us so the specification closes without rework.
Why One-Piece Construction Changes What You Measure
A one-piece toilet is cast as a single body, so the relationship between the water connection, the outlet and the finished back of the pan is fixed at the factory. There is no tank-to-bowl gap to adjust on site, which is precisely why buyers choose this type: the integrated structure removes the joint where dirt and bacteria collect, and the dense glaze on vitreous ceramic resists limescale, staining and yellowing over years of use.
The practical consequence for procurement is that the rough-in dimension cannot be corrected after the pan arrives. The 1004A is offered with two outlet arrangements to fit different pipeline layouts, so the correct choice has to be made on paper, in the specification, before production is released.
The Two Rough-In Measurements That Decide the Order
Model 1004A supports a wall drain and a floor drain. Send us the dimension that matches your pipe, not both, and confirm which one applies to every bathroom in the schedule.
| Drain type | Rough-in on record | What it means on site |
|---|---|---|
| P-trap (wall drain) | 180 mm | The waste outlet enters the wall. Measure from the finished floor surface to the centre of the waste pipe, and confirm the finished wall build-up is included. |
| S-trap (floor drain) | 250 mm | The waste outlet drops through the floor. Measure from the finished back wall face to the centre of the floor pipe, after tiling or plastering is accounted for. |
The 180 mm and 250 mm figures above are the rough-in values recorded on the product page. They should be checked against the current technical data sheet for your order before production, because site conditions and revised documentation can differ from published copy.
Measure against the finished surface, not the structural one
The most common avoidable error we see in project enquiries is a rough-in taken off the bare blockwork or the unfinished screed. Wall finishes, waterproofing, adhesive and tile can easily shift a wall drain by enough to matter. Ask the site team for dimensions taken from the final finished face, and ask them to state that explicitly on the drawing you send.
The Project Inputs We Need in the Enquiry
Once the drain type is fixed, the rest of the specification is about volume, coordination and delivery. A complete enquiry lets us quote and plan production without a second round of questions.
- Fixture count per bathroom type. Give the quantity for each room type in the schedule rather than one total, so mixed layouts can be produced in separate batches.
- Drain type and rough-in per location. A single project often mixes wall-drained and floor-drained bathrooms. List them by room or floor.
- Project type and end user. Private residence, serviced apartment, hotel guest room or public restroom each carry different expectations for cleaning frequency, spare stock and visual finish.
- Series coordination. If basins, bidets or other WCs must match, name the series so shapes and glaze are consistent across the suite.
- Delivery location and Incoterms. Port of discharge or door address, whichever term you are buying on.
- Spare-parts requirement. Hotels and managed apartments usually want a buffer quantity for future replacement; tell us at the time of ordering, not after handover.
Coordinating the Rest of the Bathroom Suite
A WC specified in isolation tends to look wrong once the vanity and basins are installed. Where a project calls for a consistent look across several properties or room types, decide the sanitary series first and then work outward to the basin, bidet and accessories.
Our bathroom ceramic range covers sanitary fixtures for residential and hospitality bathrooms, including floor-standing and wall-hung pans, stand basins, wall-mounted sinks and matching bidets. For a two-piece alternative on the same drain logic, the two piece washdown toilet 1038A also offers P-trap and S-trap options, which is useful when a renovation keeps existing pipework but changes the fixture. For compact guest bathrooms where the floor line should stay clear, the wall hung toilet 1051W leaves the floor open for mopping and pairs with a concealed cistern.
Matching other fit-out items in the same package
Bathroom ceramics rarely arrive alone on a project. Vanities, mirror cabinets, shower sets, wall panels, flooring and lighting usually travel together, and coordinating them with one interior fixtures package reduces the number of separate deliveries to reconcile on site. Santerson works as a furniture and building materials manufacturer on turnkey villa, hospitality and office projects, covering design consultation, custom and OEM production, packing, freight and after-sales support.
How Custom and OEM Support Fits a Sanitary Order
Project buyers frequently need more than the catalogue item. Through our custom and OEM service, enquiries can cover bespoke finishes and material choices, private labelling and packaging for distributors, and flexible minimum order quantities across a mixed product list. For sanitary ware specifically, the most valuable custom work happens before tooling decisions: confirming which drain variant each room takes, agreeing spare-stock quantities, and aligning packaging with the site's storage and handling conditions.
Our logistics and door-to-door delivery service handles freight booking by sea, air and rail, along with the export paperwork, packing and container loading plans. Tell us your discharge port or delivery address and the fixture count per room type, and we can advise on how to consolidate sanitary ware with heavier building materials in one shipment.
A Short Pre-Order Checklist
- Drain type confirmed for every bathroom: wall drain or floor drain.
- Rough-in measured from the finished surface, with the finish build-up stated.
- Quantities split by room type, plus a spare allowance for managed properties.
- Sanitary series named where basins, bidets and WCs must match visually.
- Technical data sheet re-checked against site conditions before production release.
- Delivery term, discharge port or door address, and packing requirements agreed.
If you send the drain type, the measured rough-in from the finished surface, and the quantity per room type, we can specify the 1004A for your project and quote it against the rest of the bathroom package.
Send us your bathroom schedule
Share the drain type, rough-in dimensions and fixture quantities for each room type, and our team will confirm the correct 1004A configuration alongside the rest of your sanitary and interior fixtures order.