Open wardrobes solve a real problem in tight bedrooms and dressing rooms: no door swing, no pocket to build, no track to service. But when the carcass is carried on a metal frame instead of a full panel back, the drawing you approve is only half the decision. The frame profile, how it meets the floor and ceiling, what sits behind the hanging zone and how the pieces arrive on site decide whether the finished run reads as built-in joinery or as furniture that has wandered into the wrong room. This guide walks through what to check before you sign an order for metal frame open wardrobes, and what a supplier needs from you to price the job honestly.
Start With the Room, Not the Wardrobe
A metal frame open wardrobe is usually specified for one of three reasons: the bedroom is narrow enough that a hinged door would fight the bed; the client wants clothes and folded storage visible as part of the decoration; or the wall is already finished, so a full carcass would waste depth. Write down which reason applies before you look at any catalogue page. It changes what you should insist on.
Then take dimensions from the built condition, not the architectural drawing: finished floor level, finished wall face, the true vertical of each wall, the position of skirting, switches, sockets, radiator tails and ceiling lines, and any beam or bulkhead that will interrupt a run. For a wardrobe that reaches the ceiling, note the floor-to-ceiling dimension at both ends of the wall as well as in the middle; on site, that figure often varies by enough to matter.
Read the Frame Before You Compare Prices
With an open wardrobe there is nothing between you and the structure, so the frame carries the whole visual load. Ask the supplier to show, in writing or in a detail drawing, exactly what these elements are:
- The profile itself — its section size, its finish (paint, anodised or laminated surface), and which corner and joint method is used. A mitred corner with a visible connector reads differently from a welded and finished one.
- How the frame is fixed — to the floor, to the wall, or freestanding on feet. Fixing method affects what your site team must prepare, and whether an uneven screed has to be levelled first.
- What supports the shelves and hanging rail — brackets into the frame, a rear panel, or side panels. This is where a light-looking design either stays flat over years of use or does not.
- The back condition — whether a backing panel is supplied or the finished wall is left exposed. Wall finishes mark and dust drifts, so decide this deliberately rather than by omission.
If your project needs the storage to hold glassware, linen or display pieces, an open frame works better with shelving and closed units nearby. Our glass front display cabinets are usually specified in the same room to carry what you do not want on show.
Check What Can Actually Be Customised
Decide the internal zoning from how the room is used, not from what looks tidy on a rendering: long hanging for coats and dresses, double hanging for shirts and folded tops, drawer zones for underwear and socks, shelves for knitwear, and a clear zone for bags or suitcases. Where a bedroom needs doors to keep the wardrobe surface seamless, compare against our custom minimalist bedroom wardrobes, which are built around flat panels and handleless fronts instead of an exposed frame.
Two other open variants belong in the same comparison, because they solve the same problem differently: freestanding open wardrobes for rooms where you do not want fixings into finished walls, and closet sliding panels when the client likes an open layout but needs the option to close it off against dust.
Most open wardrobe ranges, ours included, are made to measure rather than sold in fixed widths. That only pays off if you know which variables are genuinely open: for our Metal Frame Open Wardrobes, the product listing covers made-to-measure sizing, material and finish options, and a layout tailored to the project. Confirm the dimensions and selected specification for each order in writing before production starts.
Work Through the Site Conditions
Open frames are unforgiving of sloppy preparation because every junction stays visible. Before production is released, confirm on site:
| Condition to confirm | Why it matters for an open frame |
|---|---|
| Floor level and finished level at the run | A freestanding or floor-fixed frame will show every slope; packing is visible unless it is designed out. |
| Wall plumb and wall finish type | Fixings into plasterboard, masonry or tile need different details, and the exposed wall becomes part of the design. |
| Ceiling line and any bulkhead | Full-height frames are cut to the ceiling; an out-of-level ceiling means a scribed top rail, which must be drawn, not improvised. |
| Skirting, architraves and services | The frame may need to scribe around them or the skirting removed; decide before ordering. |
| Room access and lift size | Long frames and full-height panels must fit through doors, stairwells and service lifts, or they get split into joins that show. |
Compare Suppliers on Process, Not Adjectives
Wardrobe suppliers all describe themselves as custom. What you can compare is the workflow behind that word. Ask each one:
- Who produces the shop drawing, and does it show frame profiles, fixing points and joint details?
- What sample of the frame profile and finish can be sent before the order, so you can see the corner detail rather than a colour swatch?
- How are tolerances handled between wardrobe and adjacent flooring, wall finish and lighting?
- Is packaging designed for the pieces to survive ocean or road freight, and how are panels protected at the edges?
- What happens on site if a piece is damaged in transit or one dimension on site differs from the drawing?
As a China-based manufacturer of furniture and building materials, SANTERSON works project by project: design and prototyping, bespoke finishes, production, freight and door-to-door delivery, then installation and after-sales support. Wardrobes are usually ordered as part of the same bedroom package as engineered wood flooring, wall panel systems and flush interior doors, so one team coordinates the dimensions across all of it instead of three suppliers blaming each other on site.
Price the Whole Scope
An open wardrobe quotation can look cheap and still cost more than a closed one once everything around it is added. Check that your comparison includes the same line items:
- Frame, shelves, hanging rails and any drawer units or boxes
- Backing panels or a stated decision to leave the wall exposed
- Integrated lighting in the hanging zone, if specified — cabling and driver location need a decision at drawing stage
- Fixings, scribing pieces and trim to floor, ceiling and side walls
- Packaging, freight, insurance and delivery address terms, plus on-site handling
- Installation labour, or the assembly instructions your own fitters will work from
Compare two quotations only when they carry the same items. A lower frame price that omits scribing pieces and freight is not a saving.
Before You Order: The Short List
- Room reason for choosing an open wardrobe written down, and it still holds up.
- On-site dimensions taken from finished surfaces, including floor-to-ceiling at both ends.
- Frame section, finish and joint method confirmed on a drawing or physical sample.
- Fixing method agreed with the site team, along with any levelling work they must do first.
- Internal zoning set from actual storage habits, not from the rendering.
- Decision recorded on backing panel versus exposed wall finish.
- Quotation scope checked item by item against the list above.
- Replacement and damage process confirmed in writing before production release.
Specifications, materials and hardware are confirmed per project. Dimensions and selected finishes should be verified with our team before production begins.