A two tone sliding door wardrobe looks simple on a drawing. Two panel colours, a track, a set of doors. That apparent simplicity is exactly where quotation problems start: the colour split, the door layout and the internal fit-out are all decisions the factory needs in writing before it can price anything. Below is the information set we ask project owners, builders and designers to send when they brief us on two tone sliding door wardrobes, and what each item changes on your side of the deal.
Start With the Room, Not the Wardrobe
Our built-in furniture is made to the space it sits in, so we need the opening before anything else. For each wardrobe send:
- The clear width, height and depth of the recess or wall run, measured in millimetres, plus the finished floor level.
- Whether the ceiling is flat or sloped, and whether there are skirting boards, cornices, architraves or power points inside the opening.
- Position of doors, windows and any air grilles or service runs that reduce the usable wall length.
- A photo of each wall from two angles, plus a sketch with dimensions written on it. A phone photo with a tape measure in shot tells us more than a clean 3D render.
Sliding doors need clear travel space. Where the run is tight, we sometimes propose a corner configuration instead, and our sliding door corner wardrobes follow the same made-to-measure process. Send the measurements first and we will tell you which layout the wall actually supports.
Name the Two Colours Precisely
"Two tone" describes a method, not a specification. To avoid a colour you did not approve, send:
- The reference for each colour: a brand and code, a RAL number, or a physical sample you have already approved on another product.
- Which surface gets which tone. Panel field, frame, handle profile and internal carcass are four separate surfaces, and projects differ on all four.
- The sheen level for each surface: matte, satin or high gloss. A two tone scheme with mixed sheens reads very differently under bedroom lighting than the same colours in one sheen.
- Where the split falls. Vertical split at a door stile, horizontal band, or one colour per door leaf are all common, and each has different implications for how the doors overlap on the track.
If you want to see what we already produce in this family, our sliding wardrobe range includes matte, high gloss, mirror and glass door versions alongside the two tone option. Comparing those pages side by side is a quick way to decide whether your second tone should be a solid colour, a wood grain or a reflective surface.
Specify the Door System and the Hardware
Tell us your preference here rather than leaving it for the factory to decide:
| Item | What to state in your brief |
|---|---|
| Track | Top-hung or bottom-rolling, and whether a floor track is acceptable. Floor tracks collect debris; top-hung systems need a structurally sound head rail. |
| Panel material and thickness | Board type and thickness per door leaf, and whether any leaf carries glass, mirror or an aluminium frame insert. |
| Handles and profiles | Recessed pull, edge profile, or handleless. State the metal colour if a profile is exposed. |
| Soft close and dampers | Include or omit, and on how many leaves. |
| Door overlap and stop position | Which side the doors stack on, and how much return wall exists for the stack. |
These choices drive cost more than the colour does, so they belong in the enquiry rather than in a later revision.
Draw the Interior Layout Room by Room
Send an internal elevation for every wardrobe, not one generic layout copied across all bedrooms. Mark hanging zones with their heights, short-hang versus long-hang, drawer banks and their heights from the floor, shelf runs, shoe storage, and any lighting you want inside the carcass. If a room is for a guest, a child or an owner, say so; that changes the balance of hang to shelf.
Where a bedroom needs storage planned around the occupant rather than around a standard module, our custom minimalist bedroom wardrobe work follows the same rule: internal layout is set by daily habits, and handleless flat panels keep the front clean once the doors are closed.
State the Delivery Route and Who Installs
Built-in wardrobes ship as panels, not as assembled boxes. Tell us the destination city, the delivery address type (apartment block, house under construction, or site with a lift), and whether your own installer or ours will fit the units. Our services cover logistics and door-to-door delivery as well as installation and after-sales support, so we can quote both routes and you can compare them rather than assume one.
Also send the on-site date you need the units. Panel-made wardrobes are produced to measurement, so a change of site programme has to reach us before cutting starts.
How the Brief Turns Into a Confirmed Order
Once we have the above, the sequence follows our usual project steps: we review your drawings and return shop drawings for your sign-off; you confirm dimensions, finishes and hardware on those drawings; then production starts. Our custom and OEM service covers this design-to-production step, including material and finish selection against the references you supplied.
Confirm before you sign: final dimensions taken on site after the floor and ceiling finishes are complete; the approved colour and sheen for every surface; the hardware brand or specification; and who signs off the shop drawings. These four confirmations cover the points most often reopened later in a wardrobe project.
A Quick Pre-Enquiry Checklist
- Measured openings in millimetres, with finished floor level noted
- Photos of each wall plus a dimensioned sketch
- Two colour references with sheen levels and the split position marked
- Track type, panel material, handle style and soft-close preference
- One internal elevation per wardrobe
- Destination address, delivery access notes, and installation responsibility
- Required on-site date
Send those seven items and a two tone sliding door wardrobe stops being a negotiation. You get a quotation built on the same assumptions you are working to, and the drawings that come back match the room you measured.