A single bedroom wardrobe rarely causes trouble on a project. A whole floor of them does. Once wood grain melamine wardrobes move from one sample room to eight apartments, a hotel or villa scheme, the work stops being a finish decision and becomes a quantity and coordination exercise: how many units per type, which opening direction each one has, where the timber-look panels meet flooring, skirting, lighting and door openings, and who signs off all of it before production starts. This guide sets out how to build that quantity plan and how to keep the surrounding product groups aligned with it.

Start From Room Types, Not From a Wardrobe Count

Counting wardrobes across a whole building is the fastest way to get a wrong number. Group the rooms first. A bedroom with a recess that takes a built-in run of panels, a master suite with a dressing alcove, and a compact guest room needing a two-door unit are three different products even when they share one wood grain finish. For each group record:

  • Run length and clear height — the measured width of the recess or wall, floor level to ceiling level, taken at several points because slabs and ceilings are rarely flat.
  • Opening type — hinged doors, sliding doors, open shelving, or a mix. Sliding units need track clearance and an overlap allowance; hinged units need swing space in front of them and must not clash with bed placement or door leaves.
  • Internal layout — hanging height, drawer banks, shelves, and any vanity or mirror element. Layout drives cost far more than external size does.
  • Fixing condition — what the wall behind is made of, whether the unit is scribed to an uneven surface, and whether a bulkhead or pelmet is needed to close a gap.

Once rooms are grouped, quantities follow from the group. Type A appears in six guest bedrooms, Type B in four master suites, Type C in two staff rooms. That structure is what lets you revise one room type without re-counting the entire building, and it is what a manufacturer needs to quote consistently.

How Wood Grain Melamine Panels Are Ordered and Why Repeats Matter

Melamine-faced panel is supplied in board sizes and cut to the dimensions on your drawings. Two consequences follow, and both affect quantity planning rather than just price.

Panel repeats and grain direction

Wood grain melamine carries a printed grain. Panels taken from different board runs can differ slightly in tone, and the grain runs in one direction across a sheet. When several identical units are made for identical rooms, that is straightforward — repeat the same cut list. Where units sit side by side in one visible run, or where a door leaf sits next to a fixed panel of the same colour, specify grain orientation on the drawing and order those panels from one production batch. Splitting one visible wall across two batches is the most common cause of tonal mismatch on site.

Spares and the cost of late additions

On multi-unit projects, add a small number of spare panels and door leaves to the first order — matching fronts for the room types that repeat. A replacement panel ordered after handover comes from a new batch, at new freight rates, with new tooling time for hardware. Ordering repeats and spares together in one production run avoids all three problems. Confirm the quantity you intend to hold before the order is released.

The Quantity Sheet: What Each Line Must Carry

A wardrobe schedule that only lists size and quantity will bounce back for clarification. Every line needs enough attributes for production to proceed without a phone call:

FieldWhat to record
Room referenceFloor, room number and the room type it belongs to, so drawings and quantities can be cross-checked.
Unit type and quantityType code plus count. Never merge different layouts into one line because the finish is the same.
Overall sizeWidth, height, depth — with a note on whether the dimension is the finished face or the carcass.
Door and opening scheduleNumber of leaves, hinged or sliding, hinge side, and which way each unit faces.
Finish codeThe exact wood grain decoration and its surface texture, not a colour name in prose. Gloss and matte fronts behave differently under light.
Edge treatmentMatching edge on all visible cuts; note where an abs or aluminium trim is required instead.
Internal fittingsRails, shelves, drawer banks, soft-close hardware, lighting provision, and any mirror or glass insert.
Interface notesCeiling and floor finish levels, skirting treatment, architrave, and where the unit meets a window reveal or radiator.
Packaging and delivery sequenceLabelling by room reference, plus the install order per floor so units do not stack in a corridor.

Where a project mixes wardrobe types — modular runs, corner units, walk-in layouts — schedule each family separately and keep one consolidated summary above them. Our made-to-measure approach means dimensions, layout and finish are set per project rather than picked from fixed sizes, which is exactly why the schedule has to be complete before production opens.

Coordinating the Wardrobe With Everything Around It

Timber-look joinery reads well precisely because it repeats elsewhere in the building. That repetition is also where coordination failures appear, because each product group usually reaches a different supplier or a different stage of the programme.

Match the grain to the cabinetry, not the other way round

If the same wood tone appears on kitchen fronts, specify wood grain melamine cabinets from the same decoration and batch as the wardrobe fronts. Kitchens and wardrobes are frequently ordered months apart, so lock the finish reference at design stage and repeat it on both drawings. Where a run of panels continues into a full-height concealed unit — a common treatment in bedrooms — draw it as one wall rather than two products.

Flooring, skirting and thresholds

Decide whether the wardrobe sits on the finished floor or is scribed over underlay, and fix the ceiling level before heights are set. Engineered oak flooring changes floor levels by a measurable amount; a unit measured to a bare slab will not fit after the floor is laid. Record the finish level on the schedule and let it travel with the order.

Doors, walls and openings

Wardrobe doors need swing or slide space that interior doors, bed leaves and bathroom entries also want. Check each unit against the room layout at the same time as door positions, and check that a hinged leaf does not strike a light switch or a radiator. On villa work with arched niches or curved wall elements, confirm those shapes are drawn to the same panel system as the joinery — our custom wall cabinet projects combine open display niches, full-height hidden wardrobes and integrated vanities in one build-up, which only works when arch radius and panel thickness are agreed up front.

Lighting and electrical

Internal wardrobe lighting needs a cable route decided before the carcass is cut, plus a switch or sensor position that does not clash with shelf holes. Wall-mounted reading lights and pendant positions must clear the door swing. Add these to the joinery drawing rather than leaving them to the electrical set.

Sequence the Approvals So Production Has One Clear Start

The most expensive delay on a joinery package is not manufacture — it is the round of clarifications before it. Set an approval order and hold to it:

  • Room grouping and quantities signed off first. Nothing else can be priced reliably until this is fixed.
  • Finish board approved physically. A wood grain decoration on a screen shifts under different light; approve the actual panel with its edge banding, and keep that board as the reference for inspection.
  • Shop drawings returned per room type. Each drawing carries the unit type code from the schedule, so comments attach to the right line.
  • One consolidated comment round. Collect structural, finish and electrical notes together instead of issuing them one at a time.
  • Production release with the spares included. Confirm quantities one final time at release; changes after this point are re-manufacture, not variation.

A first-article unit — one complete wardrobe built and inspected before the full run — is worth the extra days on any project with more than a handful of units. It settles grain direction, edge colour, door alignment and hardware feel once, for everyone to see.

Where quantities go wrong: heights measured before the floor finish level is fixed; two layouts merged into one line because the colour matches; sliding and hinged units counted together; spares left out of the first order; and a wood tone specified in words instead of a decoration code. Each is avoidable at the schedule stage.

Keeping the Package With One Supplier

When wardrobes, kitchen fronts, vanities and wall panelling come from separate sources, matching wood tones becomes a negotiation between suppliers who each control their own board supply. Holding the joinery package together means one batch reference, one set of shop drawings and one inspection standard across the building. Our interior design services cover space planning, production drawings and on-site guidance through to installation and handover, so the wardrobe schedule is not the only document that has to agree.

Send us your room schedule — floor plans plus the wardrobe count by room type — and we will return a wardrobe schedule with quantities, panel splits, finish references and a production sequence for review. Made-to-measure sizing, layout and wood grain finish are specified to your project; contact PHILLIP on WhatsApp +86 13928214007 or santerson@qq.com to start.