A request for quote (RFQ) is where most wardrobe projects are won or lost before production even begins. For wall mounted open wardrobes, an incomplete RFQ is especially risky: the units are made to measure, fixed to the wall rather than standing on the floor, and supplied without doors, so every dimension, substrate and finish detail has to be agreed in writing. The checklist below covers what a serious buyer should put in the RFQ so that suppliers can quote the same thing you actually intend to build.
1. Project context and quantities
Start with who the project is for and how many units are involved. A villa bedroom, a serviced-apartment block and a boutique hotel room produce very different internal layouts even when the elevation looks identical. State the unit count, the number of separate configurations, and whether spares or a phased delivery are required. If one design repeats across several rooms, say so explicitly — repeat configurations usually carry better pricing than one-off sizes.
2. Drawings, not just measurements
Attach dimensioned drawings for each wardrobe position: overall width, height and depth, plus the internal zoning you expect (hanging rail heights, shelf pitches, drawer stacks, shoe or luggage areas). For wall mounted open wardrobes the following details matter more than buyers usually expect:
- The exact fixing line and the structural substrate behind it — solid wall, stud partition, or a finished surface that has to be penetrated.
- Whether the unit runs floor-to-ceiling or stops short, and how the top and side returns are finished.
- Skirting, architrave, cornice or services that interrupt the wall face.
- Room-side clearances for drawers and hanging rails to operate without obstruction.
If you do not have drawings yet, say so in the RFQ and ask the supplier to work from photographs plus a measurement sheet. That keeps the quotation honest about what is still assumed rather than confirmed.
3. Material, finish and edge specification
Open wardrobes show every surface, so finishes are not a secondary decision. Specify the carcass board type, the door-free front edges (these are visible in plan view), the shelf thickness and whether shelves need reinforcement over long spans, plus the finish system — lacquer, veneer, laminate or paint colour with a reference code where possible. Where you want a colour match to another element in the project, attach the sample reference rather than a colour name alone.
4. Hardware and internal fittings
List the hardware you expect: rail type and material, soft-close drawer runners, hinge loads for any closed compartments, integrated lighting or motion sensors, trouser slides, jewellery trays and mirror panels. Quote these as line items rather than lumping them into "fittings". It makes substitutions obvious when a supplier deviates, and it lets you compare two quotations on the same basis.
5. What the quotation must itemise
Ask suppliers to break the price down so that comparisons are meaningful. A usable RFQ response for this product type typically covers:
| Item | Why it belongs in the quote |
|---|---|
| Unit price per configuration | Lets you cost design changes before production starts. |
| Material and finish schedule | Pins down exactly what is being supplied. |
| Hardware list with brands or grades | Prevents quiet downgrade of runners, rails and fixings. |
| Wall fixing method and load assumptions | Wall mounted units depend entirely on the fixing detail. |
| Packaging and protection | Open carcasses with visible edges are vulnerable in transit. |
| Freight terms and destination | Incoterms decide who carries cost and risk after dispatch. |
| Lead time from approved drawings | Anchors the site programme to a real milestone. |
| Payment terms and validity period | Material prices move; quotes should state how long they hold. |
6. Site conditions and installation responsibility
State who prepares the walls, who carries out the fixing, and what tolerance the site can absorb. Wall mounted open wardrobes are usually installed after flooring and wall finishes are complete, so the RFQ should confirm the finished floor level and the completed wall plane. If you expect the supplier to provide installation drawings, an installation supervisor, or a full fixing detail for your contractor, request those explicitly — they are services, not defaults.
7. Commercial terms worth asking about
Beyond price, ask how samples and prototypes are handled, whether a pre-production approval sample is available before the full run, what inspection takes place before packing, and how claims for transit damage or missing components are settled. If your project needs several rooms fitted to the same design, ask about flexible minimum order quantities and phased shipments against the site programme.
A practical rule: if a detail is not written in the RFQ, it will appear later as an extra cost or a site problem. Anything you have not decided yet should be listed in the RFQ as "to be confirmed", so both sides quote from the same list of assumptions.
Working with a made-to-measure supplier
SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, and the wall mounted open wardrobes in our Open Wardrobes collection are supplied with made-to-measure sizing, selectable materials and finishes, and a layout tailored to each space. Send the drawings and finish schedule described above and we will return an itemised quotation; if you are still developing the design, our team can work from your brief and photographs first. Related configurations in the same collection include freestanding open wardrobes for rooms where a wall fixing is not practical, and minimalist open wardrobes where a slimmer visual profile is required.
Prepare your RFQ against the checklist above and send it with your drawings — you will get comparable quotations from any supplier, and a production-ready specification before the first panel is cut.