A ten-metre swim spa is not a product you simply pick from a list and order. On the Outdoor Swim Spa WS-S10, the shell length is fixed, but almost everything that decides how the unit performs on site — pumps, jets, water treatment, heating, insulation and whether a swim training system is fitted at all — is agreed between buyer and factory before production. The conversation you have with the supplier determines whether the spa arrives ready for your deck, your power supply and your maintenance routine, or whether those questions are still open when the container lands.
The catalogue record for WS-S10 lists a shell of 10000 × 2200 × 1420 mm, one control system, two water pumps, one filter pump, 76 jets in total, one LED light together with 40 small LED lights, and a total power figure of 7.65 kW, with water jets, LED lighting and ozone shown as the features on the standard page. Treat those figures as the starting point of the discussion rather than the finished specification: what you confirm during the quotation stage is what reaches your site.
Start with how the spa will actually be used
Two buyers can order the same shell for completely different reasons, and the specification follows from that. The catalogue carries WS-S10 in two forms: the standard model, where a swim training system is not listed in the captured specifications, and WS-S10-T, where one swim training system set is listed. If the buyer's brief is daily lap swimming against a current, that single line decides whether the unit does the job at all. If the brief is hydrotherapy, rehabilitation and evening relaxation for a household or hotel guest, jet layout and water temperature control matter far more than the swim current.
Before you discuss prices, put three usage questions in writing to the supplier: who will use the spa and how often; whether swimming against a current is a requirement or an option; and which hours of the day the unit will run. Those answers drive pump count, jet count, heating capacity and insulation grade.
Confirm the standard equipment list line by line
The most common procurement mistake with a configurable swim spa is assuming that everything shown in photographs is included. Ask for a written equipment schedule against your selected configuration, and check it item by item.
| Item on the catalogue record | Catalogue entry for WS-S10 | What to confirm before ordering |
|---|---|---|
| Dimensions | 10000 × 2200 × 1420 mm | Whether these are external shell dimensions, and the clearance needed for access routes, plant space and any cover |
| Control system | 1 set | Control placement, whether a second control point is wanted, and how the display is protected from weather |
| Water pumps | 2 pcs | Which pump serves the jets and which serves circulation or the swim current, plus service access to each |
| Filter pump | 1 pc | Filtration run hours expected for your usage pattern and where the filter housing sits for cleaning |
| Jets | 76 pcs total | Jet positions against body zones, jet types, and whether any jets are optional rather than standard |
| Lighting | 1 LED light; 40 small LED lights | Colour options, control from the main panel, and how fixtures are sealed for outdoor use |
| Total power | 7.65 kW | Supply voltage and phase available on site, dedicated circuit sizing, isolation location and who supplies the electrical work |
| Shown features | Water jets, LED lighting, Ozone | Whether ozone is included or optional, and what water treatment is specified alongside it |
The power figure in particular deserves attention. A total connected load of 7.65 kW has to match the supply your electrician can provide, and that needs settling before the unit is built, not after delivery. Ask the supplier for the electrical requirement of the exact configuration you have chosen, including how the figure changes if a heat pump is added.
Options listed in the catalogue
The optional accessories recorded for this model range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option should be confirmed against WS-S10 specifically rather than assumed from the general range.
- Heat pump. The single largest running-cost decision. Heating capacity has to suit the water volume, the local climate and how many months a year the spa is expected to hold a set temperature.
- Insulation. Relevant to energy loss and to installing the unit in colder or windier locations. Ask what insulation is specified for the shell, the cabinet and the base, and how it is protected from moisture.
- UV sterilisation and ozone. These reduce the chemical load, but they do not remove filtration and water testing from the maintenance routine. Agree which treatment combination you are buying and what consumables it needs.
- Sand filtration. An alternative to cartridge filtration with a different cleaning routine and backwash requirements; confirm plumbing, plant space and drainage before selecting it.
- Steps and access. Entry height depends on the finished deck level. Steps can be specified to suit, but they must be discussed alongside the substructure, not after it is built.
Site preparation and delivery scope
A ten-metre shell needs an access route, a prepared base and a drainage plan. Buyers should ask the supplier what they need back: point loads or total weight for the slab or deck designer, the position of plant and service access, and the location of any drain for draining and cleaning. These details change the substructure, so they belong in the pre-production conversation.
Then settle commercial scope. SANTERSON is a China-based furniture and building materials supplier offering custom/OEM work alongside freight forwarding, customs paperwork and door-to-door delivery, so it is worth asking explicitly which of those services are included in your quotation. Incoterms, who handles import clearance and duties, whether cargo insurance is offered, and what happens on site at handover — installation, inspection and snags, spare parts — should all appear as named line items rather than implied services.
What a finished specification should record
A quotation you can sign off lists the model and configuration name, external dimensions, the equipment schedule with quantities, every option selected or excluded, the electrical requirement for that exact build, the base and access requirements you are responsible for, the packaging and container plan, the delivery terms, and what support follows delivery. Anything not written down is still open.
If your project needs the swim spa coordinated with other outdoor elements — poolside loungers, a pergola, cabana daybeds or an outdoor dining set — bring those into the same enquiry. Outdoor furniture for villas and resorts ordered together with the spa can be packed, shipped and tracked as one project rather than several unrelated deliveries.
Questions worth sending before you commit
Is my target usage covered by WS-S10 or by WS-S10-T?
Send the usage brief — lap swimming, hydrotherapy, children's use, hotel guest use — and ask which model the supplier recommends and why. The difference in the captured specifications is one swim training system set; everything else on the two records matches.
Which options change the total power figure?
Ask for the electrical requirement of the standard build and of your selected option set. Heating in particular changes connected load, and your electrician needs the final number.
What maintenance does the selected water treatment need?
For ozone, UV or sand filtration, ask what consumables are replaced, how often, and whether they are supplied with the unit or ordered separately. This is a running cost that should be priced at quotation stage.
Can I see other swim spa configurations in the same range?
Yes. The catalogue also carries WS-S12, a longer shell at 11740 × 2200 × 1470 mm with 73 jets and 50 small LED lights, plus a long outdoor swim spa with a separate hydrotherapy relaxation area and a customisable-shape outdoor spa for spaces that need something other than a straight channel. Comparing three configurations side by side usually settles the size question faster than debating one.