A swim spa in the seven-metre class is not an off-the-shelf purchase. It arrives as a shell, a pump room, an electrical load and a set of site conditions that have to agree with each other before the first crane lifts anything. That is where original equipment manufacturing changes the picture: instead of buying whatever the catalogue happens to list, a project team specifies the unit around the site. This article walks through how OEM sourcing works for the Outdoor Swim Spa WS-S08T1 / WS-S08T2, from the first drawing exchange to handover, for villa, resort and residential developers.

What OEM sourcing means in this category

For a swim spa, OEM work sits between two familiar extremes. A stock order takes the standard configuration as it is. Full bespoke design starts from an empty sheet and carries tooling cost, long lead times and risk that nobody wants to absorb for a single site. OEM sourcing occupies the practical middle: the manufacturer supplies proven shell geometry, equipment layout and electrical architecture, while the buyer changes what genuinely needs changing — dimensions within the manufacturable range, jet and lighting count, filtration and disinfection choice, heating method, finish colours, control interface, packaging and, where relevant, badging for resale under another brand.

Our Custom & OEM Service covers custom furniture design and prototyping, bespoke material finishes and textures, OEM manufacturing, flexible minimum order quantities and brand customisation including engraving, logos and packaging. The same logic applies to the pool and spa range: a configuration is agreed on paper, modelled and confirmed, then released to production.

Where the WS-S08T1 / WS-S08T2 sits in the range

The pair covers models WS-S08T1 and WS-S08T2 within our configurable outdoor swim and hydrotherapy range. The catalogue lists dimensions of 7800 × 2200 × 1500 mm, with a control system, a swim training system, two water pumps, one filter pump, 50 jets in total, four LED lights plus 28 small LED lights, ozone and a total power figure of 9.55 kW.

ModelsWS-S08T1 / WS-S08T2
Catalogue dimensions7800 × 2200 × 1500 mm
Control system1 set
Swim training system1 set
Water pump / filter pump2 pcs / 1 pc
Jets50 pcs in total
Lighting4 LED lights, 28 small LED lights
Total power9.55 kW
Features shownWater jets, LED lighting, ozone, swim training system

Those figures are catalogue entries for the configuration as published. Treat them as a starting point for specification rather than a fixed delivery list: which items ship together, and what the electrical supply demands, both follow the configuration your team confirms at quotation stage.

The six steps of an OEM order

1. Brief and site data. Send the plan, section and level information for the terrace, courtyard or plant area where the unit will sit, together with access routes, lifting constraints and the intended use — daily lap swimming for residents, hydrotherapy for guests, or a spa feature that also has to look good from the living room. We design against real conditions, so drawings beat descriptions.

2. Configuration sheet. The base unit is configured item by item: overall length and width within the manufacturable range, jet zoning and seat layout, swim training unit duty, filtration route (standard cartridge or sand filtration), disinfection (ozone as listed, with UV sterilization offered as an option), heating method including heat pump where specified, insulation package for cooler climates, steps and access detail, shell and cabinet colour, and lighting arrangement. Catalogue-listed options also include control systems, water pumps and insulation; availability and compatibility vary by model, so every line is confirmed against the selected configuration before it is priced.

3. Drawings and 3D confirmation. A marked-up general arrangement drawing and a visual rendering come back for sign-off. This is the step that prevents most site problems: pump room clearances, drain and overflow positions, electrical entry point and control panel location all get fixed on paper before steel and acrylic are cut.

4. Quotation and commercial terms. The confirmed configuration drives the price, not a model number alone. Quantities, packaging, Incoterms, payment terms and any branding requirements — engraving, logos, custom packaging for resale under your own label — are settled here. Minimum order quantities are discussed openly rather than buried in a price list.

5. Production and inspection. Tooling and shell work run against the approved drawing. Before shipping we walk through the agreed checklist with you: equipment list, jet count and zoning, lighting circuit, control panel labelling, insulation and steps, plus a functional check of pumps, filtration and the swim training system.

6. Freight, installation and support. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, customs paperwork such as commercial invoices, packing lists and certificates of origin, packaging and container loading, shipment tracking and delivery to site. Import terms, duties and transit times are confirmed case by case for each destination. On the site side, Installation & After-sales Support covers on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance.

Combining a swim spa with the rest of the outdoor package

A swim spa rarely arrives alone. On villa and resort packages it sits alongside outdoor furniture for villas and resorts — loungers, cabana daybeds, dining and conversation sets — and the same project also needs interior fixtures, wall and floor finishes, lighting and cabinetry. Ordering the pool or spa together with those categories through one one-stop furniture and building materials supplier means one set of drawings, one production schedule and one container plan, instead of five suppliers arguing about who was supposed to provide the drain.

Where a project needs a different footprint rather than a modified standard one, our Customizable Shape Outdoor Spa covers square, round, oval and curved configurations in an acrylic shell with structural reinforcement, for gardens, terraces and leisure areas that do not fit a rectangular plan.

What to check before you commit the order

  • Structural support and drainage. Confirm the slab or deck bearing capacity for a fully flooded shell of this size, plus an overflow and drain route away from the structure.
  • Electrical supply. A published total power figure is not the same as a completed electrical design. Supply capacity, protection devices, cable routing and local wiring rules belong to the project engineer; we confirm equipment requirements against them.
  • Site access and lifting. Check gate widths, overhead obstruction and crane or forklift routes early — a 7.8 m shell cannot be redirected once it lands.
  • Operating environment. Insulation level, heating method and control placement should follow the actual climate and how many months a year the unit is used.
  • Local approvals. Any permits, barriers or safety requirements around water features are set by the local authority. Confirm them with your own consultant before ordering; we do not certify compliance for another jurisdiction.
The specifications quoted above are catalogue entries for the WS-S08T1 / WS-S08T2 configuration as published. Included equipment, option compatibility and electrical requirements are confirmed in writing against your selected configuration before production begins.

Working with a manufacturer who handles the whole scope

We have been manufacturing furniture and building materials since 2008 and supply project customers in hospitality, villas and offices across five continents. Our Turnkey Interior Project Solutions run through consultation, design and planning, production, logistics, installation and after-sales, which is exactly the sequence an OEM swim spa order needs. See the Swimming Pools and Swim Spas range for other models in the same configurable family.

Send your drawings, site photographs and target configuration for the WS-S08T1 / WS-S08T2 to PHILLIP by email at santerson@qq.com, or by phone/WhatsApp on +86-13928214007. Enquiries are answered within 24 hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).