A product submittal is the document pack a buyer, architect or main contractor reviews before they approve a swim spa for a villa, resort or clubhouse scheme. For the Outdoor Swim Spa WS-130Aⅲ, that pack has to do two jobs at once: prove the shell and equipment match the design intent, and give the site team everything they need to plan foundations, power, access and handover. Below is the checklist we work to when a client asks us for a submittal on this model.
1. Cover sheet and scope statement
Start with one page that states the project name, the model being submitted, the date and revision number of the document, and who prepared it. State plainly which items are included in the supply and which are excluded, because swim spa disputes usually begin at this boundary rather than at the equipment list.
For a configurable range such as ours, name the exact variant. The catalogue lists WS-130Aⅲ and WS-130Aⅲ-U at the same 8000 x 3000 x 1400 mm footprint, but their equipment differs, so a submittal that quotes only "WS-130A" cannot be approved as it stands. Confirm the variant on the cover sheet and repeat it in every schedule.
2. Dimensioned drawings and clearances
- Overall shell dimensions, water depth and finished floor level of the basin.
- Plan view showing where steps, seating, jet zones and the swim training end sit inside the 8000 x 3000 mm footprint.
- Access notes: delivery route, crane or forklift points, and the assembly sequence on site.
- Plant room or equipment recess dimensions, plus service access to pumps and filters.
Architects approve drawings, not photographs. Send dimensioned sketches with levels marked, even when they are simple, and let the local engineer produce the structural setting-out drawing against them.
3. Equipment schedule
List every component with a quantity, so the buyer can compare two quotations on the same basis. The catalogue specification for WS-130Aⅲ reads as follows; treat it as the starting point and confirm each line for the configuration you are actually ordering.
| Item | Catalogue entry for WS-130Aⅲ | What to verify in the submittal |
|---|---|---|
| Dimensions | 8000 x 3000 x 1400 mm | Whether depth is measured to coping or to finished floor level |
| Control system | 1 set | Location, mounting height and who provides the low-voltage run |
| Swim training system | 1 set | Whether it is included in your configuration or an add-on |
| Water pump / filter pump | 1 each | Flow rate, filtration cycle and replacement element availability |
| Jets | 20 pcs | Jet layout drawing and the seating area each jet group serves |
| LED lights | 7 | Colour mode, control method and cable route to the junction box |
| Total power | 10.85 kW | Voltage, phase, circuit size and breaker rating at your site supply |
The related Outdoor Swim Spa WS-130Aⅲ-U is a useful comparison for procurement teams: same shell size, but the captured specification shows more pumps and jets, a different light count and a higher total power figure. If two quotations look identical on the plan but behave differently on the electrical bill, this is often why.
4. Options and accessories, priced separately
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Put each option in its own priced line with a clear yes or no against it. A heat pump changes both the running load and the noise profile; insulation changes heat retention overnight; steps change the entry geometry. None of them should be decided verbally after the order is placed.
5. Electrical, plumbing and water treatment data
Include supply requirements (voltage, phase, dedicated circuits, earthing and residual-current protection as specified by your local electrician), cable entry points, and the load table for pumps, blower and lighting. Add the fill, drain and overflow arrangement, and state how ozone treatment is dosed and controlled. The water treatment method shown for this model is ozone; if a project also requires UV sterilisation, that is an option line, not an assumption.
Electrical figures in a catalogue are typical values for the standard configuration. Have the local electrical contractor confirm ratings against the site supply before any cable is ordered.
6. Materials, finishes and structural support
- Shell material and finish, with a sample reference or colour code.
- Cabinet or cladding material on the visible exterior, matched to the terrace palette.
- Bearing points and the load-bearing arrangement for the slab, deck or plinth, checked against the filled weight by your structural engineer.
- Drainage and ventilation detail under the unit when it sits in a recess.
The catalogue entry for this model records the features shown rather than a full material schedule, so ask us to state shell and cabinet materials explicitly in the submittal. Do not let a data sheet written for another spa in the range stand in for the one you are buying.
7. Delivery, installation and handover documents
Buyers on overseas projects care as much about the logistics pack as the product itself. Attach packing list and container loading plan, freight mode options, and the shipping documents your customs broker needs. Then attach an installation sequence, a snag and commissioning checklist, and an operation and maintenance manual covering filter cleaning cycles, winterisation and spare parts. Our wider service scope covers Furniture Logistics and Door-to-door Delivery and Furniture Installation and After-sales Support, so these documents can be prepared as part of the same package rather than chased separately.
8. Commercial terms and approval record
- Quotation with unit prices, options, currency and validity period.
- Lead time from confirmed drawings, payment terms and inspection release point.
- Warranty scope for shell, pumps and controls, stated separately.
- A signature block for consultant, contractor and client approval, with revision control.
How we assemble the pack
Because a swim spa rarely sits alone in a scheme, we prepare it alongside the rest of the outdoor package. The Swimming Pools and Swim Spas range is specified together with Outdoor Furniture for Villas and Resorts, so loungers, shade structures and paving levels can be coordinated on one drawing set instead of three. Send us the model you are evaluating, the site drawings and your target approval date, and we will return a submittal pack with the schedules above filled in and every option priced.
Request a WS-130Aⅲ submittal pack
Tell us the project location, the variant you are considering and the consultant who must approve it. We will confirm the configuration, issue dimensioned drawings and equipment schedules, and set out delivery and installation scope for your review.