Wood grain melamine cabinets are ordered to the dimensions of your kitchen, so a meaningful price follows a short exchange of drawings, appliance details and finish choices. The guide below explains what we need from you, how the enquiry runs from first message to itemised quotation, and what is confirmed at each step.

What Our Wood Grain Melamine Cabinets Include

Our Wood Grain Melamine Cabinets belong to the melamine kitchen cabinet collection and are made for residential kitchen projects. Each order is produced with made-to-measure sizing, a choice of material and finish, and a layout drawn around the actual space rather than a standard module size. The same approach applies to the matching Wood Grain Melamine Wardrobes, so bedroom joinery can be specified in a coordinating tone and texture.

Alongside the wood grain look, the collection covers high gloss, matte, textured, two tone and minimalist slab melamine doors. That range lets you match cabinet fronts to wall panels, doors and flooring from one supplier instead of co-ordinating several separate orders.

Information We Need Before Pricing Your Cabinets

Send what you already have; we will fill the gaps with you. The items below are what normally determine price and lead planning:

  • A drawing or dimensioned sketch of the kitchen, including wall lengths, ceiling height, window sills, doors and any structural columns.
  • The appliance list with model dimensions for built-in ovens, cooktops, refrigerators, dishwashers and extraction.
  • Your preferred layout: straight run, L-shaped, U-shaped or with an island.
  • Door style and surface from the melamine range, plus the hardware you expect (hinges, slides, handles or a handleless profile).
  • Worktop material and thickness, splashback type and whether these are supplied by us or on site.
  • Interior fittings: drawer boxes, pull-out corners, pantry tall units, appliance garages, integrated lighting.
  • Quantity of sets and the number of bathrooms, bedrooms or units involved, if wardrobe joinery is part of the same order.
  • Delivery address, port of discharge and who acts as importer of record.

How The Quotation Process Runs

The enquiry follows the sequence described on our Interior Design Services page: project brief and design proposal, then quotation with detail confirmation, then production, shipment and follow-up.

StageWhat you sendWhat we return
1. BriefDrawing or site measurements, appliance list, finish preference, destination port.Questions we need answered, plus an indicative price range for the layout.
2. Design and specificationFeedback on the proposal; confirmation of doors, worktops and interior fittings.Cabinet layout drawings, a detailed itemised quotation and a material/finish schedule for approval.
3. ConfirmationSigned drawing set and purchase order; deposit as agreed.Production schedule, packing list basis and shipping options for your destination.

If you do not have drawings yet, our team can work from a floor plan or on-site measurements. As part of our Custom & OEM Service, we also handle bespoke finishes and textures, prototyping and private labelling for developers, builders and furniture brands ordering under their own name.

Questions That Usually Affect The Price

  • Panel and substrate choice. Tell us the environment the cabinetry sits in; we will confirm which board and edge treatment suit your climate and use.
  • Non-standard heights and depths. Full-height pantry walls, ceiling-height units and shallow corner runs all change material usage.
  • Hardware grade and brand. Soft-close sets, drawer systems and integrated lighting are quoted separately from the carcass.
  • Mixed finishes in one kitchen. Two-tone schemes with a contrasting island add panel changes and edge banding on more faces.
  • Order size. Multi-unit residential work is priced differently from a single kitchen, and our custom service supports flexible minimum order quantities.

Shipping, Installation And What Comes After The Quote

Cabinets travel in project packing with a marked crate list, and we arrange freight by sea, air or rail together with the export paperwork. Details of the logistics scope are on our Logistics and Door-to-Door Delivery page; import duties, local permits and site preparation remain the buyer's responsibility, and we will confirm terms for your destination before order confirmation.

After delivery, installation support and snag inspection are available as described under Installation and After-sales Support. For whole-house work, cabinets can be co-ordinated with wardrobes, doors, wall panels, flooring, lighting and bathroom fixtures through our One-stop Solution, which covers design consultation, material selection, manufacturing, project management and handover.

Before you send the enquiry: check that all critical dimensions are taken from the finished floor and wall levels, confirm the appliance models you intend to buy, and note where plumbing and extraction points sit. Those three items resolve most of the revisions in a cabinet quotation.

Send your drawings, appliance list and delivery destination to our team, and we will return an itemised quotation with drawings for your approval. Phone / WhatsApp: +86-13928214007 (PHILLIP), email: santerson@qq.com, or use the Contact Us page.