A decorative metal screen looks like a small item on a hotel or villa bill of quantities until it reaches site: panels arrive in the wrong split, the finish does not match the joinery, and the opening cannot take the weight or the fixing detail. If you are procuring furniture and building materials for one package, treat the Custom Bronze Stainless Steel Laser Cut Decorative Screen Partition as a scheduled line item with its own dimensions, finish code, panel schedule and fixing note, not as an accessory you settle at the end.

Why screens fall out of the materials schedule

Whole-project materials schedules work because every product is described to the same depth: location, size, finish, quantity and responsible trade. Decorative screens usually get less. They sit between three packages — interior fit-out, wall finishes and metalwork — so nobody owns the line. The result is a schedule entry that reads "bronze screen to feature wall", which cannot be quoted, fabricated or installed.

Our laser-cut partitions are made to order. Pattern, panel size, overall width, panel count, substrate and surface finish are all set from your drawing, photograph or reference image, so the schedule line has to carry that information for the quotation and the shop drawings to line up. The same discipline applies whether you specify the antique bronze partition used on wide lobby walls, a Custom Gold Stainless Steel Laser Cut Decorative Screen Partition for a reception backdrop, or a screen detailed for a decorative partition for hotel reception areas.

What to write into each schedule line

Use one line per opening, not one line for the whole job. Each entry needs enough detail for a fabricator to price it and for the site team to install it without a phone call.

Schedule fieldWhat to record
Location and tagRoom or grid reference plus a unique screen tag (for example SCR-01, SCR-02), so panels, shop drawings and delivery notes all refer to the same opening.
Overall size and panel splitTotal width and height of the opening, plus how many panels it is divided into and which edges are fixed. Multi-panel configurations for wide feature walls are fabricated to exact dimensions, so the split must be agreed before production.
Pattern referenceAttach a numbered pattern drawing or reference image. A written pattern name alone is not enough once several screens in the project carry different motifs.
Material and finishStainless steel substrate and the surface treatment as named on the product page — brushed gold, matte black or antique bronze are typical options. Keep the finish code consistent with your joinery and door schedules so one finish name does not mean three different products.
Frame and edge detailFrame style, whether edges are framed or finished flush, and how the screen meets floor, ceiling and adjacent wall.
Fixing and supportSubstrate behind the screen, fixing method and who provides the blocking or backing. Screens act as both space divider and decorative element, so the supporting structure must be shown on the drawings that the fit-out trade works from.
Cleaning and handoverHow the panel is cleaned and protected after installation, which matters in lobbies and reception areas with heavy traffic.

Coordinate the screen with adjacent finishes

A laser-cut screen is read together with what surrounds it. Light passing through the cut pattern casts shadows on the wall and floor behind it, so the finish on that background — paint, stone or stone and marble panels — changes how the pattern reads. Schedule the screen and its background wall as a linked pair, with the same revision reference on both lines.

The same applies to neighbouring items in the fit-out package. Where a screen sits beside wood panel partitions, wall panel systems or partition sliding systems, set the reveal and level tolerances once and apply them to all lines. Screens that are scheduled in isolation tend to arrive at site with sizes that clash with the paneling already fixed.

Sequence the screen inside the procurement timeline

Screens are custom items, so they follow the same sequence as other made-to-order products rather than the off-the-shelf part of the schedule. A practical order of work:

  • Schedule and design freeze. Lock the opening sizes, panel split and pattern reference before any screen is released for pricing. Late changes to a feature wall dimension usually mean re-cutting every panel in that run.
  • Quotation and detail confirmation. Send the drawing, photograph or reference image with the schedule line so material, finish, thickness and panel count are confirmed against your design scheme.
  • Production and quality control. Screens are fabricated with the rest of the metalwork and joinery package, which is where grouping them under one supplier keeps finishes consistent.
  • Logistics. Panels travel with the wider shipment; keep screen tags on the packing list so site can match each crate to its opening.
  • Installation and handover. Fix after the background wall finish is complete, then inspect the pattern alignment across panel joints before sign-off.

This mirrors how we run a whole project package under custom and OEM service: design input, detail confirmation, production, then logistics and door-to-door delivery and installation and after-sales support. Screens scheduled in the same pass as cabinetry, wall paneling, lighting and flooring reach site with the rest of the fit-out instead of arriving as a late variation.

A worked example: lobby feature wall

Take a reception wall where an antique bronze screen runs the full width behind the front desk. In the schedule it becomes three lines rather than one: the screen itself with its tag, overall size and panel count; the background wall finish that receives the shadow pattern; and the backing structure that carries the fixing. Each line names the same revision so a design change on site updates all three together.

For guest-facing areas we fabricate these screens as multi-panel configurations for wide feature walls, with material, finish, panel count and size set to your dimensions. In a villa project the identical method applies to a screen used to separate a dining area from a lounge — same fields, same tags, fewer panels.

Before you release the schedule: confirm every screen line carries a tag, an opening size with panel split, a numbered pattern reference, a named finish, and a note on who provides the backing structure. Any line missing those fields will come back as a query during quotation.

Bring the screens into one package

SANTERSON manufactures laser-cut stainless steel screens alongside the cabinetry, wall and ceiling finishes, flooring, lighting and furniture that fill the rest of a hotel, villa or office materials schedule. Sending us your drawing, photograph or reference image with the schedule lines is enough to start pricing and shop drawings for the whole package.