A product submittal is the document set a buyer, builder or designer reviews before they approve built-in joinery for manufacture. For an L Shaped Walk in Wardrobes package, the submittal has to do one job: let the person signing the purchase order confirm that this exact wardrobe will fit this exact room, in the finish they selected, with the internals they actually need. Below is the checklist we work to when preparing a submittal for our residential wardrobe projects.
Why an L-shaped walk-in needs a fuller submittal than a straight run
A straight wardrobe run has one elevation, one set of door widths and one shelf plan. A corner layout carries two runs meeting at a return, and every decision on one leg changes the other. The corner carcass itself is a separate item from the adjacent modules, the top of the return leg usually has to be scribed or boxed in against an existing wall, and doors, drawers and hanging rails must clear each other where the two legs meet.
That is why we ask buyers to review a complete submittal rather than a price line. When the corner detail, the door swing and the finish schedule are all confirmed on paper before production starts, the site team is not discovering them on the day of installation.
1. Dimensioned drawings of both legs
The core of the submittal is a set of dimensioned drawings, not a render. For an L-shaped layout we provide:
- Two elevations, one for each leg of the L, showing overall height, module widths and the vertical division between modules.
- A plan view showing both runs, the depth of each run and how the corner carcass sits relative to the two walls.
- The return dimension, measured to the finished wall face, so skirting, tiles or plaster are accounted for rather than assumed.
- Ceiling condition, whether the unit runs to a level ceiling, an angled ceiling or a bulkhead, and how the top of the unit is closed off.
- Obstruction notes, marking switch plates, downlights, air grilles, pipes and door openings that fall inside the wardrobe footprint.
2. A written layout schedule
A drawing shows where things go; a schedule states what each module is. We list every module in the run, its width and height, its function and its front treatment. This is where the difference between U Shaped Walk in Wardrobes and an L layout becomes obvious on paper, because the schedule makes clear which leg carries long hanging, which carries drawers and where the corner is given over to shelving.
| Zone | What the submittal must state |
|---|---|
| Long hanging | Number of rails, rail height, whether a second drop rail or pull-down rail is used, and clearance above the rail for shelving. |
| Short hanging and shirts | Rail heights for jackets, shirts and folded shorter garments, so the buyer can see the split rather than guess it. |
| Drawers | Drawer count per module, front or internal placement, and whether jewellery or divider trays are specified. |
| Shelving | Shelf spacing, whether shelves are adjustable, and which bays are sized for bags or boxes. |
| Corner zone | How the corner is used: shelved carcass, pull-out rack or open bay, with the access path to it from both legs. |
| Open display | Any open bays or glass-fronted sections, and whether they sit inside or outside the door line. |
3. Door type and clearance study
Doors are where L-shaped layouts fail most often in a submittal review. Hinged doors need an arc of clear space in front of them; sliding doors need track depth and an overlap allowance; a full-height glass door needs its handle position checked against the neighbouring module. The submittal should show, on plan, that each door can actually open without hitting the perpendicular run or another door.
Where a mirrored or Glass Sliding Door Wardrobes front is specified on the short leg, we also confirm the track arrangement and the access width left once one panel is slid open. Walk-in layouts are entered as well as used, so the circulation gap in front of the corner matters.
4. Material and finish schedule
The finish schedule is a table, not an adjective. For each surface we record the substrate, the finish system and the colour or decorative reference, because carcass panels, door fronts and internal boxes are frequently three different materials in one wardrobe.
- Carcass and internal boxes, typically a melamine board choice such as Wood Grain Melamine Wardrobes panels, with the edge banding colour matched and stated.
- Door fronts, in laminate, lacquer, veneer or glass, listed separately from the carcass so substitutions are visible.
- Glass and framing, where used: glass type, tint or surface pattern, and the profile colour of the aluminium frame.
- Hardware, with hinge, slide, handle and rail references, so a buyer's own site team can source replacement parts later.
- Samples, referenced by code, with physical samples sent for sign-off before colour is locked into the order.
5. Lighting and electrical coordination
Walk-in wardrobes are used in low ambient light, so internal lighting usually appears on the drawing as a note rather than an afterthought. Where integrated lighting is specified, we coordinate it with Integrated Cabinet Lighting and state in the submittal where the fixtures sit, how the driver is accessed, and which points your electrician must run before the carcass is installed.
Electrical details are confirmed against the specific cabinet design for each project. Fixture ratings and compatibility are checked per configuration rather than carried over from a previous job.
6. Manufacturing, tolerance and installation information
A submittal that stops at the drawing leaves the buyer guessing about how the unit arrives and goes in. We include:
- Made-to-measure confirmation, stating which dimensions are fixed by the approved drawings and which require a site check before release.
- Packaging and pallet list, so the receiving team knows what arrives and can check it against the schedule on delivery day.
- Assembly sequence for the corner, since the corner carcass normally has to be set before the adjoining modules can be scribed to it.
- Wall condition notes, covering out-of-plumb, out-of-level or unevenly finished walls, and how the unit is lined and scribed to them.
- Responsibility split, stating plainly which party carries site measurement, electrical first fix, plinth or skirting works and final installation.
7. Logistics information for imported joinery
Built-in wardrobes are usually shipped from the factory where they are made, so a submittal for an overseas-sourced package should also state how the goods will move and what your site team needs to be ready for. We confirm the shipping mode for the order, the packaging standard for panelled joinery, the pallet or container arrangement, and the documents that travel with the consignment under our Furniture Logistics and Door-to-door Delivery service. Delivery scope, duties and Incoterms are agreed for each project rather than assumed.
The same document set should say who installs. Where we provide installation support, the scope is written down: setting and levelling the carcass run, hanging doors, adjusting slides and rails, and signing off a snag list at handover under Furniture Installation for Interior Projects. Where your own joiner installs, those pages become their instruction pack, and the tolerance notes matter even more.
8. Approval record and revision control
Every submittal we issue is versioned, dated and tied to the approved drawing set, so a late change to a drawer stack or a door finish does not quietly alter something already in production. The approval page lists what has been signed off and what is still open. Buyers should check that list before they sign; an unresolved item marked "to be confirmed on site" is fine only if someone on their side owns that confirmation.
What to send us at the start
To turn a request into a submittal quickly, three inputs are usually enough: the room drawings or a marked-up plan with wall lengths and ceiling heights, your preferred finish direction, and how the wardrobe will be used day to day. From there we prepare the layout, the schedule and the finish options for review under our Custom Furniture Design and Prototyping service, and coordinate them with the rest of the built-in joinery through Built-in Furniture.
Send your drawings for a wardrobe submittal. Share your plan, room dimensions and finish direction, and we will return dimensioned elevations, a module schedule and a material and hardware list for review before anything enters production.