Grey two-tone kitchens have moved from a show-home look to a standard specification on villa, apartment and boutique hotel schedules. Flat panel fronts in a light grey upper band over a dark grey base read clean on a drawing, photograph well for marketing, and hide everyday wear better than a single pale finish. That is exactly why the same cabinet line appears repeatedly on project bills of quantities — and why the supplier behind it matters more than the colour chip.

A kitchen package is one of the few interior items where the buyer signs off dimensions, materials, hardware, appliance clearances, packaging and delivery in a single order. Get one of them wrong and the correction happens on site, weeks later, at someone else's cost. The checklist below is what we would ask any project buyer to verify before placing a cabinetry order with an overseas kitchen cabinets supplier — including the questions we are happy to answer about our own work.

1. Can the supplier actually build to your dimensions, or only to a catalogue?

Two-tone grey schemes fail in two ways: the light and dark tones come from different batches and do not match under site lighting, or the units are standard sizes forced into a non-standard room. Ask whether panel colour, surface finish, cabinet depth, carcass height and internal partitions are made per project, and ask for the physical sample of both panels in the same lighting condition you will use on site.

Our light & dark grey modern kitchen cabinets are built to that rule: light grey uppers over dark grey lowers, flat panel doors, and full adjustment of cabinet dimensions, internal storage partitions, panel colour and surface finish. The same layout logic carries across our grey modern kitchen cabinets with an LED glass wine cabinet for larger villas, and across layouts such as the L-shaped and U-shaped corner configurations listed on the site.

2. Does the specification include hardware, or is it left to the local installer?

Cabinet hinges, drawer slide rails, support legs and connecting brackets are cheap items that cause expensive delays when they are omitted from a shipment and have to be sourced locally in mismatched sizes. A supplier who treats cabinetry as an interior fixture rather than a set of boxes will list the matching hardware on the packing documentation.

For project work we supply kitchen cabinetry with matching hinges, slides, legs and brackets recorded against the order, so the site team opens a complete package. See custom built-in kitchen cabinets for hotel and apartment projects for how that scope is written up.

3. Are glass, lighting and appliance zones resolved on the drawing?

Two-tone grey kitchens usually carry three "engineering" items behind a simple appearance: illuminated glass display cabinets, an under-cabinet light strip over the working top, and recesses for built-in refrigerators and ovens. Each one needs a decision before production, not after delivery.

  • Glass type and glazing bar layout for display cabinets — clear, frosted or smoked glass changes both price and the look of what is stored inside.
  • LED colour temperature and driver location. Warm LED strips are serviceable only if the driver sits in an accessible position, and long runs need a supply point in the carcass drawing.
  • Appliance recess dimensions taken from the actual appliance models selected, including ventilation gaps and door swing, so stacked ovens and integrated fridges land flush.

4. Does the supplier handle the rest of the fit-out, or only cabinets?

A kitchen is never ordered alone on a real project. Wardrobes in the same panel colour, vanities and countertops, doors and wall panelling, flooring, lighting and rugs all get specified against the same finish schedule. Splitting that work across several factories multiplies the coordination load on the buyer: separate drawings, separate samples, separate shipments, separate claims.

SANTERSON works as a one-stop furniture and building materials supplier, so the grey panel that appears on the kitchen front can be carried into wardrobes, vanities, media walls and panelling from the same production programme. The wider range covers furniture series, building and construction materials, and interior fixtures.

PackageWhat the buyer should confirm before order
Kitchen cabinetryPanel sample in site lighting, appliance models and recess sizes, hardware list, glass specification, LED driver access
Wardrobes and storage wallsSame panel colour batch as kitchen, internal layout per room, door mechanism (hinged, sliding, pocket)
BathroomsBasin and toilet mounting type, trap direction, vanity dimensions against tiled setout
Flooring and wall finishesBoard format and thickness, transition details at doors, cladding fixing method
Lighting and loose furnitureVoltage and driver compatibility with the destination market, fabric and finish approvals

5. Who answers the drawings — and in what order does the project run?

Ask for a named contact and a written sequence before any price is compared. Our cooperation steps are straightforward: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. The interior design services page covers space planning, concept and mood boards, furniture layouts with 3D renderings, and coordination of drawings with production.

The same sequence sits behind the turnkey solutions for villa, hospitality and office projects, where consultation, design, production, logistics, installation and after-sales are handled as one programme rather than six separate contracts.

6. What happens between the factory floor and your site?

Cabinetry is heavy, bulky and unforgiving of a wet container. Ask how panels are protected at edges, how carcasses are packed and braced, what goes in each crate, and who prepares customs documentation. We arrange sea, air and rail freight with packing and container loading, shipment tracking and door-to-door delivery; commercial paperwork is prepared by the same team that produced the goods.

For Australian buyers this is where diligence pays. Import terms, duties, Incoterms, insurance and transit time should be confirmed for your specific project in writing, not taken from a brochure. We will set them out per shipment, including cargo insurance options and a named logistics coordinator.

7. Installation and the snag list

A kitchen delivered is not a kitchen handed over. Confirm what happens after arrival: on-site installation support, inspection against a snag list, spare parts availability, and who answers when a door is out of alignment three months later. Our after-sales scope covers installation support, inspection and snags, warranty coverage, spare parts and ongoing maintenance. Warranty terms, response times and exclusions are confirmed per project, so read them rather than assuming them.

8. Evidence, not adjectives

Any supplier can describe itself as premium. Ask what has been built, where, and whether you can see the drawings behind the photographs. Published project references we can walk a buyer through include villa work in Willoughby, Perth, North Turramurra, Melbourne and Sydney, alongside hotel and office projects in China and apartment work in Saudi Arabia.

A useful test with any cabinetry supplier: send one room drawing and ask for a dimensioned layout back, with the appliance recesses, glass cabinets and LED positions marked. The quality of that reply tells you more than any showroom visit.

What to send us if you want a quotation

  • Room drawing or architectural sheet with the kitchen setout, plus the finish schedule page showing the grey panels.
  • Appliance list with model numbers, or tell us you need recesses reserved and we will propose standard clearances.
  • Destination port or site address, so freight can be quoted to the right place.
  • Whether wardrobes, vanities, doors or flooring should be quoted from the same panel programme.

Send your drawings to PHILLIP at santerson@qq.com, or reach us on WhatsApp at +86-13928214007. Enquiries receive a reply within 24 hours during business hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8). Our contact page lists the China, Vietnam, Singapore and Johannesburg offices.