A mirrored hinged wardrobe looks simple on a drawing: a run of doors, a mirror surface, a set of hinges. In practice it is one of the tighter items in a bedroom fit-out, because the door leaf has to carry glass, swing through a fixed arc and still line up with its neighbours years later. When the designer's intent and the buyer's specification are not aligned before production starts, the cost shows up as site rework, delayed handover and a set of doors nobody wants to open. Below is what we ask project teams to settle first.

1. Clearance for the swing, not just the opening

Hinged doors need clear swing space that sliding doors do not. Before a layout is signed off, both parties should confirm what sits inside the arc: the bed edge, a bedside table, an ensuited door, a skirting return or a radiator. A wardrobe that reads well on a plan can still fail in use if the nearest obstruction stops the leaf at 60 degrees instead of 90.

Agree three numbers early and record them on the same drawing: overall width and height of the run, the depth of carcass plus door and handle, and the distance to the closest fixed obstruction. Where the room is tight, say so at enquiry stage — a mirrored hinged wardrobe made to measure can be rebalanced into fewer, narrower leaves rather than wide doors that never fully open.

2. Mirror type, glazing safety and edge detail

"Mirrored door" covers several different build-ups. Designers should state which surface they expect — full-height mirror panel, mirror framed by a timber or lacquered border, or mirror combined with another front such as glass or a panel — and buyers should confirm what the factory is actually quoting. The edge detail matters just as much: a rebated, wrapped or bevelled edge changes both appearance and how the panel is protected in transit.

Mirror thickness, backing and glazing requirements are project-specific. Different markets and building types carry different expectations for glass and mirror in furniture, so state the requirement in your enquiry and have the manufacturer confirm the build-up they will supply. Do not assume a mirror panel from one project carries over unchanged to the next.

Specification rule of thumb: if the drawing does not name the mirror type, edge detail and door construction, then nobody has specified them yet. Put it in writing before a price is compared.

3. Hardware schedule: hinges, handles and soft close

Mirror-fronted leaves are heavier than a plain panel of the same size, so hinge loading is a real constraint rather than a formality. The alignment conversation should produce one agreed hardware schedule covering hinge type and quantity per leaf, load rating, soft-close or standard action, handle style and finish, and who supplies each item.

  • Hinge type and fixing method — concealed, cup or surface-mounted, and whether the frame detail allows it
  • Number of hinges per leaf, set by leaf height and weight rather than habit
  • Soft close on doors, drawers or both, and which brand line is being quoted
  • Handle or integrated pull — a protruding handle reduces effective clearance in a narrow room
  • Cabinet interior ironing: rail heights, drawer stacks, shelves and any lighting, all shown on the same sheet as the doors

4. Tolerances, floor level and who measures

Mirrored hinged runs are unforgiving of an out-of-level floor: a few millimetres of variation across a wide run is visible in the reflection long before it is visible in the carcass. Decide at the outset who takes the final site dimensions and at what stage — ideally after flooring, skirting and plaster are complete, not from architectural drawings alone.

Then agree how that variation is handled. Scribed filler panels, an adjustable plinth or a shadow gap are all legitimate answers, but they must be chosen and drawn before manufacture. A made-to-measure item quoted from drawing dimensions and installed over unfinished floors is where most alignment failures begin.

5. Finish coordination with the rest of the joinery

A wardrobe rarely stands alone. It sits beside doors, wall panelling, a vanity and often kitchen or laundry cabinetry in the same palette. Designers should issue one finish schedule covering veneer, lacquer, melamine or acrylic and the sheen level, so the mirror front is read against the correct surface rather than an approximation.

Where the joinery package comes from a single custom bedroom wardrobe and cabinetry source, matching a veneer or lacquer across wardrobes, flat panel hinged wardrobes elsewhere in the scheme and internal fit-outs becomes an internal coordination task for the factory instead of a colour-matching risk on site. That is usually the cheapest place to remove risk from a joinery package.

6. What the buyer should send, what the designer should sign

Designer providesRoom layout with swing clearances, elevation drawings with door split and mirror detail, finish schedule, hardware preferences, ceiling and floor conditions.
Buyer confirmsBudget band and quantity, delivery location and access, installation responsibility, inspection and sign-off criteria, replacement parts route.
Manufacturer returnsShop drawings for approval, confirmed dimensions and material build-up, hardware schedule, packing and container plan, installation sequence.
Both sign offA single approved drawing set with revision numbers, so production and site work from the same version.

7. Handover criteria agreed in advance

Write the acceptance test into the order: doors open and close without binding, gaps consistent across the run, mirror surfaces clean and free of edge damage on arrival, soft-close action working on every leaf, and a snag list closed before handover. Deciding what "done" means before shipping removes most arguments afterwards, particularly on projects where installation is carried out by a local crew rather than the manufacturer's team.

SANTERSON is a China-based furniture and building materials manufacturer supplying custom, made-to-measure joinery for villa, hospitality and office projects, with design coordination, production, door-to-door logistics and installation support. Send us your elevations, clearance constraints and finish schedule and we will return shop drawings for approval.