A swim spa looks simple on a datasheet: a shell, a pump package and a set of jets. On site it is a small plant room in a shell, and most disputes between buyers and suppliers trace back to what was never written down. If your project team is evaluating the Outdoor Swim Spa WS-125AⅣ for a villa, resort or clubhouse deck, this checklist covers the records worth opening a file for before the purchase order is raised.
1. Model code and configuration variant
SANTERSON publishes more than one build under the same shell size, and the difference matters to whoever signs the electrical work. The WS-125AⅣ record lists a swim training system as part of the standard feature set, while the WS-125AⅣ-U variant does not list that system and carries a different pump count. Record the exact model code on the purchase order, on the drawing schedule and in the handover file, then confirm which options were quoted with it. A quotation that says "125 series" is not a specification.
2. Catalogue dimensions versus site clearance
The catalogue dimension for this model is 5500 × 2300 × 1350 mm. Treat that as the unit, not the opening. Your file should show the finished pad or recess with tolerances, plus clearance for the plant access side, an inspection hatch where required and room for anyone who will later service the pumps and filters. Note how the spa meets the deck: flush, semi-recessed or above ground, and whether steps are part of the order.
3. Equipment schedule line by line
The published specification for the WS-125AⅣ is a good starting point for your own schedule. Copy it into your document and mark each line as included, optional or to be confirmed:
| Item shown in the catalogue | What to write in your record |
|---|---|
| Catalogue dimensions 5500 × 2300 × 1350 mm | Unit size plus the built dimension you have allowed on site |
| Control system, 1 set | Location of the controller, who operates it, spare key or access code |
| Swim training system, 1 set | Whether your chosen configuration includes it, and the intended use (lap swimming, therapy, gym programme) |
| Water pump, 1 pc / filter pump, 1 pc | Pump duties and the electrical circuit feeding each one |
| Jet total, 20 pcs | Which seats the jets serve, and whether any are optional upgrades |
| LED lights, 3 pcs | Fixture positions and switching arrangement |
| Total power 8.05 kW | Confirmed supply capacity, protection device and cable route for the configuration you ordered |
| Features shown: water jets, LED lighting, ozone, swim training system | Which of these are in your quotation, and what is not included |
The catalogue also lists optional accessories for this range, including control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs a written confirmation before order rather than an assumption carried forward from the brochure.
4. Power, water and drainage assumptions
Total power figures in the catalogue are tied to a specific configuration, so never hand an electrician a brochure page. Have them work from the confirmed build: number of pumps, heater or heat pump option, control system and lighting count all change the load. In your file record the supply voltage and phase as agreed with the supplier for your order, the location of the isolator, and who is responsible for the final connection. On the wet side, document the fill source, drain or overflow route, and where the wastewater discharges.
Anything an installer adds on site should be recorded in the same file as the factory specification. Two sources of truth is how warranty claims get argued later.
5. Basis of the numbers you are quoting
Write down which document each figure came from, and date it. Catalogue dimensions and equipment counts describe a standard build; your contract should say what was actually supplied. Where the supplier's own pages show different figures for related models, note that difference explicitly rather than averaging it out. If a specification is revised during the project, keep both versions with the revision date so claims about scope have an audit trail.
6. Delivery, lifting and site access
A spa of this footprint arrives as a single large unit, and the practical questions are all about getting it to the pad. Your logistics record should cover the delivery address and unloading method, any crane or lifting gear needed, the route from the truck to the installation position, and floor loading or ground conditions along that route. SANTERSON's logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading and shipment tracking; the useful step for your team is to confirm in writing who handles unloading and on-site movement at each end.
7. Commissioning, handover and after-sales terms
Before practical completion, capture what the supplier will commission with you: filling, electrical checks, pump and jet operation, controller settings, water treatment start-up. Then record the handover pack you expect to receive: as-built configuration list, wiring diagram, spare parts list, consumables such as filters, and the operating instructions for whoever maintains the unit. Finally write down what after-sales support actually covers for your project, including response arrangements, warranty scope and exclusions, and how spares are ordered. SANTERSON lists installation and after-sales support among its services; the terms that matter to you belong in your contract documents, not in a marketing page.
8. Coordination with the rest of the outdoor package
Swim spas rarely sit alone. Poolside loungers, shade structures and hardtop pergolas share the same deck, drainage falls and lighting circuits, and one supplier handling several elements reduces the gaps between trades. As an one-stop furniture and building materials supplier, SANTERSON supplies outdoor furniture alongside the swim and hydrotherapy range, which lets a project team fix deck levels, finishes and clearances once instead of reconciling them between separate vendors.
A short documentation checklist
- Exact model code and confirmed option list, signed off against the quotation
- Catalogue dimensions next to the built opening and access clearances
- Equipment schedule marking included, optional and excluded items
- Confirmed supply and protection details for the ordered configuration
- Fill, drain and discharge routes
- Delivery, lifting and site access plan with responsibilities named
- Commissioning record and handover pack contents
- Warranty scope, exclusions and spares ordering route
None of these items are difficult. They are simply the questions a project runs into whether or not somebody wrote them down first. Send your configuration requirements to SANTERSON early enough that the answers land before the deck is poured, not after.