A hospitality wall that carries a television, minibar stock, luggage space and a place to display local art has to work hard. When that wall is specified as one product family rather than four separate purchases, the project team gains fewer trades to coordinate, one finish schedule to approve and one delivery window to protect. This guide walks through how buyers, procurement managers and fit-out contractors specify the Santerson Storage & Display Combo for hotels, serviced apartments and resort villas — from the room survey to the handover inspection.
What the Storage & Display Combo Actually Is
The Santerson Storage & Display Combo sits in the Media & TV Walls collection. It is a wall system that combines closed storage volumes with open display areas around a screen position, and it is built to project-specific dimensions rather than to a fixed catalogue size. Finish, layout and dimensions are specified for each space, so a guest room elevation and a suite living wall can share the same language while differing in proportion.
That configurability is the reason hospitality buyers shortlist it — and also the reason procurement has to be planned carefully. A made-to-measure system carries no spare stock on a shelf, so every dimension, material and hardware decision has to be locked before production starts. The same applies to the wider wall-system range: Santerson Full Height Media Walls, Santerson Open Display Niches and Santerson Mixed Open & Closed Storage are all specified per project.
Step 1: Fix the Scope Room by Room Before Asking for a Price
A request that says "media wall, hotel guest room" produces a quotation you cannot compare with anything. Build a room-by-room schedule first, and give each wall type a code that will follow it through drawings, production and delivery.
- Room type and count. Standard guest room, suite, serviced apartment, villa living room, lobby lounge. Quantities drive batch pricing and shipping consolidation.
- Elevation dimensions. Overall width and height, plus the position of structural columns, skirting, ceiling cornices and any existing service risers.
- Screen specification. Model or screen size range, mounting method, and whether the screen is recessed into the joinery or surface-mounted on a panel.
- Storage split. How much closed storage housekeeping needs versus how much open display the brand wants visible. In practice this ratio is the biggest cost variable.
- Appliance and minibar logic. Refrigeration position, ventilation clearance, door swing direction and whether appliances are supplied with the unit or by others.
Step 2: Decide the Lighting and Electrical Interface Early
Integrated lighting is where wall systems most often fail on site, because the joinery contractor, the electrician and the lighting supplier each assume someone else handled it. If your design includes LED strips in display niches or a backlit panel behind the screen — for example Santerson Backlit Feature Walls or Santerson Integrated LED Media Units — settle these items at design stage:
- Driver and transformer location, with access for maintenance rather than a sealed cavity.
- Switching arrangement: bedside master control, wall switch or both.
- Cable routes and back-box positions, drawn onto the joinery shop drawings rather than decided on site.
- Colour temperature and dimming method that match the rest of the room's lighting schedule.
- Venting for recessed appliances and any heat-generating equipment.
Confirm the electrical specification for each configuration. Product listings in this collection describe finish, layout and dimension options; they do not fix lighting or electrical details, and those must be agreed per project before production.
Step 3: Lock Finishes Against a Written Finish Schedule
Hospitality projects rarely order one finish. A typical package might pair a wood-look veneer carcass with a matte lacquer door and a stone or marble surface at the display ledge. Specify each element separately in the finish schedule so substitutions are visible rather than accidental.
| Element | What to specify | Why it matters on site |
|---|---|---|
| Carcass and panels | Substrate, surface material, colour reference, sheen level | Matches or deliberately contrasts with existing joinery in the same room |
| Doors and drawer fronts | Panel profile, handle or handleless detail, hinge type and soft-close | Determines wear resistance under daily guest use |
| Display ledges and shelves | Surface material, edge detail, load expectation | Visible surfaces set the perceived quality of the whole wall |
| Hardware | Hinge brand or grade, runner type, lock specification | Serviceable items should be replaceable without replacing the unit |
| Integrated lighting | Profile, colour temperature, dimming method, driver access | Prevents the joinery and electrical trades blocking each other |
Approve physical samples for every surface that will be seen at close range. A screen-rendered finish is not an approval document.
Step 4: Use Custom and OEM Capability Where the Brand Requires It
Where a brand standard dictates details — a logo inlay, a specific edge profile, a minibar layout that differs from the usual arrangement — custom manufacturing is normally the route rather than adaptation of a stock item. SANTERSON's Custom & OEM Service covers custom furniture design and prototyping, bespoke material finishes and textures, OEM production, flexible minimum order quantities and brand customisation such as engraving and logos. Confirm the available options, minimum order quantity and current capacity for your specific package before committing to a programme.
For a multi-room rollout, this is also the moment to decide whether the wall system is a prototype-first scope. One approved sample room, inspected against the finish schedule and the electrical specification, removes most of the argument later.
Step 5: Plan Batch Production, Packaging and Delivery
Because each unit is made to measure, production sequencing has to mirror site sequencing. Ask for a production plan that names which room numbers are in which batch, and match it to your installation programme rather than accepting one large delivery.
- Packaging standard. Room-number labelling on every crate, plus a packing list that matches the room schedule codes.
- Container loading plan. Panels and pre-assembled modules load differently; a clear plan reduces transit damage.
- Freight mode. Sea, air and rail freight forwarding with customs paperwork is part of the Logistics & Door-to-Door Delivery service. Agree Incoterms, duties and delivery scope for your destination in writing.
- Spare parts allowance. Order replacement doors, shelf panels and hardware with the main package rather than after handover, when the original batch reference is harder to trace.
Transit times, import duties and delivery terms vary by destination and should be confirmed case by case for each project — they are not fixed service levels that can be assumed from marketing material.
Step 6: Installation, Snags and Handover
A wall system only performs once it is level, anchored and connected. The Installation & After-sales Support service covers on-site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance. Whatever the support arrangement, keep your own acceptance process:
- Verify room-by-room dimensions against the approved shop drawings before fixing anything to the wall.
- Check alignment and gap consistency across adjacent units in the same corridor or floor — this is what guests notice first.
- Test every light circuit, dimmer and driver access point, and record which switch controls which fitting.
- Open and close every door and drawer under load, and confirm soft-close behaviour.
- Confirm anchoring to the substrate meets the local installation requirement for the building.
- Photograph the completed snag list and attach it to the handover file with the spare parts inventory.
Procurement Checklist for the Project File
- Room schedule with wall-type codes and quantities signed off by design and operations
- Approved elevation drawings for every wall type, including screen recess and service routes
- Written finish schedule with physical samples approved per surface
- Electrical and lighting specification, with driver access locations shown on drawings
- Appliance list showing who supplies, who installs and what clearance each item needs
- Production plan mapped to room numbers and site phasing
- Packaging and labelling standard confirmed in writing before despatch
- Incoterms, duties and delivery scope agreed for the destination
- Spare parts allowance ordered with the main package
- Sample room approved before batch production is released
How a One-Stop Supplier Reduces the Coordination Load
The reason hospitality teams specify wall systems from the same partner as their other built-in work is coordination cost. When cabinetry, vanities, doors and wall finishes come from one manufacturer, the finish schedule, the delivery windows and the snag process all stay in one conversation. As a one-stop furniture and building materials supplier, SANTERSON covers design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination through to installation and handover under its Turnkey Solutions service.
That scope suits projects where the wall system is one line in a larger package — guest room joinery, wardrobes, vanities, panelling and flooring specified together. It also means the same team handles the layout planning, furniture layouts, 3D visual renderings and production coordination described on the Interior Design Services page when drawings are needed.
Common Procurement Mistakes to Avoid
- Ordering before the screen is chosen. A recess sized for one model will not accept another; the panel detail changes with the mounting method.
- Treating open shelving as free design space. Every niche needs a dimension, a load expectation and a cleaning plan.
- Leaving lighting to site. Drivers need locations, circuits need schedules and access panels need to be drawn.
- No sample room. Batch production of made-to-measure units without one approved reference multiplies disputes.
- Skipping the spare parts order. Replacement fronts made years later rarely match the original batch exactly.
Getting a Quotation That Can Be Compared
Send the room schedule, the elevation drawings and the finish schedule together. A quotation built on that information states dimensions, materials, hardware grade, lighting scope, packaging standard and delivery terms — the six items you need in order to compare two suppliers honestly. A quotation built on a product name alone is cheaper on paper and more expensive on site.
Dimensions, materials, hardware, electrical options and finish availability for this collection are confirmed per project. Confirm them in writing for your selected configuration before production release.