Flush hinged doors look simple on a drawing: a full-height leaf, no visible frame, a hinge line that disappears into the wall. In practice they are one of the most specification-sensitive items in a villa or apartment fit-out, because almost everything that makes them work — opening geometry, sub-frame build, finish continuity with the surrounding wall — has to be settled before production starts. This guide explains how we specify Santerson Flush Hinged Doors, and where a different door type or a different supplier is the better answer.
What you are actually specifying
Our flush hinged doors sit in the Hinged Doors collection, together with Classic Panel Hinged Doors and Santerson Wood Veneer Hinged Doors. Each is made to measure, with material and finish options selected per project, and the layout adjusted to the opening rather than the other way round. That made-to-measure approach is the reason a flush door can read as part of the wall — and the reason it fails visibly when the dimensions or the site preparation are wrong.
Two things follow from this. First, we do not publish a fixed size range or a single construction build for these doors; the specification is written around your drawings, and every dimension and finish has to be confirmed against the specific order. Second, comparison between suppliers is only meaningful once the same information is on the table: opening sizes, hinge side and swing direction, floor-covering thickness at the threshold, wall build-up, and the finish the door is meant to disappear into.
A practical evaluation checklist
Use these six points to compare quotations from us or from anyone else. If a supplier cannot answer all six in writing, the risk sits with them.
- Opening survey and who signs it. Flush doors depend on wall build-up and floor levels. Ask whether measurements come from your drawings or from a site survey, and which party is responsible for the recorded opening sizes.
- Sub-frame and wall interface. The leaf only sits flush if the supporting frame and the surrounding wall are built to match. Get the interface detail — fixing method, tolerance allowance, and what the site contractor must complete before delivery.
- Swing, clearance and floor build-up. Swing direction, hinge position and the gap over the finished floor covering need to be fixed before production. Carpet, tile or timber thickness changes the required undercut.
- Finish continuity. State whether the leaf is to match painted wall, Wood Veneer Panels, lacquer, laminate or another surface, and confirm how that finish is sampled and approved.
- Ironmongery assumptions. Concealed hinges, magnets and handles are usually quoted separately. Compare like for like, including load rating against the leaf size you have specified.
- Variation handling. Ask what happens if an opening changes after production has started — lead time, cost basis, and who re-makes the affected leaves.
Where alternatives make more sense
A flush hinged door is not always the right answer. Below are the options we hold in the same catalogue, and the situations where each one is the better specification.
| If the design calls for | Catalogue option to compare | Why it fits |
|---|---|---|
| A door that reads as plain wall with no leaf line at all | Flush Wall Aligned Doors, Santerson Decorative Concealed Doors | Concealed-door construction is built to be finished over and aligned with the wall surface, so the leaf line is not the design feature. |
| No visible handle or hardware | Santerson Handleless Concealed Doors | Handleless detailing is specified as part of the leaf and opening arrangement, not added on site. |
| An opening that must slide rather than swing | Santerson Flush Sliding Doors | Where swing clearance is unavailable, sliding geometry solves the problem that a hinged leaf cannot. |
| A conventional framed internal door at a lower specification load | Standard Interior Hinged Doors, Santerson Decorative Interior Doors | Same made-to-measure basis, simpler interface with the wall, and less site coordination. |
| Doors that continue a paneled wall across a whole room | Integrated Door & Paneling | The door and the paneling are specified as one system, so joint setting and finish are handled in one production package. |
Comparing suppliers rather than only comparing doors
Most problems with flush doors are coordination problems, not product problems. The door arrives correct and the wall was never prepared for it. That is why we position these doors inside a wider fit-out package: Custom & OEM Service covers bespoke material, finish and texture choices with prototyping before batch production, and Turnkey Interior Project Solutions covers the sequence around them — design and planning, production, logistics, installation and after-sales — so doors, paneling, joinery and flooring are produced against one set of approved details.
For buyers sourcing from overseas, also compare what happens between the factory gate and the site. Our logistics scope covers freight forwarding, export paperwork, packing and container loading, shipment tracking and door-to-door delivery. Import terms, duties and transit arrangements are confirmed case by case for each destination, so ask any supplier to put those items in writing rather than assuming them.
A useful test when you compare us with a specialist door maker: ask how many other trades in the same project they supply. A dedicated door factory may offer deeper hardware engineering; a fit-out supplier reduces the number of interfaces you have to police. For a villa or apartment package where doors, paneling, cabinetry and finishes all have to match, fewer interfaces is usually worth more than one extra technical option.
Next step
Send us the door schedule or the room drawings and we will return a specification for review — leaf layout, swing arrangement, finish proposal and a production plan built around your programme. If you are still deciding between hinged, concealed and sliding solutions, tell us the opening and the design intent, and we will recommend which of the options above suits it.
SANTERSON — China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, operating since 2008.
Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com · Enquiries: Contact Us