A ten-metre swim spa is not an off-the-shelf purchase. The Outdoor Swim Spa WS-S10-T is a long hydrotherapy and swim-training unit that buyers typically specify rather than simply order — and that is exactly where OEM sourcing makes sense. Below is how the process runs at SANTERSON, what we need from you, and which details to lock down before anything goes into production.
What OEM Sourcing Actually Covers
OEM work means your company's requirements shape the product that leaves our line: your brand marking on the cabinet and control panel, your material and finish choices, your accessory set, your packaging. Our Custom & OEM Service covers custom design and prototyping, bespoke finishes and textures, manufacturing to your drawings, flexible minimum order quantities and private labelling such as engraving, logos and branded packaging.
For a swim spa there are two distinct versions of this conversation, and mixing them up causes most project delays:
- One project, one unit — a villa owner or small hotel wants the WS-S10-T fitted to a specific terrace. Here "custom" means configuration: which jets, heat pump, filtration route, steps, insulation and control package are included in the delivered set.
- Repeating supply under your brand — a dealer, landscape contractor or resort group resells units with their own name on them. Here OEM adds branding, packaging and a stable specification you can quote repeatedly.
Both start from the same base model, so the technical review is identical. The difference is what gets documented and how many units follow.
The Base Specification You Are Starting From
These are the catalogue figures for WS-S10-T. Treat them as the starting point of a specification discussion, not a fixed delivery list — equipment and electrical requirements depend on the configuration you confirm.
| Catalogue dimensions | 10000 × 2200 × 1420 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump | 2 pcs |
| Filter pump | 1 pc |
| Jet total | 76 pcs |
| LED lighting | 1 main light plus 40 small LED lights |
| Total power | 7.65 kW |
| Features shown | Water jets, LED lighting, ozone, swim training system |
Catalogue-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option is confirmed against the specific unit rather than assumed.
How a WS-S10-T OEM Order Moves
Our project workflow runs through six stages — consultation, design and planning, production, logistics, installation and after-sales. Applied to a single swim spa or a branded batch, it looks like this.
1. Consultation: site conditions before product choices
A 10 m shell needs answers before the option list means anything. Where does it sit — on a finished deck, a plinth, or partly recessed? What is the slab or frame carrying it rated for when full? What supply and protection is available at the plant room, given the catalogue total power of 7.65 kW? Send drawings, photographs and your electrical situation, and we will tell you which configuration actually fits rather than quoting a spec sheet back at you.
2. Design and planning: configuration and branding on paper
We produce the specification sheet for the exact unit or batch: cabinet finish, jet layout within the 76-jet total, filtration route, heat pump sizing, insulation level, steps, control interface, and where your logo appears. For branded repeat supply this is also where we agree packaging and labelling. Nothing enters production on a verbal description.
3. Production: prototyping, then the run
Our custom service includes 3D modelling and prototyping before series work, with material options spanning metals, engineered surfaces and laminates where they apply to cabinets and surrounds. For a single project unit, production follows the confirmed configuration; for an OEM programme, we hold an approved sample specification so later batches match what you quoted your own customers.
4. Logistics: getting a 10 m shell to site
Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, packaging and container loading planning, shipment tracking, customs paperwork such as commercial invoices, packing lists and certificates of origin. A unit of this length raises real questions about how it ships — one shell or sectional delivery, which port, which final-leg route — so we settle the transport method with you before production rather than after.
5. Installation and handover
Our service scope includes on-site installation support, inspection with snag lists, spare parts and ongoing maintenance. For a swim spa the practical handover items are commissioning the pumps, filtration and ozone system, verifying controls and lighting, recording the as-delivered configuration, and agreeing access for future servicing.
What to Have Ready Before You Enquire
Buyers who bring most of these items usually get a usable quotation on the first pass:
- Site plan or deck drawing with access routes and the intended orientation of the swim channel.
- Structural information for the supporting surface, including a full-water load check by your engineer.
- Electrical supply details at the plant room: phase, available capacity, protection and routing.
- The option list you want — heat pump, UV sterilisation, sand filtration, insulation, steps, control package.
- Branding requirements if this is OEM resale: logo artwork, placement, packaging expectations, annual volume estimate.
- Destination and preferred Incoterms, so the freight question is answered in the same quotation.
Common Questions from Dealers and Project Buyers
Can the WS-S10-T be shortened or lengthened for our site?
The 10000 × 2200 × 1420 mm figure is the catalogue size. Where a different footprint is required, we look at other models in the swim and hydrotherapy range first — including the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool — and only then discuss a bespoke shell, since changing length changes jet layout, pump duty and swim-training performance.
Can we put our own brand on the units?
Yes. Brand customisation, engraving, logos and packaging fall under the custom and OEM service. Send artwork early, because placement on cabinet and control panel affects production files.
Do you supply the heat pump and water treatment as part of the package?
Heat pumps, UV sterilisation and sand filtration appear as catalogue options. Which ones are included depends on your climate, usage pattern and local electrical conditions, so we specify them with you instead of bundling a fixed kit.
Why Source the Whole Envelope From One Manufacturer
A swim spa rarely arrives alone. Poolside projects usually also need loungers, shade structures and adjacent outdoor living furniture, and villas or resorts typically carry cabinetry, flooring, wall finishes and lighting from the same fit-out. As a one-stop furniture and building materials supplier operating since 2008, we produce across those categories — outdoor collections, bathroom ceramics, lighting, aluminium ceilings and cladding, wall panels, engineered flooring, stainless steel screens and custom cabinetry — so a project can coordinate finishes, deliveries and responsibility with a single counterparty instead of a dozen separate suppliers.
If your project pairs a swim spa with the terrace around it, start with the WS-S10-T product page, send us the site and electrical information above, and we will come back with a configuration you can price and schedule.