A wardrobe quote that looks complete on the page can still leave three or four costly decisions open. Before you sign a purchase order for Two Tone Hinged Wardrobes, walk through the eleven line items below and make sure each one is written down, priced and dated. Anything described in words rather than numbers is where variation orders come from later.

1. The scope line: what exactly is being quoted

Start with the unit of measure. A two tone hinged wardrobe can be quoted per linear metre, per square metre of elevation, or per assembled module, and the three produce very different totals on the same drawing. Check that the quote states which one it uses, and that the quantity matches the room-by-room schedule you sent rather than a rounded figure.

Then confirm what sits inside the quoted scope. Our quotations list the carcass, doors, back panels and standard internal fittings as included, and call out anything else separately, so you can see at a glance whether plinth, top filler, skirting cuts and scribe strips are in or out.

2. Dimensions: overall size plus the tolerances around it

A made-to-measure quote should give you height, width and depth for every unit, not a single "as per drawing" note. Two details matter more than the rest:

  • Floor and ceiling levels. State whether the quoted height assumes a level floor, and who supplies the packing or scribing if it is not.
  • Obstructions. Air-conditioning lines, downlights, skirting, door swings and architraves should appear on the dimensioned sketch that accompanies the quote.

Ask for a shop drawing with overall dimensions and clearance zones before production is scheduled. If your site measurement was taken by your team, ask whether the quoted size allows any installation tolerance and how much.

3. Door specification, because hinged doors carry the look

Hinged wardrobes live or die on door quality, so the quote should describe the door in full:

  • Door construction and core, and whether the two tone effect is achieved with two finishes on one panel or two separate panels.
  • Hinge type, brand grade and whether soft close is standard or an upcharge.
  • Maximum door width and height the hinges are rated for, and the number of hinges per door.
  • Handle or profile specification, including finish reference and whether handles are quoted per door or per linear metre.

Where doors meet a corner or an adjacent wall, ask how the reveal is handled. A quote that says "corner detail TBC" will become a variation later.

4. Finish names, not finish ideas

"Two tone grey and oak" means nothing on a purchase order. The quote should carry the exact board or lacquer reference for each of the two tones, the sheen level, and whether edges, internal faces and door reverses are matched, contrasted or left neutral. Ask these specific questions:

  • Which side is which tone on each elevation, shown on the drawing?
  • Is the finish lacquer, laminate, veneer or foil, and does the quoted price change between them?
  • Are edge banding and edge profile included at the same colour reference?
  • Is a physical finish sample being supplied before production, and is it charged?

5. Internal layout and fittings

The internal plan is usually where quotes go thin. Confirm the number and depth of shelves, hanging rail positions and lengths, drawer count and runner type, and any dedicated zones such as shoe shelving, trouser racks or a mirrored inside panel. Ask whether adjustable shelves are standard, and what an additional shelf or drawer costs if you add it after the order is placed.

6. Substitutes: what happens when a material is unavailable

Ask the supplier to state, in writing, which components may be substituted and at what standard. A good quote names an approved alternative for boards, hardware and glass, and confirms that any substitution needs your sign-off before it goes into production. This single clause prevents a finish swap arriving on site with the delivery.

7. Packaging, freight and Incoterms

If the wardrobes are being shipped internationally, the quote must state the Incoterm, not just "freight included". For built-in joinery we ship flat-packed panels with labelled cartons and corner protection, and the paperwork side — commercial invoice, packing list and any origin documents — should be listed as included so nothing is billed at the port. Confirm:

  • Packaging standard and carton marking against the shop drawing numbers.
  • Who arranges inland delivery at destination, and whether the delivery address is a kerbside or room-of-choice drop.
  • Whether cargo insurance is included or offered as an option, and who files a claim if panels arrive damaged.

8. Lead time: production only, or door to door

Ask for the lead time in two numbers — factory production after drawing approval, and total transit to your delivery address. A single figure that quietly combines them is how a six-week quote becomes a twelve-week arrival. The quote should also state when the clock starts: on deposit, or on approved shop drawings.

9. Installation and site readiness

Decide now who installs. If the supplier is doing it, the quote should cover site preparation requirements, fixing method to your wall type, and the snag and handover process. If your own trades are installing, ask for the assembly sequence, fixing details and clearance requirements in the technical pack, and confirm that self-install does not void the warranty terms.

10. Commercial terms

ItemWhat a clear quote states
Price validityHow long the price holds, and what triggers re-pricing
Payment scheduleDeposit percentage, balance trigger, and what is released at each stage
Change ordersThe cut-off date for layout changes before production, and how changes are priced
WarrantyDuration, what is covered, who handles claims locally
Spare partsWhether replacement hinges, shelves and panels can be reordered later
ExclusionsSite works, electrical, making good, taxes and duties

11. Documentation pack

Finally, check that the quote references the documents that will follow: approved shop drawings, a material and finish schedule, hardware specification, and a packing list keyed to drawing numbers. For project work these files also support your own client approvals and any inspection on site.

Quote review checklist

  • Unit of measure and quantities match the room schedule
  • Dimensioned shop drawing issued before production starts
  • Hinge grade, door size limits and soft-close status named
  • Exact finish references for both tones, plus edges and reverses
  • Internal layout itemised with shelf and drawer counts
  • Approved substitutes listed, with sign-off required before swap
  • Incoterm, packaging standard and insurance position stated
  • Production lead time and transit time quoted separately
  • Installation responsibility and site prep written down
  • Change-order cut-off date and pricing method agreed

How a one-stop supplier changes the review

When wardrobes are bought alongside other joinery and finishes for the same project, the quote review gets shorter if the supplier consolidates. A single technical pack covering built-in furniture, cabinetry and matching panels means one drawing set, one finish schedule and one delivery window instead of four vendors reconciling each other. That is how we work on villa and hospitality projects: design coordination, production, freight and after-sales handled by one team, with custom and OEM service available when a project needs a non-standard size, layout or finish combination.

If you are comparing suppliers for a wardrobe package, send the same room drawing to each and ask them to price against this list. Quotes that answer all eleven sections line up cleanly side by side; quotes that skip two or three will look cheaper until the variation orders arrive.