A clear glass aluminum frame wardrobe looks simple on a rendering and complicated on site. The aluminium profile, the glass, the interior fittings and the opening mechanism all have to agree with each other before the unit is cut, glazed and shipped. That is why the submittal pack matters more for this product than for an ordinary panel-door wardrobe: once the frame is fabricated, corrections are expensive and slow. If you are specifying clear glass aluminum frame wardrobes for a villa, apartment or hospitality room package, the pack below is what a consultant, contractor and factory all need in order to sign off on the same wardrobe.

1. Drawings that carry real dimensions, not mood

Start with elevations for every unit, drawn to scale, one per room or per wall run. A submittal drawing for a glass-and-aluminium wardrobe should show overall height, width and depth; the vertical and horizontal division of the frame; door widths and the number of leaves; and the position of any fixed panel next to an opening leaf. Section drawings matter as much as elevations here, because the aluminium profile is a built-up assembly: the drawing should indicate the frame depth, how the glass sits in the channel, and whether the unit is floor-mounted, wall-hung or fitted between finished surfaces.

Include reflected ceiling and finish notes where the wardrobe reaches a ceiling line. Made-to-measure wardrobes are usually set out from the completed finishes, so the drawing has to state which levels are structural and which are finished, and the tolerance band that the frame will absorb. Where a unit returns around a corner or meets wall panelling, show the junction detail.

2. Frame specification in profile terms

"Aluminium frame" is not a specification. The submittal should name the profile series or provide the profile drawing, the surface treatment (anodised, powder-coated or wood-effect finish), and the colour reference from an actual sample rather than a screen value. State the visible face width of the profile, because that dimension drives the whole grid appearance on a clear glass door.

Then record how the frame behaves mechanically: corner joint method, the hardware set for hinged, sliding or folding operation, soft-close or damper provisions, and the load rating where drawers or trouser rails hang from the frame. For projects in coastal or humid climates, ask which surface treatment is offered for those conditions and get it written into the pack.

3. Glass schedule and safety construction

Clear glass is the most demanding glazing choice in a wardrobe because every fingerprint, cut edge and frame shadow shows through it. The submittal must list, door by door: glass thickness, whether the pane is tempered or laminated, edge treatment (polished, ground or seamed), and any printed, frosted or tinted band. Where a project authority requires safety glazing in specific locations, note the marking standard the factory will apply on the pane itself.

Also state the maximum pane size the factory will glaze in one piece, and where joints are unavoidable. Ask for the glass-to-frame setting detail: gasket or bead, spacer thickness, and whether the pane is retained on all four edges. These details decide whether a clear pane reads crisp or wavy once installed.

4. Interior layout and fittings

Glass doors reveal the interior completely, so the inside of the wardrobe is part of the appearance specification, not just storage planning. The pack should include an interior elevation for each unit showing hanging rails, shelf heights, drawer banks, and any integrated lighting or mirror panel, with the material and edge banding of every carcass panel stated. Confirm which fittings are supplied by the wardrobe factory and which come from another supplier.

Where a project mixes wardrobe types, cross-reference them in one schedule. Our catalogue keeps related systems on separate pages for exactly that reason — frosted glass aluminum frame wardrobes and smoked glass aluminum frame wardrobes are commonly substituted for clear glass in bedrooms where a fully transparent interior is unwanted, and the substitution should be recorded in the schedule rather than decided on site.

5. Materials, finishes and sample evidence

Aim for one physical sample board covering every visible surface: aluminium profile offcut in the specified finish, glass offcut in the specified construction with the edge exposed, and a carcass panel sample with its edge band. Sample references on the drawings should match the labels on the board. For bespoke projects, request the sample stage before fabrication — SANTERSON's custom and OEM service covers design and prototyping, material and finish selection, and branding options, so prototype review is part of the normal route rather than an exception.

Practical rule: if a detail cannot be drawn, it has not been specified. Frame-to-glass, frame-to-wall and frame-to-floor junctions should each appear somewhere in the pack.

6. Manufacturing, tolerance and quality records

Ask for the fabrication tolerances you will inspect against: allowable deviation on overall width and height, squareness of each frame, level of shelves, and the gap tolerance between adjacent door leaves. Request the inspection record that accompanies shipment — packing list keyed to unit numbers on the drawings, plus photographs of glazed units before crating. For multi-room packages, unit numbering on the drawings must be identical to the carton marking.

7. Logistics and installation information

Glazed frames travel badly when they are packed flat and stacked. The submittal should state whether units ship assembled or knocked-down, how glazed leaves are crated (vertical A-frame, edge protection, interleave), and the container loading sequence for a multi-unit order. SANTERSON handles freight forwarding, customs documentation and door-to-door delivery as part of its project service, with installation support and snag inspection after arrival; the pack should say which of these apply to your order and what site conditions are required before installers begin — completed wet trades, finished floor levels, and confirmed wall alignment.

8. What the sign-off sheet should record

ItemEvidence to attach
DimensionsScaled elevations and sections per unit, with finished-level notes
FrameProfile drawing, finish reference, hardware schedule
GlassPer-door glass schedule, safety marking note, maximum pane size
InteriorInterior elevations, panel material and edge banding, fittings responsibility
FinishesSigned sample board with matching references
TolerancesWritten fabrication and installation tolerances, inspection record
DeliveryPacking method, unit numbering, site readiness checklist

Common gaps we see in incomplete packs

  • Elevations without sections, so the frame depth and glazing channel are never reviewed.
  • Glass thickness agreed but edge treatment and maximum pane size left open.
  • Colour approved from a photograph instead of a physical profile sample.
  • Interior layout drawn in one room only and repeated by assumption across the package.
  • No unit numbering, which makes delivery inspection impossible to reconcile with the drawings.

Before you send the pack for approval

  • Every wardrobe in the room schedule appears on a drawing and in the glass schedule.
  • Frame finish, glass construction and carcass panel are each tied to a signed sample.
  • Clear, frosted and smoked glazing variants are listed separately where they differ by room.
  • Tolerances, packing method and installation prerequisites are written down, not assumed.

SANTERSON has manufactured furniture and building materials for project clients since 2008, with made-to-measure sizing, material and finish options, and layouts tailored to each project. Send us your room schedule and we will return the drawings, glass schedule and sample board described above for review before fabrication begins.