A matte sliding door wardrobe rarely fails on appearance. It fails on the numbers behind it: how many sets per room type, which wall each leaf travels along, what the track sits on, and which other joinery items share the same material and edge banding. For villa and apartment packages, that planning work happens before a single panel is cut. The following method covers quantity take-off, product coordination and the sequencing we use when a project combines matte sliding door wardrobes with cabinetry, wall panelling, doors and bathroom fixtures.

Start With a Room-by-Room Quantity Schedule, Not a Wardrobe Count

A total number of wardrobes is not a usable procurement figure. Two identical-looking openings can need different carcass depths, leaf counts and internal layouts depending on ceiling height, skirting, adjacent doors and the furniture already fixed to the wall. Build one line per opening in a spreadsheet, and keep it as the single reference for quotations, production drawings and packing lists.

For each wardrobe opening, record the finished width and height at three points across the span, the finished floor level, the depth available after the door track and handle projection, plus obstructions such as air-conditioning lines, skirting boards, cornices, downlights in the ceiling and switch plates. Note which face the leaf must travel towards, because a leaf that overlaps a light switch or blocks a bedside lamp is a site problem nobody can fix with packing.

Data fieldWhy it changes the order
Clear opening width and height at three measurement pointsDetermines leaf count, panel size and whether out-of-plumb walls need scribing or packing on site.
Net depth after track and handleHanging space needs depth for the door assembly itself, so carcass depth is not the same as room depth.
Ceiling type and deflection allowanceSuspended or plasterboard ceilings need a defined bearing point for any top track or head rail.
Skirting, cornice and architrave linesDetermines whether the carcass is scribed to the wall or the lining covers the gap.
Adjacent door swing and furniture layoutSets the leaf travel direction and the overlap on the return panel.
Room type and occupant profileGuest rooms, master bedrooms and staff quarters justify different internal splits for the same external finish.
Finish code and glass or mirror optionKeeps one matte tone across all units instead of a near-match in a second production batch.

Where the same layout repeats across floors, count the variants rather than the rooms. A development with eight identical bedrooms and four larger master bedrooms is two wardrobe types repeated twelve times, not twelve one-off designs. Grouping by type is what makes a quantity schedule hold together once site dimensions start to move.

Turn Measurements Into Quantities

Once the openings are measured, convert them into order quantities in three steps.

1. Fix the module grid before counting panels

Sliding leaves look like a simple division of opening width by leaf width, but panel size is limited by the hardware span, the handle position and how much overlap two leaves need to close the gap. A wider leaf can reduce the number of vertical joints yet make daily use awkward in a narrow passage. Decide the module grid for each type first, then count panels from that grid.

2. Split the internal layout by room type

The external finish can stay uniform while the inside differs. Long-hang sections suit bedroom wardrobes; shallow shelf runs and drawer banks suit guest rooms; a linen or utility store needs different heights again. Where a project already uses drawer focused modular wardrobes in one wing, keep the drawer bank height consistent across wings so hardware and installers work to one dimension.

3. Add spares and site allowances deliberately

Order replacement leaves, tracks, guides and handles as a defined line in the schedule rather than an assumption. Site damage during painting and flooring trades is common, and a matching matte leaf ordered months later is a second production run with its own colour risk. Agree the spares quantity with the client before production, and state clearly which items are covered by installation and after-sales support and which fall to site.

Coordination Checklist: What Has to Match the Wardrobe Face

Matte surfaces show every mismatch in tone, sheen and edge detail. Coordinate them against the other elements a buyer sees in the same sightline.

  • Flooring and threshold. A bottom track needs a finished floor level that does not move after installation. Engineered timber and carpet have different compressible depths, so confirm the threshold detail before the carcass is fixed.
  • Wall panelling and linings. Where wardrobes sit beside custom niche paneling, decide which element butts into which, and keep the reveal consistent on both sides of the opening.
  • Interior doors. A wardrobe leaf and a nearby room door read as one composition when their heights, shadow gaps and handle heights align. Where the design calls for concealed detailing, flush wall aligned doors set the reference line for everything next to them.
  • Kitchen and laundry joinery. Where wardrobes, custom built-in kitchen cabinets and tall storage share a material or edge profile, place them on one material code and one production batch wherever possible.
  • Lighting. Recessed downlights must not sit where the carcass head rail runs. Interior wardrobe lighting needs a cable route decided before panels are machined.
  • Bathrooms behind the same wall. Wet areas sharing a wall with wardrobes need the waterproofing set-out and any single vanity waste positions confirmed before carcass fixings are located.

Sequencing the Order So Quantities Survive Construction

Quantity planning only holds if the site reaches the assumed condition when joinery arrives. Our cooperation steps follow a simple sequence: project brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up.

  • Confirm finishes, hardware and internal layouts on drawings signed by the designer or builder.
  • Re-measure openings after flooring, plastering and painting are complete, and reconcile the second set of dimensions against the schedule.
  • Release production only on reconciled dimensions; treat any change after that point as a variation with its own lead-time consequence.
  • Group shipments by installation phase so wardrobes for occupied floors do not arrive before the trades preparing those rooms are finished, using logistics and door-to-door delivery planned around site access rather than factory convenience.
  • Inspect on handover: leaf alignment, track operation, edge banding, and any snag list agreed with the site team before sign-off.

Practical rule: if a quantity schedule cannot be read by an installer without asking a design question, it is not finished. Every line should state type, dimensions, finish code, hardware set and installation phase.

How Custom Manufacturing Supports the Schedule

Project wardrobe quantities rarely match catalogue modules exactly, especially where ceiling heights vary between floors or where an older villa has out-of-square openings. Through custom and OEM service, sizing, material and finish are specified per project, and the same drawings that fix quantities also drive prototyping and production coordination. As a China-based furniture and building materials manufacturer working on villa and hospitality packages, we produce wardrobe joinery alongside the cabinetry, panelling, doors and fixtures that surround it, which removes the risk of three suppliers interpreting one finish specification in three different ways.

For projects still weighing options, glass sliding door wardrobes and mirror sliding door wardrobes sit in the same collection and can be mixed by room type while keeping one track and hardware family. Send us your room schedule and finish selections, and we will return a quantity-checked proposal with the coordination details marked up.