Open wardrobes with a metal frame look simple on a rendering, which is exactly why they get specified too late and too vaguely. A frame, a few shelves, a hanging rail and some panels sound easy to price — until the site reveals an uneven slab, a ceiling that is not level, or a joinery trade that has never assembled this type of carcass before. The details below are the ones we see change both the quotation and the delivery plan on residential and villa projects, written from the point of view of buyers, contractors and project managers who have to sign off the drawings.
Start with the opening, not the wardrobe
Metal frame open wardrobes are usually built into an alcove, a recess or a full-height wall bay. Before any finish decision, three site numbers decide what can actually be manufactured: the finished floor level, the finished ceiling or soffit height, and the depth of the recess once wall finishes are on. A run that is quoted on structural dimensions rather than finished dimensions is the most common cause of rework, because tile, plasterboard, skirting and reveal trims consume centimetres that nobody budgeted for.
Send us a set of as-built or near-final drawings with those levels marked, together with wall and floor finish schedules. If the room is still at slab stage, say so in the enquiry — we will flag which dimensions have to be re-surveyed before production starts, instead of guessing on your behalf.
Frame profile, span and what sits above
The frame carries everything else, so its specification follows from the span and the load. A bay that runs shelf-to-shelf over a long unsupported width behaves differently from one broken up by vertical standards, and hanging rails concentrate load at two points rather than spreading it. Tell us the clear span of each bay, whether the top of the unit is open or capped, and whether anything heavy — a safe, boxes of linens, a stored suitcase — is expected on the upper shelves.
Where the ceiling above the run is plasterboard rather than slab, fixings have to be located and detailed accordingly. That detail belongs in the shop drawings, not in an on-site improvisation.
Shelf and hanging layout for the actual user
Layout is a habit question more than a style question. Walk-in arrangements, drawer-heavy arrangements and shelf-focused arrangements each suit different wardrobes, and an open metal frame makes those choices visible every day, so poor proportions are impossible to hide behind a door. For metal frame open wardrobes, we ask each project for the garment mix: long hanging, short hanging, folded stacks, bags, laundry. That single list drives rail heights, shelf pitches and whether drawers or baskets belong in the plan.
If a room needs storage that reads as architecture rather than furniture, pair the open run with closed joinery elsewhere in the same scheme — combination modular wardrobes let solid doors absorb the clutter while the metal frame carries the display side. Where a bedroom needs a lighter, softer look, minimalist open wardrobes share the same made-to-measure approach with slimmer profiles.
Finish, and how it meets the rest of the room
Frame colour and panel material have to be agreed against what is already fixed in the room: flooring, door joinery, skirting and any matching cabinetry. A metal frame specified in isolation tends to clash with the nearest timber element, because the two samples were approved by different people on different days. Approve the frame finish together with the panel board and edge treatment in one sign-off sheet.
Our open wardrobe range is made to measure, so sizing, layout and finish are set per project rather than chosen from a fixed size grid. That flexibility only pays off when the specification is complete at order stage; late changes to depth or rail height after drawings are signed are where cost appears.
Interface with other trades
An open wardrobe sits at the crossing point of several trades, and the handover sequence has to be written into the programme:
- Flooring first or last. A run that lands on finished flooring needs a different base detail from one installed before the floor is laid.
- Lighting. Recessed shelf lights need cable routes and driver access decided before panels are fixed.
- Skirting and architrave. Decide whether the frame interrupts them or terminates against them.
- Air conditioning and sprinklers. Grilles, diffusers and heads must not fall inside the shelf zone.
What to send with your enquiry
| Information | Why it changes the outcome |
|---|---|
| Room drawings with finished levels and recess depths | Sets manufacturable height, width and depth; avoids on-site trimming |
| Garment and storage mix per bay | Determines rail heights, shelf pitch and drawer or basket positions |
| Finish schedule for frame, panels and edges | Keeps the run consistent with flooring and joinery already approved |
| Fixing background (slab, timber frame, plasterboard) | Drives the fixing detail and any additional blocking |
| Trade sequence for flooring, lighting and skirting | Prevents clashes during installation on site |
| Delivery address and access notes | Long panels need lift, stair or door clearances checked in advance |
Every project is confirmed against its own drawings before production. Dimensions, finishes and selected specifications should be verified with our team for each order; the layout above is a specification checklist, not a standard size range.
How we support the order
SANTERSON has been manufacturing furniture and building materials since 2008, and open wardrobe runs are usually ordered alongside other fit-out items on the same project — cabinetry, doors, wall panelling, flooring. Coordinating them through one supplier keeps finishes matched and reduces the number of separate deliveries landing on site. Our services cover design coordination, custom and OEM production, door-to-door logistics, installation guidance and after-sales support, so a wardrobe specification can follow the same workflow as the rest of the package rather than being handled as an isolated purchase.
Planning an open wardrobe run? Send your drawings, finished levels and garment mix to our project team, and we will return a specification review with the dimensions and details that need confirming before production.