An L shaped corner wardrobe is one of the easiest built-in items to get wrong, because the price you see on a quotation is rarely the price of the installed result. The information below lists what procurement teams should put in writing before an order is released, using our own made-to-measure corner wardrobe programme as the working example.
Why Corner Wardrobes Create More Paperwork Than Straight Runs
A straight wardrobe run has one front elevation and one return. An L shaped unit has two runs meeting at an angle, and every decision made for one leg affects the other: carcass depth, door swing or sliding track, skirting clearance, ceiling level, and where the corner itself becomes usable storage rather than dead space. In villa and apartment packages this matters more than it looks on a drawing, because the same joinery detail has to repeat across several bedroom types without each room turning into a one-off.
As a furniture and building materials manufacturer we produce built-in ranges to project dimensions, and the corner wardrobe collection covers L shaped, U shaped, hinged door, sliding door, open and glass configurations. That flexibility is exactly why the documentation has to be specific: finish, layout and sizing are all specified per project, so an order that only says "corner wardrobe" cannot be produced, priced consistently or inspected on site.
1. The Dimension Record
Record dimensions from the actual finished space, not from the architectural slab plan. For each L shaped unit we need, and recommend you also keep internally:
- Both leg lengths measured to the finished wall face, plus the included angle at the corner.
- Carcass height against the finished ceiling level, including any cornice, shadow gap or scribe detail.
- Depth of each leg, and whether one leg steps in to clear a door opening, radiator, switch or wardrobe light fitting.
- Floor finish build-up and skirting treatment, because a unit that butts to existing skirting needs a cut-out that has to be shown on the drawing.
- Position of any services that cannot be moved: power points, air-conditioning returns, downlights above the unit.
Where wall lengths differ between units of the same bedroom type, list each variation with its room or unit number. A single "typical" dimension applied across a villa or apartment block is the most common source of site rework on corner joinery.
2. The Layout and Internal Fitting Schedule
The corner itself decides how much of the unit works. Note which side carries hanging, which carries shelving or drawers, and what happens in the corner bay — a shelf break, a rotating or pull-out fitting, or an open display niche. For bedroom fit-outs we often pair the corner unit with L shaped walk in wardrobes when the room allows a dressing zone, and with open or glass corner variants where display storage is part of the design intent.
What to record for each unit:
- Hanging lengths and heights: short hanging, long hanging, double hang, and whether any rail is lowered or pull-down.
- Shelf spans and drawer bank positions, with the room number they belong to.
- Lighting: internal cabinet lighting, sensor type, and where the transformer or driver is accessible for maintenance.
- Any integrated item — ironing board, hamper, safe shelf, vanity end — that has its own clearance requirement.
3. Materials, Finishes and Edging
Specify the substrate, the surface material, the colour or grain reference, and the edge treatment for every visible component, including doors, carcass edges, shelves and interior boxes. Two samples that match on a door can mismatch once one is cut to size and edged. The finishes we supply across wardrobe ranges include melamine, lacquer, acrylic, wood veneer and glass fronts in aluminium frames, and each has its own tolerance for grain direction and sheen.
In the document, capture:
- A signed physical finish sample reference, with date and supplier batch where available.
- Grain direction rules on doors and returns, especially on wood veneer in an L configuration.
- Glass specification where used: clear, bronze, smoked, frosted or ribbed, plus the frame colour.
- Edge banding thickness and colour on cut-to-size parts, since these are produced later than the doors.
4. Hardware and Door Mechanics
An L shaped unit is where door mechanics fail most visibly. Hinged doors need clearance from the return leg and from any handle; sliding doors need track length, overlap and a clear run that nothing interrupts at the corner. Document the hardware brand and model, load rating, hinge count per door, soft-close provision, and the track or rail detail at the junction. Record who supplies the hardware — us or your local fit-out contractor — because split supply is where responsibility for adjustment becomes unclear.
5. Interfaces With Walls, Ceiling and Floor
Built-in wardrobes are only as good as the substrate they meet. Add a short interface section to your document covering plaster tolerance, ceiling level variation, skirting, floor thresholds and any wall finish that continues into the unit. If the walls are not straight — common in refurbished villas — state whether scribing is done in the factory or on site, and who carries the allowance for it.
6. Tolerances, Inspection Points and Snag Criteria
Agree the acceptance criteria before production starts rather than at handover. A practical set of inspection points:
| Stage | What is checked | Evidence kept on file |
|---|---|---|
| Pre-production | Final shop drawings signed against site-measured dimensions; finish samples approved | Drawing revision number, sample sign-off sheet |
| Factory | Panel sizes, edge banding, door alignment on a dry assembly, hardware packing list | Packing list per room or unit number, inspection photographs |
| Delivery | Pack labelling against the room schedule, damage check, spare-parts pack present | Delivery note with pack count per room |
| Installation | Plumb and line, door gaps, drawer run, lighting operation, corner joint finish | Snag list with photo references and closure dates |
Labelling every pack to a room number is the single most useful step on site. It removes the guesswork when two identical-looking carcasses belong to mirror-image bedroom layouts.
7. Logistics, Sequencing and Site Readiness
Corner wardrobes arrive in more pieces than straight units, and they need both legs of the room finished before installation can start. Record the delivery window, storage location on site, the trade that must have completed flooring, painting and electrical first, and who provides installers. As a logistics and door-to-door delivery supplier we arrange freight, packaging and container loading, but the site-readiness date still has to come from your programme.
8. After-Sales Scope
Close the document with what happens after handover: which components are covered, who performs adjustment work, how replacement doors or shelf panels are ordered against the original specification, and how long you need spare parts available for a multi-unit development. Keeping the approved shop drawing and finish sample reference on file makes repeat orders and replacements far cheaper than re-surveying years later.
How We Support This Documentation
For villa, apartment and hospitality projects we work as a custom and OEM service manufacturer: your drawings or our design team's shop drawings, project-specific sizing, material and finish selection, production with quality control, then delivery, installation support and after-sales. Send us the room schedule, the dimension record and the approved finish reference, and the quotation comes back against the same structure you will use on site.
Send us your wardrobe schedule
Share drawings, room dimensions and finish references for your bedroom or villa package, and we will return shop-drawing-level proposals for the corner wardrobe range.