A request for quote that only says "shelf focused modular wardrobes, 6 units" will get you six different prices from six different factories, none of them comparable. Built-in cabinetry is priced by specification, not by item name. The information you hand over in the first message decides whether the reply is a firm number you can budget against or a placeholder that moves again at drawing stage.

Below is the checklist we use when specifying Shelf Focused Modular Wardrobes on villa and apartment projects, written from the buyer's side. Send it complete and you should receive a quotation that holds through production.

1. Room dimensions taken as built, not as drawn

Modular wardrobes are made to measure, so the opening is the specification. Provide:

  • Width, height and depth of each alcove or wall run, measured at floor, middle and ceiling level — walls are rarely square, and a 15 mm difference across a 2,400 mm run changes the carcass layout.
  • Position of skirting, architraves, cornices and any protruding pipework or radiators, because these determine whether the unit sits flush or needs scribing.
  • Ceiling type and whether the wardrobe is planned to reach it. A full-height run against a plasterboard ceiling needs a different top closure than one under a concrete slab.
  • Floor finish build-up — tiled, engineered boards over screed, carpet — and whether the unit is installed before or after that finish goes down.

Attach a simple dimensioned sketch per room, even hand-drawn, photographed from site. A plan file in DWG or PDF is better for multi-room packages.

2. Internal layout, shelf by shelf

"Shelf focused" describes the storage bias, not a fixed interior. Tell the factory what each bay does:

  • Bay widths and which bays are shelving, hanging, drawers or closed cupboard.
  • Clear shelf heights you need — folded linen, shoes, bags, suitcases — and where shelves must be adjustable rather than fixed.
  • Span of each shelf. A 900 mm shelf carrying books behaves differently from one carrying folded textiles; state the intended load so board thickness and edge treatment are quoted correctly.
  • Whether integrated lighting, mirror panels on internal doors, or soft-close hardware are required, since these are priced as options rather than defaults.

If you have a preferred mix of shelving and hanging space per bedroom, list it per room number. That single table removes most of the back-and-forth at drawing stage.

3. Doors, opening type and clearance

Door choice is where wardrobe quotations get revised. Specify:

  • Hinged, sliding or open — and for sliding, the track and clearance needed above and in front of the run.
  • Panels you want: full-height slab, framed, glass, mirror or a mix. The same carcass under Combination Modular Wardrobes or Hanging Modular Wardrobes doors is a different price from an all-shelf elevation.
  • Handle detail — profile handle, push-to-open or recessed pull — because handleless fronts need a different edge specification.
  • Any door that must clear a bed, bedside table or bathroom entry when open. Give the circulation dimension.

4. Materials, finish and colour reference

Never specify a colour by name alone. Include:

  • Board and surface system for carcass and doors, stated separately — the interior panel and the front are often different materials.
  • Finish: matte, high gloss, wood grain or textured, with a reference number or physical sample code rather than "grey" or "oak".
  • Edge banding colour and whether edges are visible on returned ends.
  • Where the units sit in relation to other joinery in the same project. Wardrobes ordered as part of a package with Custom Built-in Kitchen Cabinets should carry one finish schedule, so bedroom and kitchen tones match.

Ask the supplier to confirm which finishes are currently available for the carcass board you have chosen. Marketing names from a catalogue page are not always stocked in every substrate.

5. Quantity, room schedule and phasing

Give the unit count per room and per building or floor. A villa with four bedrooms and two dress rooms is quoted differently from a 30-apartment block, and the difference shows up in hardware grade, spare-parts provision and packing. State whether the order ships complete or in phases to match site access.

6. Delivery, packing and site conditions

Include the delivery address, floor level, lift dimensions or stair width, and who receives the goods. For overseas shipments, say which Incoterms you want quoted — FOB, CIF or delivered to site — so freight, customs clearance and last-mile handling are not added later as extras. Panel wardrobes travel flat-packed; confirm the crate count and total volume so you can check it against storage space on site.

7. Installation responsibility and after-sales terms

State plainly whether you are installing with your own trades or expecting the supplier to handle it. If installation is included, ask what it covers: levelling and fixing, door alignment, snags list, and who corrects site-built openings that turn out to be out of square. Then confirm the warranty period in writing, what hardware is covered, and how replacement panels or shelf pins are ordered years later.

8. What a complete RFQ looks like on one page

Before you send, check that the message answers all of these:

  • Room-by-room dimensions and sketch
  • Internal layout per bay, with shelf heights and loads
  • Door type, panel material and clearance notes
  • Carcass and front finish, each with a reference code
  • Hardware grade and lighting options
  • Quantity, phasing and delivery address with access details
  • Incoterms required and installation responsibility
  • Warranty terms and spare-parts route

Send that and the quotations you receive will line up against each other. Omit it and you are comparing three numbers built on three different assumptions.

SANTERSON manufactures made-to-measure modular wardrobes for villa, apartment and hospitality projects, with layout, finish and dimensions specified per project. Send the room schedule and finish references above to request a quotation, together with your delivery location and Incoterms preference.