A swim spa quote is easy to compare on price and almost impossible to compare on substance. Two proposals for the same shell size can carry different pump counts, different jet totals and very different electrical loads once options are added. This guide uses the Outdoor Swim Spa WS-115AⅣ-U as a worked example and shows what to ask for in writing before you sign anything.
Start With the Shell, Not the Finish
Catalogue dimensions for this model are 3880 × 2200 × 1250 mm. Treat those numbers as the external envelope and confirm three separate measurements with your site plan before you commit to a pad or a deck:
- Footprint on the ground. The shell sits inside whatever plinth, steps or perimeter cladding the proposal includes. Ask for a dimensioned drawing that shows the finished outline, not just the acrylic shell.
- Water depth and seat layout. Overall height does not tell you where the water line falls relative to the bench positions, or whether the seats face the jet bank or sit clear of it.
- Access for installation. A spa of this size arrives as a crated unit. Confirm the delivery route, lifting method and any crane or forklift requirement, because those costs sit outside the product price.
When you compare two suppliers, put both drawings at the same scale on one page. Differences in seat depth and step position become obvious, and they change how the spa is actually used day to day.
Read the Equipment Schedule Line by Line
The published specification for WS-115AⅣ-U lists one control system, four water pumps, one filter pump, a jet total of 23, one LED light and a total power figure of 11.85 kW, with water jets, LED lighting and ozone shown as the fitted features. A swim training system is not listed for this variant.
That last point matters more than most buyers expect. The closely related WS-115AⅣ shares the same 3880 × 2200 × 1250 mm envelope but carries a swim training system, one water pump, 24 jets, four LED lights and a total power figure of 8.05 kW. Same length, same width, different machine. If your brief says "lap swimming at home", a proposal built on the -U shell will not deliver it unless the swim unit has been added as an option and priced.
Use this checklist when you read any equipment schedule:
- Pump count and what each pump drives. Multiple water pumps usually mean zoned jet circuits; a single pump means one circuit.
- Filter pump duty and filtration cycle length, plus whether sand filtration is included or optional.
- Jet total versus jet type. Twenty-three jets spread across body zones behaves differently from the same number concentrated in the back panel.
- Water treatment. Ozone is shown as fitted on this model; UV sterilisation appears in the option list, so confirm which one your quotation names.
- Heating. Heat pumps sit in the optional-accessory column for this range, so a low headline price may simply mean heating was left out.
- Total power. Compare it against your available supply and the electrician's quote. An 11.85 kW load needs a dedicated circuit sized for it, and that is an installation cost you carry, not the supplier's.
Separate Standard Fit From Optional Extras
For this range, the catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as optional accessories. Availability and compatibility vary by model, so an option that exists on one shell is not automatically available on another.
| Line item | Ask the supplier to state |
|---|---|
| Insulation | Material, thickness and whether it covers the base as well as the side walls. This drives running cost more than any single jet. |
| Steps | Left-hand or right-hand orientation, and whether they are included in the quoted footprint. |
| Cover | Whether an insulated cover is in the price. It is one of the largest single factors in heat retention. |
| Control system | Which controller, where it is mounted and whether remote operation is standard or optional. |
| LED lighting | Fitted count and position. One light and four lights change the night-time use of the shell completely. |
| Electrical | Supply voltage, phase, dedicated circuit rating and who supplies the isolator. |
A useful test: ask every supplier to quote the same three configurations. Base configuration exactly as published. Mid configuration with heat pump, insulation and steps added. Full configuration with your preferred water treatment and lighting. Price comparison only becomes meaningful once all three bidders are on the same footing.
Ask for a Sample Before You Order a Project Quantity
If the swim spa is one line in a larger villa or resort package, you should not be judging finishes from a photograph. For outdoor and wet-area products from SANTERSON, request physical samples of the surfaces that surround the spa before the shell is ordered: the decking, cladding, coping and any cabinet or changing-room joinery specified alongside it. A sample tells you how a finish reads in real light, how it feels under wet feet and how it holds up against the chemicals you will be dosing the water with.
Keep the samples on site during installation and use them to check delivered goods against what was approved. This is the simplest way to close the gap between a rendered drawing and a finished terrace.
Compare Proposals as Packages, Not Products
SANTERSON covers custom and OEM work, logistics and door-to-door delivery and installation and after-sales support as named services, which means you can ask each bidder to price the same scope rather than assume it. Ask specifically for:
- Packaging specification and container loading plan, so you know how many units ship together.
- Which documents are supplied: commercial invoice, packing list and certificate of origin.
- Who handles customs clearance at destination, and what you must provide.
- The snag and inspection process at handover, and what is covered if a component arrives damaged.
Write the Incoterms into the comparison sheet. A delivered price and an FOB price are not the same number, and freight on a crated spa can be large enough to change which proposal wins.
Red Flags in a Swim Spa Proposal
- A price with no total power figure. Without it you cannot budget for the electrical work.
- "Jets" quoted as a count with no zoning or type detail.
- Heating described as "available" rather than priced.
- Model references that match the shell length but not the variant suffix, which is exactly where swim units and non-swim units differ.
- No dimensioned drawing showing finished outline plus step orientation.
A Practical Way to Score the Bids
Build a simple sheet with one column per bidder and rows for: shell dimensions as drawn, pump count and duty, jet total and zoning, water treatment named, heating method named, insulation described, total power, options priced in, freight terms, lead time and after-sales scope. Score each row on whether the item is stated, assumed or missing. A bid with more blanks looks cheaper until you price those blanks yourself.
Confirm included equipment and electrical requirements for the configuration you are actually buying, in writing, before payment. That single sentence, answered properly by two suppliers side by side, usually settles the decision faster than any brochure.
Product specifications quoted here follow the published catalogue entries for WS-115AⅣ-U and WS-115AⅣ. Optional accessory availability varies by model and configuration; confirm current options with the supplier before ordering.