A high gloss lacquer wardrobe reads as a simple finish choice on a drawing, but it touches joinery tolerances, site conditions, sampling and handover in equal measure. This checklist covers what project teams should have signed off before the finish is approved for production.
Why Wardrobe Approvals Get Stuck Late
Wardrobes are measured, fabricated and installed against conditions that only exist once walls, floors and ceilings are finished. When a specification is issued before those conditions are fixed, the approval stage becomes where every unresolved assumption surfaces at once: revised openings, substituted substrate, a lacquer colour that reads differently under the room's lighting, or an interior layout that no longer matches the storage brief. Confirming the items below while the design is still open is far cheaper than confirming them on site.
What High Gloss Lacquer Wardrobes Are Specified For
SANTERSON's High Gloss Lacquer Wardrobes sit within the Lacquer Wardrobes collection and are built for residential wardrobe projects, with finish, layout and dimensions specified to suit each space. The same collection also includes Matte Lacquer Wardrobes and Two Tone Lacquer Wardrobes, which is useful when a single bedroom needs a reflective feature elevation balanced against softer, lower-glare surfaces elsewhere.
The collection is offered as made-to-measure sizing with material and finish options and a layout tailored to the project. That flexibility is the point of specifying it — and it is also why approval cannot be reduced to picking a colour code from a chart.
Confirm The Scope And Interface Conditions First
- Openings and set-down dimensions. Record finished floor levels, ceiling heights, skirting treatment and any recess the wardrobe must sit into. Built-in joinery is measured against finishes, not structural shells.
- Door operation. Hinged, sliding or open configurations each need different clearances in front of and inside the opening. Decide this before dimensions are locked, because it changes carcass depth.
- Adjacency to other trades. Lighting positions, switches, air-conditioning grilles, curtain boxes and cornice lines all sit close to wardrobe elevations. Fix their positions on the drawing before fabrication starts.
- Floor fixing and levelling. Confirm who levels the floor and who packs the carcass, and how a full-height elevation is handled where a slab falls out of level.
Confirm The Finish Itself, Not Just Its Name
| Item to confirm | Why it matters for a reflective surface |
|---|---|
| Physical sample, viewed on site | A high gloss panel returns the room around it. Assess the sample in the actual daylight and artificial light of the bedroom, not only in a showroom. |
| Direction of sheen and grain | Reflective finishes show directional banding. Agree the orientation on the elevation drawing so panels match across a run. |
| Panel-to-panel colour tolerance | Batches vary slightly. Set the acceptable range in writing before production so an inspector has something to judge against at handover. |
| Edge and handle detail | Edge banding, mitring and integrated profiles are where a lacquer elevation looks cheap or precise. Approve these details, not just the flat panel. |
| Interior finish and hardware | Carcass interior colour, soft-close fittings, hinges rated for door weight and drawer runners all need to appear on the specification sheet. |
Confirm The Interior Layout Against The Storage Brief
The exterior finish is what gets approved in a meeting; the interior is what the client lives with. Before sign-off, walk through hanging heights for long garments, shelf spacing, drawer counts, mirror or glass panel positions, lighting inside the carcass, and how the layout serves each user of the room. Because these wardrobes are made to measure, an interior change costs little before fabrication and a great deal afterwards.
Practical rule: approve two things separately — the finish sample and the dimensioned layout drawing. A single "approved" stamp that covers both is how teams end up with a perfect colour on a wardrobe that does not store what the client asked for.
Confirm Supply, Packaging And Site Sequence
Reflective panels are damaged most often in transit and on site, so the commercial and logistics terms belong in the approval conversation. Confirm the packaging standard and carton marking, how spare panels for a long run are handled, who receives and inspects the delivery, and where the panels are stored before installation. Then sequence the install after painting, flooring and lighting are complete, with a snag list signed off at handover.
Where the same supplier also delivers cabinetry, doors, wall panelling and other built-in elements, one coordinated order simplifies interfaces considerably. SANTERSON works as a one-stop furniture and building materials supplier, covering design consultation, product specification, manufacturing, project coordination and door-to-door delivery.
How A Custom Order Changes The Approval Path
If the elevation needs a bespoke profile, a non-standard substrate or a colour outside the standard range, the order moves into custom territory. That adds steps — design and prototyping, material and finish selection, then production confirmation — which should be reflected in the programme rather than absorbed silently by the site team.
SANTERSON's custom furniture and OEM service covers bespoke design and prototyping along with material and finish choices, so a project can develop a wardrobe elevation that matches its own joinery language instead of adapting to a catalogue size. Ask for the sampling sequence and the point at which further changes stop being free before that work begins.
Pre-Approval Checklist
Sign these off before releasing to production
- Measured openings against finished floor and ceiling levels, signed by the site lead
- Door type and clearance confirmed on the elevation drawing
- Lacquer colour and sheen sample reviewed in the room's own lighting
- Panel orientation, edge detail and hardware schedule approved
- Interior layout matched to the storage brief, per user
- Written colour and finish tolerance for inspection at handover
- Packaging standard, carton marking and spare-panel policy agreed
- Delivery window and storage location confirmed with the site team
- Snag and handover process named, with responsibility assigned
Common Questions
Should the wardrobe be ordered before the room is decorated?
No. Order to finished conditions. Paint colours, flooring and cornice profiles all change how a reflective elevation reads, and the measurements themselves depend on completed surfaces.
Is a high gloss finish practical for bedrooms?
It is workable provided the team accepts what the surface shows. Fingerprints and dust read more readily on a glossy panel than on a matte one, so agree the cleaning method with the client at approval rather than after handover. Where glare is a concern in a smaller room, pairing a gloss feature elevation with matte lacquer panels elsewhere keeps the look without flooding the space with reflections.
What documents should sit behind an approval?
A dimensioned elevation drawing, an approved physical sample reference, the hardware and interior schedule, and the agreed tolerance for colour and sheen. With those four in place, disputes at handover have something to be settled against.
For a wardrobe elevation that has to be matched to wider joinery, wall panelling and doors on the same programme, send the drawings to SANTERSON for specification and quotation.