A wall sconce quotation is rarely a single number. Because our bathroom and interior sconces are made to measure, the price follows from the specification: where each fixture sits, what finish it carries, how it is wired, and how many pieces travel together. Send the information below with your enquiry and we can return an itemised quotation instead of a rough estimate.
1. The room, the fitting and the quantity
Start with the Santerson Wall Sconces page or a reference image from our lighting range, then tell us which room each fixture serves. A sconce beside a bathroom mirror and one flanking a villa corridor are not the same order: the first sits close to a basin and shower enclosure, the second is a decorative accent on a dry wall. For every fitting position, give us the room type, the number of pieces, and whether the fixtures repeat across guest rooms or bathrooms. Repeat quantities matter more than a single sample, because tooling, packaging and container loading are all planned around the full set.
If you are furnishing several villas or a hotel floor, list the fixture count per room type. That lets us group identical units into one production batch and quote them as a package rather than as one-offs.
2. Dimensions and mounting details
Our lighting and accessories are offered with made-to-measure sizing, so the drawing or dimension note is what makes a quotation usable. Please include:
- Overall height, width and projection of each sconce, plus the backplate size if it differs from the shade or body.
- Mounting height above finished floor, and the distance from the centre of the fitting to the mirror edge, vanity edge or door reveal.
- Wall build-up at the position: plasterboard, tile, stone panel or timber panelling, and the thickness. This decides the fixing type and whether a back box needs to be set out in advance.
- Whether the fitting must align with a mirror, vanity lighting run or headboard, so we can match centres and heights across the elevation.
A marked-up elevation drawing or a site photograph with measurements is enough. Sketches with rough dimensions lead to revisions; drawings with finished-floor levels and wall build-ups do not.
3. Finish, material and matching items
Tell us the finish you want and what it has to match. Sconces are usually specified alongside other metalwork in the same room: basin taps, towel rails, mirror frames, cabinet handles and shower fittings. Naming the reference finishes lets us coordinate plating and coating across the order instead of shipping close-but-different tones. Where a project uses our bathroom hardware or towel warmers and rails, send those item references in the same enquiry.
4. Electrical specification
Electrical details are the part most often left out of an enquiry, and they change both the product and the price. Please confirm:
| Item to confirm | Why the supplier needs it |
|---|---|
| Supply voltage and frequency at site | Fixtures are built for the destination market's supply, not a universal default. |
| Switching and control | Wall switch, bedside switch, dimming or a smart control system each need different driver and wiring arrangements. |
| Driver location and access | Whether the driver sits inside the fitting, behind an access panel, or in a ceiling void determines serviceability. |
| Cable entry position | Back-centre, top or side entry has to match what the wall already carries. |
| Bathroom zone and enclosure rating | The installation location sets the protection requirement; this must be confirmed with your electrician for each position. |
| Lamp output and colour temperature | Lumen level and warm or neutral white are set per room, especially around mirrors and vanities. |
5. Order terms and delivery
With the fixture, dimensions, finish and electrical data in hand, the remaining items are commercial. Send us:
- Total quantity and any phasing between rooms or buildings.
- Destination city and port, plus whether you want door-to-door delivery or collection at a port. Our logistics and door-to-door delivery service covers freight arrangements and shipping paperwork.
- Packaging preference for fragile items, and whether crates need to fit a specific lift or doorway.
- Whether the sconces ship alone or consolidate with other items from the same project, such as vanities, ceramics, cabinetry or custom and OEM joinery.
A short enquiry template you can copy
| Field | Your entry |
|---|---|
| Project and location | Villa, hotel or apartment project; city; room types involved. |
| Fixture reference | Model name or link to the product page, plus reference images. |
| Quantity per room type | Number of pieces and how they repeat. |
| Dimensions | Height, width, projection, backplate; mounting heights above finished floor. |
| Wall build-up | Material and thickness at each position. |
| Finish | Required finish and the metalwork it must match. |
| Electrical | Voltage, control type, driver location, cable entry, lamp output and colour temperature. |
| Delivery | Destination, delivery method, phasing, packaging needs. |