Open shelving looks simple on a drawing, and that is exactly where bathroom projects get into trouble. A Santerson Freestanding Open Shelves unit is supplied to project-specific dimensions and finishes, so the installation plan has to carry information the workshop needs before production starts, not only after the crate arrives on site. The plan below is the one we ask buyers, contractors and designers to prepare for residential bathroom projects; it is also useful when a villa or hospitality fit-out includes several shelving types in the same package.

1. Room dimensions and the exact position of the unit

Send finished-line dimensions rather than structural ones, because tiles, waterproofing and plasterboard all consume space. For each room record:

  • wall length and height to the finished ceiling, plus any soffit, pipe chase or box duct in the intended position;
  • the distance from the basin, toilet, shower enclosure or vanity to the nearest edge of the unit, so doors and drawer fronts can still operate;
  • floor level across the planned footprint, since a freestanding unit sits on the floor and an uneven tiled area will show up as a wobble once loaded;
  • the position of showers splashing zones, towel rails and vanity lighting, which decide whether open shelves face wet or dry areas.

Where the wall space is narrow or turns a corner, compare the freestanding option with Santerson Corner Open Shelving before you lock the layout. A corner unit usually recovers storage that a straight run wastes.

2. Intended loading and shelf spacing

Tell us what will actually sit on the shelves: towels, bath linens, guest amenities, glassware, books or decorative pieces. Loading changes the shelf construction and the support detail, and it is one of the items we ask buyers to confirm for each configuration.

Use on siteWhat the plan should state
Stacked towels and linensEvenly distributed weight per shelf, plus clear height for folded stacks
Bottles, amenities, fragrancesPoint loads and their positions, and whether a glass shelf option is required
Display objects in a guest bathroomObject heights, sight lines from the doorway, and cleaning access behind items
Housekeeping stock in a villaReplenishment route, shelf depth, and whether labels or baskets are used

Record the clear height you need per compartment instead of only an overall shelf count. It avoids the common complaint of a shelf that fits nothing on the list.

3. Finish, material and moisture exposure

Bathrooms combine humidity, cleaning chemicals and temperature swings within a few square metres. Specify in writing:

  • the body and shelf finish, and the same finish reference used elsewhere in the project so shelving matches vanities, wardrobes and wall panelling;
  • edge treatment and hardware finish, which wear fastest in high-use bathrooms;
  • whether the unit stands inside or outside the shower splash zone, and who cleans it and how often;
  • the approved cleaning products, because aggressive agents damage finishes that were never intended for them.

If the design calls for transparent shelves next to the unit, Santerson Glass Shelves and Santerson Metal Frame Shelves are separate configurations with their own fixing and loading requirements, so they should be listed as their own line items in the plan rather than treated as a variant.

4. Services, sockets and existing elements to avoid

Open shelving has no back panel to hide anything, so every pipe, valve, socket and switch near the position becomes visible. Confirm in the plan:

  • the location of hot and cold pipework, waste outlets and under-basin plumbing;
  • sockets, switches, towel warmers and any mirror cabinet that shares the wall;
  • floor heating loops or a floor drain in the footprint of a freestanding unit;
  • skirting, tile trims and cornices that will prevent the unit from sitting close to the wall.

Photographs of the wall before tiling are worth more than a marked-up drawing, and they settle disputes about what was on site when the order was placed.

5. Wall build-up and fixing method

Even a freestanding unit normally needs restraint at the top or side, and the fixing detail depends entirely on what is behind the finish. State the wall construction for each position: solid masonry, timber or steel stud with lining, tiled substrate, or a cavity with insulation. Where a shelf, mirror cabinet or lighting point also has to be fixed nearby, list those items in the same plan so anchors and blocking are designed together.

This is the section most often left blank, and it is the one that costs the most time on site, when an installer arrives with the wrong fixings or discovers that a tiled cavity wall cannot take a load without additional support.

6. Delivery sequence and site readiness

Shelving should arrive after wet trades, tiling, painting and glazing are complete, but before soft goods and final cleaning. Put that sequence in the plan together with:

  • the delivery address, access route, lift or stair dimensions, and parking for a vehicle of the crate's size;
  • who receives the goods, checks the packing list and signs for the crates;
  • where crates are stored on site, kept dry and off the floor until installation;
  • whether other items from the same order, such as vanities, basins or Santerson Freestanding Cabinets, are scheduled for the same visit.

Grouping related items into one shipment and one installation visit reduces repeat site mobilisation, which is where multi-item bathroom packages usually overrun.

7. Installation scope, inspection and handover

Name the party responsible for each step in writing: unpacking, positioning, levelling, fixing to the wall, protecting adjacent finishes, removing packaging and making good around fixings. Our own service covers on-site installation, inspection with a snag list, warranty coverage, spare parts or replacement, and ongoing maintenance; the applicable terms are confirmed per project rather than assumed.

Close the plan with a handover record that lists the finish reference, dimensions as built, fixing method used, and any site adjustment made. That record makes a later spare shelf or replacement straightforward to quote.

Before you place the order: a short checklist

  • Finished-line dimensions and unit position confirmed for every room
  • Loading per shelf and required clear heights recorded
  • Finish references matched to vanities, wardrobes and panelling
  • Pipework, sockets and skirting shown on the drawing or in photographs
  • Wall build-up stated for each fixing position
  • Delivery date, access route and storage area agreed with the site team
  • Installation responsibility, snag list and handover record defined

A plan that answers these seven points lets us produce the unit once, to the right size and finish, and lets your installers work from information instead of assumptions. Send us the room drawings together with the loading and finish notes, and we will confirm dimensions, configuration and fixing method for each position in your project.

SANTERSON supplies custom furniture and interior products for residential, villa and hospitality projects, with door-to-door delivery and installation support. To plan open shelving for a bathroom or whole-home fit-out, visit our contact page.