A high gloss lacquer wardrobe looks impressive on a rendering long before it has to survive a real bedroom: reflections that show every wavy panel, edges that catch the light, doors that must still close cleanly after a season of humidity swings. That is exactly why two quotations for what appears to be the same built-in can sit far apart in price and produce very different results on site. Before you sign a purchase order, here is what a serious quotation should state, and where buyers usually lose money.
Start With What Is Actually Being Quoted
Most disputes begin with a line item that reads like a product name rather than a specification. Our High Gloss Lacquer Wardrobes sit in the Lacquer Wardrobes collection and are made to measure: finish, layout and dimensions are specified per project, so a quotation that only says "high gloss wardrobe, 2.4 m" is not comparable with anything. Ask for the specification to be written into the quote itself.
A usable line item names the carcass material and board thickness, the door construction, the lacquer system and number of coats, the edge treatment, the hardware brand and model, and the internal configuration. If any of those are missing, the supplier is quoting a guess, and the difference will surface later as an extra charge or a substituted part.
The Finish Line Item Is Where Prices Hide
"High gloss lacquer" covers several genuinely different processes. A spray-applied lacquer built up in coats and polished is not the same product as a laminated or foil-wrapped panel sold under the same phrase. The quote should say which process applies, how many coats, whether the reverse face of each door is finished to the same standard, and whether panels from different batches are expected to match in sheen.
Two details tell you more than the marketing copy ever will. First, ask how the gloss is inspected before packing — under what light and at what angle, since reflections reveal defects that a flat-lit warehouse check misses. Second, ask what happens to panels that fail that check: are they re-sprayed, replaced, or shipped with a note. A supplier who has an answer has a process; a supplier who does not is passing the risk to you.
Read the Drawing, Not Just the Price
For made-to-measure joinery, the quotation and the shop drawing must agree. Check the overall height against your finished floor and ceiling levels, not the structural slab; check whether the quoted height includes skirting, scribes, cornice returns and any filler panels needed to make the run square. A wardrobe priced at 2400 mm into an opening that varies by 15 mm across its width will need visible scribing on site, and that work is rarely in the original number.
Confirm how corners and returns are detailed. Straight runs are cheap; an L-shaped return, a column build-out or a niche where the wardrobe meets wall panelling is where tolerances compound. The drawing should show which component overlaps which, and who supplies the interface — the joinery contractor, the wall finisher or you.
Doors, Hardware and the Things That Get Left Out
| Item | What the quote must state | Why it matters for a gloss finish |
|---|---|---|
| Door type | Hinged, sliding or pocket; panel thickness; overhang at the reveal | Gloss panels show misalignment more than matte surfaces do |
| Hinges and runners | Brand, model, closing mechanism, load rating | Substituted hardware is the most common quiet downgrade |
| Handles or handleless profile | Integrated edge pull, routed profile or external handle | Fingerprints on gloss doors are a handling, not a quality, issue |
| Glass elements | Glass type, thickness, tint, framing | A Glass and Lacquer Combination Wardrobe mixes two supply chains and two lead times |
| Internal fit-out | Shelves, drawers, hanging rails, lighting, their quantities | Internals are often quoted as an allowance rather than a fixed list |
| Protective packing | Edge protectors, corner boards, interleaf, crate type | Gloss faces chip and scratch in transit more readily than textured finishes |
Scope Boundaries: Where Two Trades Shake Hands
State clearly in the quotation what is excluded. Site preparation, electrical connection for internal lighting, making good around the perimeter, and any packing needed to protect on-site finishes after delivery are frequently assumed by one party and not by the other. If your project runs wardrobe joinery alongside other built-ins, decide now whether one supplier handles the whole set — wardrobes, vanity, media wall — because matching lacquer sheen across batches from two factories is a risk you take on yourself.
Commercial Terms Worth Reading Closely
- Incoterms and what they include. Freight, insurance and the delivery point change the real cost. A door-to-door quotation and a port-only quotation are not comparable at the headline number.
- Packaging specification. Ask what the packing consists of and how containers are loaded; gloss panels travel best with proper edge protection and interleaf, not cardboard alone.
- Measurement responsibility. Who measures the opening, and when — before or after floor and ceiling finishes are complete. Re-measurement after finishes is cheap; remanufacture is not.
- Change orders. Ask what a revised dimension costs after production has started, and at what point drawings become fixed.
- Snag and replacement process. What happens if a panel arrives damaged: replacement, on-site repair, or credit — and who covers the freight both ways.
A Quick Pre-Order Check
- Finish process, coat count and reverse-face finish are written in the quote
- Carcass material, board thickness and edge treatment specified
- Hardware named by brand and model, not "equivalent"
- Shop drawing attached, signed and dimensioned to finished levels
- Glass, if any, specified by type, tint and framing
- Packing and loading method described
- Incoterms, delivery point and insurance stated
- Exclusions listed explicitly
- Measurement and drawing-freeze dates agreed
If a supplier cannot put these nine points in writing, the quotation is not finished — it is an estimate with a confident layout.
How SANTERSON Handles Wardrobe Quotations
SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials, operating since 2008, with project work across villas, hospitality and offices. Our custom furniture design and prototyping service covers bespoke finishes and layouts, and quotations are built from confirmed shop drawings rather than catalogue dimensions. Alongside production we arrange logistics and door-to-door delivery, so the freight, packaging and delivery point are stated in the same document as the joinery price instead of being negotiated separately after the order.
Send us your drawings, room dimensions and finish preference — high gloss, matte or a combination with glass — and we will return a quotation written to the checklist above, with exclusions listed rather than left to assumption.