A folding door quotation rarely arrives as a single number. It arrives as a set of choices — panel layout, frame and glass build, hardware, finish, opening direction and the site conditions that decide whether the installation runs smoothly or turns into a string of variations. The checklist below shows how we ask buyers to compare samples and proposals for Santerson Glass Folding Doors line by line, so the specification you approve on paper is the one that reaches site.
Why a single sample cannot settle the decision
Glass folding doors for residential projects are made to measure. Each opening is dimensioned for the project, and the material, finish and layout are specified per project rather than picked from a stock size. That has a direct consequence when you compare proposals: one physical sample tells you what a finish or a frame profile looks like, but it cannot tell you how the panels will stack across your particular opening, where the traffic edge will fall, or how the top and bottom guides meet your floor build-up.
We therefore treat sampling as a two-part exercise. The first part is a physical reference — a frame corner, a glass and finish swatch, a hardware piece you can hold. The second part is documentary: a dimensioned elevation, a panel-by-panel layout, and a written specification that both sides sign off before production starts. A proposal that carries only the first part is not comparable with one that carries both.
What to ask for in the sample pack
Ask for items you can actually test against your drawings and your finishes schedule:
- A frame profile corner or cut section, so you can see the sightline, the profile depth and how the leaves meet when closed.
- Glass and finish samples in the size range used on the project, viewed next to the adjacent wall, floor and joinery finishes rather than on a showroom bench.
- The handle, hinge and pivot or guide components you intend to specify, so the operation weight and the fixing detail can be assessed by hand.
- A written list of what each sample represents — model, finish code, glass build and hardware set — because samples without labels cannot be traced back into a purchase order.
Keep the approved samples. They become your reference at goods-receipt stage: when the delivered panels are checked, the approved sample is what you compare against, not a memory of the showroom.
Reading the proposal line by line
Once samples are in hand, the comparison happens on paper. The table below lists the fields we recommend you insist on in every quotation for made-to-measure folding doors, and what each field tells you.
| Field in the proposal | What to check | Why it changes the outcome |
|---|---|---|
| Opening sizes and head height | Each width and height, taken from site or from setting-out drawings, not from a typical detail. | Determines panel count, leaf width and whether the stack will clear the adjacent wall. |
| Panel layout and folding direction | Number of leaves, which side they stack to, where the traffic leaf sits. | Two layouts for the same opening produce very different usable openings and furniture plans. |
| Material and finish schedule | Frame material, glass type, colour or veneer finish matched to your finishes schedule. | A finish described in words only is replaced at the first variation; a sample-backed code is not. |
| Hardware set | Hinges, pivots, top and bottom guides, handle type, locking arrangement per leaf. | Hardware quality drives how the doors feel after two years, and it is the easiest line for a low quotation to trim. |
| Threshold and floor interface | Who supplies and installs the track, threshold and floor finishes on either side. | An unassigned interface becomes a site dispute and a variation you pay for twice. |
| Packaging and packing list | Panel-by-panel identification matching the drawings. | Labeled panels are installed in sequence; unlabeled crates are opened on site by guesswork. |
| Assumptions and exclusions | Site preparation, structural openings, local trades, final fixing. | The cheapest headline price usually excludes the most work. |
The comparison sheet that prevents false savings
Put every quotation into the same grid before you compare totals. A simple sheet with these columns is enough:
- Opening reference and dimensions, repeated identically for each supplier so nobody is quoting a different opening.
- Panel count, leaf width and folding direction as stated in that supplier's layout drawing.
- Frame material, glass build and finish code, with the sample reference attached.
- Hardware make and set, listed per opening.
- Inclusions: packing, marking, guides or threshold, installation support, spares.
- Exclusions and site-preparation assumptions, written out rather than left implied.
Two quotations that differ by a wide margin almost always differ in the last two columns. Comparing only the totals hides that difference; comparing the grid exposes it before anyone signs.
Site conditions to confirm before you approve production
Most folding door problems reported after delivery trace back to site data that was never confirmed. Before releasing production, check and record:
- Finished floor levels on both sides of the opening, including the build-up that sits above the structural slab.
- Head room and the lintel or beam condition, with the tolerance available for the head track.
- Squareness and plumb of the opening, and who is responsible for bringing it within tolerance.
- Wall finish at the stack side, so folded panels do not rub against a loose cladding or reveal.
- Clearance for furniture, curtains and traffic routes once the leaves are folded back.
How the same method applies across the door range
The comparison logic above is not specific to glass. It works equally well when you are specifying Santerson Wood Veneer Folding Doors for an interior partition, where the finish schedule matters more than the glass build, or Classic Folding Doors for a residential store or dressing area. In every case the fields are the same: dimensions, layout, finish code, hardware set, interface responsibilities and exclusions.
If your project also needs hinged, sliding or pocket doors from the same range, ask for their quotations in the same grid. Doors specified through one consistent sheet coordinate far better on site than doors bought from three differently formatted proposals, and the finishes can be matched across types rather than approximated later.
Where a single supplier simplifies the comparison
Comparing proposals becomes considerably easier when the folding doors are procured alongside the rest of the joinery and interior fixtures. Drawings, finish codes and site tolerances then pass through one production coordination process instead of being reconciled between several vendors with conflicting details. Our team handles design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then installation and handover as one scope — the same approach used on our turnkey villa and interior project solutions for villas, hospitality and office projects.
For buyers comparing us against other sources, send the same opening schedule to both sides and ask for the grid above. That is the fastest way to see whether a lower price reflects an efficient build or simply a thinner specification.
Share your drawings, dimensions and finishes schedule and we will return dimensioned elevations, a panel layout and a line-by-line specification you can compare against any other quotation. Contact PHILLIP on +86-13928214007 or santerson@qq.com, or use the enquiry form.