A rendering of a bright bedroom with handleless white doors looks simple to approve. What is difficult is turning that picture into a wardrobe a factory can actually build, ship and install. The gap between the two is filled by one document: the enquiry. Below is how project buyers, builders and interior studios put a White Acrylic Wardrobes enquiry together so that the quotation they receive matches the design intent, and so that three bedrooms on three floors are quoted on the same basis.

Start with what the brief already tells you

Most wardrobe enquiries fail before they are written, because the brief is treated as a picture rather than as a set of decisions. Before you contact a Built-in Furniture supplier, read your own drawings and mark four things: which rooms get wardrobes, the finished opening width and height of each, whether the unit runs floor to ceiling or stops below a cornice, and what has to live inside it. Long hanging for coats and dresses, short hanging for shirts, drawers for folded items, shelves for boxes - the interior split changes price far more than the door colour does.

If your studio has not resolved layout or storage zoning yet, that is a design question rather than a manufacturing one. SANTERSON's Interior Design Services cover space planning, furniture layouts and 3D renderings before production coordination begins, so an early-stage brief can be developed into buildable drawings instead of being guessed at in a spreadsheet.

The six items a complete wardrobe enquiry contains

ItemWhat to write downWhy the quotation depends on it
Room list and quantitiesUnit number, floor, room name, one line drawing or marked-up plan per wardrobePriced per linear metre of run; a list without drawings is priced as an estimate, not a firm figure
Finished dimensionsWidth, height and depth at the finished face, plus ceiling height and any skirting or cornice to scribe aroundMade-to-measure sizing is specified per project; out-of-square walls and sloping ceilings are built into the carcass, not absorbed on site
Door style and openingHinged, sliding or open; handleless or with handles; full-height or split panelsSliding and hinged runs use different tracks, clearances and hardware sets
Surface finishWhite acrylic as the reference, then state gloss level and whether other rooms repeat the same finish or switch to Matte Acrylic WardrobesFinish is specified per project; matching sheen across a floor has to be stated, not assumed from the word "white"
Interior layoutRough zoning sketch: hanging heights, drawer banks, shelves, lighting provisionsCarcass count, hardware count and panel cut list all follow from the interior plan
Delivery and site conditionsPort or site address, access route, lift or stair dimensions, install window, who installsPackaging, container loading and delivery method are arranged around the site, not around the factory

How the enquiry moves into production

Once those six items are in one email, the process is a sequence of confirmations rather than a negotiation. SANTERSON's stated cooperation steps run from project brief and design proposal to quotation and detail confirmation, then to production, shipment and follow-up. For a bespoke wardrobe run this normally means drawings come back for your sign-off before panels are cut, and the specification sheet lists dimensions, board material, door style and finish line by line so that what you approve is what gets made.

Because these units are custom-built rather than catalogue items, the Custom Furniture Manufacturer route also lets you change things a standard product would not allow: carcass depth for a shallow bedroom wall, a different interior split in the master compared with the second bedroom, an integrated niche or tall cabinet at the end of a run, and finish matching to Kitchen Cabinets and Hotel Appliances elsewhere in the same building. Send those variations in the first enquiry. Sent after drawings are issued, each one restarts the detail confirmation step.

Confirm dimensions and selected specifications for each project before production is released. Panel thickness, board material and hardware grade are agreed per order; nothing on a product page fixes them for your building.

Getting freight and installation right at enquiry stage

Built-in joinery is the trade that punishes poor logistics planning, because a short panel cannot be bought locally in a matching finish. State early whether goods are going to a port, a builder's warehouse or a finished residence. Freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery are arranged for you, so the site address and access constraints belong in the enquiry rather than in a later email.

Then settle who fits the wardrobes. On-site installation with inspection and snagging is available as part of Furniture Installation and After-sales Support, and your own joiner can fit instead if drawings and a hardware schedule are clear enough for them to work from. Both routes need the same thing: signed dimension sheets before manufacture. Ask about warranty terms, spare panels and response arrangements in writing at quotation stage, so they sit alongside the price rather than being discovered after delivery.

A short checklist before you press send

  • One drawing or marked-up plan per wardrobe, each labelled with a unit number you will keep using on drawings, packing lists and invoices.
  • Finished width, height and depth for every unit, plus ceiling height and notes on skirting, cornices, wires or pipes to work around.
  • Door style, opening direction and handleless or handled, stated per unit rather than once for the whole project.
  • Finish reference for each room, including whether high-gloss white and matte white appear in the same run.
  • Interior zoning per unit, with lighting provisions called out if wanted.
  • Delivery address, access limits, install window and your decision on who installs.

A wardrobe enquiry written this way reads as a complete package to the factory, so the quotation comes back firm and comparable across units. If you are furnishing more than the bedrooms - flooring, wall panelling, bathroom fixtures, lighting - One-stop Furniture and Building Materials Supplier coordination lets those trades be specified against the same drawings and delivered on one schedule. Send your marked-up plans and room list to SANTERSON and ask for a per-unit quotation with a specification sheet; that single document is where a design brief becomes a buildable wardrobe.

Send your room list, marked-up plans and finish references to Contact - contact name PHILLIP, phone/WhatsApp +86-13928214007, email santerson@qq.com - for a per-unit quotation on white acrylic wardrobes made to your dimensions.