A compact square swim spa looks simple on a datasheet until the order goes in. The shell, the pumps, the jets, the lighting and the water treatment all arrive from different places, and one missing line item can hold up a whole terrace or pool deck handover. This guide walks through how to plan quantities and coordinate products for Outdoor Swim Spa WS-PC03, so buyers, contractors and project teams can specify the package once and get it right.
What the catalog lists for WS-PC03
WS-PC03 sits in our configurable outdoor swim and hydrotherapy range. The figures below are the catalog values shown on the product page; treat them as the starting point for a quotation rather than a fixed delivery specification, because options change what actually ships.
| Item | Catalog entry | How to read it when ordering |
|---|---|---|
| Model | WS-PC03 | Quote and packing lists should carry the same model code, including any option suffix. |
| Catalog dimensions | 3000 × 3000 × 1000 mm | Shell envelope. Confirm the site base, access route and any surround framing against these numbers. |
| Control system | 1 set | Ordered as a set, not as separate boards or keypads. |
| Water pump | 1 pc | Jet circuit. Extra pumps are an option and change total power. |
| Filter pump | 1 pc | Filtration circuit, sized for the shell volume. |
| Jet total | 50 pcs; 4 water columns | Count jets and columns together so nothing is ordered as a loose spare by mistake. |
| LED lights | 1 pc | Deck lighting. Additional fixtures are an option on some configurations. |
| Total power | 2.75 kW | Catalog figure for the listed configuration; it moves with added pumps or a heat pump. |
| Features shown | Water jets, LED lighting, Ozone | Ozone is the treatment shown in the catalog. UV sterilization is a separate option. |
Quantity planning: what one unit actually needs
For a single WS-PC03, most of the quantity work is confirming that the standard items are all present and that the optional items you want are written into the same order. Splitting those two lists across separate purchase orders is where projects lose time.
1. The shell and its fixed equipment
One shell, one control set, one filter pump, one water pump, 50 jets arranged as four water columns, one LED light. Write these into the order as standard inclusions and ask for them to be itemised on the packing list, so the site team can tick them off at unloading instead of discovering a gap during commissioning.
2. The options you choose per project
- Heat pump — decide early, because it drives the electrical design and often the enclosure or plant cupboard.
- UV sterilization — ordered alongside the ozone system shown in the catalog; confirm how both are wired and controlled.
- Sand filtration — an alternative to the standard filter arrangement, with its own footprint and plumbing route.
- Insulation — matters for running cost in cooler climates and for year-round use.
- Steps — simple, frequently forgotten at handover, and awkward to add once the surround is built.
- Additional water pumps — only if the jet layout requires them; they change total power.
Availability and compatibility vary by model, so each option should be confirmed against WS-PC03 rather than assumed from another size in the range.
3. Site-side quantities that are not in our packing list
- Base slab or pedestals, drainage and any pump-room ventilation, arranged by your contractor to suit the 3000 × 3000 × 1000 mm envelope.
- Dedicated power supply, protection device and cable sized to the confirmed connected load.
- Access for delivery: check door widths, garden gates, crane or lift access against the packaged dimensions we confirm before shipping.
Multi-unit orders: keeping quantities honest
For villas with more than one unit, resort villas and hotel leisure facilities, order by configuration rather than by model name alone. Two identical shells with different option sets are not the same product at delivery.
- Issue a schedule that lists each unit's number, model code, options and installation location, and keep one version as the reference for production and shipping.
- Group identical configurations into the same production batch so spares, controls and documentation match across units.
- Order consumables and wear parts — filter media, jet seals, spare LED — against the total unit count in one go; retroactive small orders cost far more in freight.
- Sequence deliveries to installation order. A unit that arrives before its slab is ready usually sits in storage at the buyer's cost.
Product coordination: what has to line up with the spa
A swim spa rarely sits alone. When the same team supplies several elements of a wet area, tolerances and finishes get settled once instead of argued about on site.
Water treatment and controls
Confirm which treatment is included and which is optional — ozone as listed, UV if specified — and where the control system will be mounted relative to the shell. Control placement affects cable runs, and it is far cheaper to fix on a drawing than after tiling.
Poolside furniture and finishes
Deck furniture, loungers and shades should be chosen with the same access route and delivery window in mind. Our Furniture Series covers aluminium, rope weave, wicker and teak-look options for poolside and terrace settings, so the seating scheme can be produced and shipped with the spa instead of months later.
Adjacent interior fit-out
Where a swim spa connects to an indoor bathroom, changing area or gym, the same coordination problem repeats: basins, showers, vanities, tiles and joinery all need one set of levels and dimensions. Grouping these with the spa order keeps materials, finishes and delivery dates under a single schedule.
Related models in the range
If the site needs lap swimming rather than hydrotherapy, compare WS-PC03 against longer configurations such as Outdoor Swim Spa WS-SP600, which carries a listed swim training system in a 5900 × 2500 × 1600 mm shell. The Swimming Pools and Swim Spas category lists the full range, including square and rectangular sizes.
A short pre-order checklist
- Model code with option suffix confirmed on the quotation and the packing list.
- Standard inclusions itemised: control set, water pump, filter pump, 50 jets in four columns, LED light.
- Options confirmed for this specific model: heat pump, UV, sand filtration, insulation, steps.
- Connected load for the chosen configuration supplied to the electrical designer.
- Packaged dimensions and delivery route checked against site access.
- Spares and consumables ordered against the total unit count.
- Commissioning support and after-sales scope agreed before shipment, not after.
How we handle this as one order
SANTERSON has manufactured furniture and building materials since 2008 and supplies swim spas alongside the rest of the project package. Our Custom & OEM Service covers bespoke dimensions, finishes and configurations where a standard catalog size does not suit the site, and our Logistics & Door-to-Door Delivery service handles freight, export paperwork and container loading for the combined order. Send us the unit schedule — model codes, options, quantities and installation locations — and we will return a specification sheet with confirmed dimensions, connected load and a packing list you can check at unloading.