A curio cabinet is one of the easiest items in a joinery package to quote wrongly. Two buyers can describe the same piece as a "glass display cabinet with lights" and receive prices that differ by a wide margin, because the drawings behind those words were never the same. If you are sourcing Santerson Curio Cabinets for a villa living room, a hotel lobby display or a private collection room, the quality of your request for quote decides whether the reply you get is comparable with other offers — or simply unusable.

The cabinets in this range are configurable rather than standard: finish, layout and dimensions can be specified to suit each space, and the configuration lists made-to-measure sizing together with material and finish options. That flexibility is exactly why a vague enquiry produces an unreliable number. Below is the information a manufacturer needs from you, and what each item changes in the quotation.

1. The room, not just the cabinet

Start with the space the piece will occupy. A curio cabinet built into a niche, one standing free against a finished wall and one used as a room divider are different products in terms of carcass construction, back panels, edging and how the unit is fixed and transported.

  • Site address and project type (private villa, hotel, apartment show flat, sales gallery).
  • A floor plan or a marked-up photograph showing where the cabinet goes, plus the clear opening width, height and depth available.
  • Whether the unit is built-in or freestanding, and whether it must align with adjacent joinery, wall panelling or flooring that someone else is installing.
  • Ceiling or bulkhead conditions above the unit, skirting or plinth details below, and any radiator, socket or switch the cabinet has to clear.

2. Dimensions with a tolerance, and who measures

Made-to-measure work lives or dies on the survey. Send overall dimensions in millimetres, and state clearly whether they are design dimensions from a drawing or taken on site. If the site survey is still to be done, say so — it changes both the price basis and the production start.

  • Overall width, height and depth, and which faces are visible.
  • Floor finish level, since a cabinet ordered to a structural slab height will not fit a completed floor.
  • Whether dimensions are fixed or you are open to a size that reduces offcuts and standardises glass panels.

3. What is being displayed, and how it sits

The collection drives the interior specification far more than most buyers expect. Send photographs of the objects, with their sizes and weights, and state whether they are handled regularly or set once and left.

Display contentSpecification it should trigger in your RFQ
Heavy ceramics, stone or metal objectsGlass shelf thickness and load rating, or timber shelves; shelf pitch and adjustability
Fragile glassware, porcelain, collectablesShelf lips or retainers, door closure type, vibration and door swing considerations
Books, boxes, framed piecesShelf depth per bay, vertical dividers, mixed open and closed bays
Items needing protection from handling or dustGlazed doors versus open display units, lock specification, door travel and clearance in front of the cabinet

4. Materials, finish and how the cabinet meets the rest of the joinery

Santerson's custom and OEM work covers bespoke finishes, textures and material choices across wood, metals, engineered stone and laminates, so an RFQ that names only "white" or "oak" is asking for a guess. Give the reference, not the adjective.

  • Carcass material and door/drawer front material, with a finish reference: RAL or Pantone code, a sample photograph of an existing panel, or a physical sample you can post.
  • Sheen level — matte, satin or high gloss — because sheen changes both appearance and the way edges and fingerprints read in use.
  • Handle style or handleless detail, hinge side, and door opening direction relative to traffic flow.
  • Where the cabinet must match other pieces from the same package, list them explicitly. A curio cabinet ordered alongside glass front display cabinets, wardrobes or a media wall should be quoted as one group so that veneer, lacquer and hardware are drawn from the same batch.

5. Lighting: describe it as an electrical item

Integrated lighting is the single most common source of a change order on a display cabinet. If you want an illuminated display cabinet, treat the lighting as its own line in the RFQ rather than an adjective on the cabinet.

  • Light position: top of each bay, vertical channels, shelf-edge or plinth; and whether the fitting is concealed or visible.
  • Colour temperature and brightness, plus whether dimming is required and where the switch or sensor sits.
  • Transformer or driver location and how it will be accessed for replacement — inside the cabinet, in an adjacent unit, or behind an access panel.
  • Voltage and supply standard at the destination country, and who supplies the mains connection: your electrician or the cabinet wiring.

Lighting specification and electrical details should be confirmed for each project rather than assumed from a catalogue photograph; a picture on a product page shows one configuration, not every option available to you.

6. Quantities, phasing and the schedule that actually exists

Give quantities per room or per unit type, and mark which items are on the critical path. Built-in joinery usually sits behind the structural and first-fix trades, so state the date the space will be ready for measurement and the date the cabinet must be installed — not only the date you would like it delivered.

  • Quantity of each configuration, grouped by room or floor.
  • Whether any units are duplicates across villas or guest rooms, which affects batch consistency and price.
  • Site-ready date, installation window and handover date, with the trade sequence around the joinery.

7. Delivery, access and installation responsibilities

A display cabinet is heavy, glass-fronted and easily damaged in transit, so logistics detail belongs in the RFQ from the first email rather than after the order.

  • Destination address, delivery address if different, and Incoterms you want quoted (ex works, FOB, CIF or delivered).
  • Access conditions: lift size, stair width, turning radius, whether the unit can arrive assembled or must be knocked down and assembled in room.
  • Who installs — your local contractor or on-site installation support with inspection and snagging — and who signs off.
  • Packaging expectation for glass panels and any spare panel you want held locally.

8. What the quotation itself should contain

Ask for the same breakdown from every supplier so that your comparison is honest. A usable quotation states:

  • Unit price per configuration, with materials and finishes named in words, not codes only.
  • What is excluded: glass, lighting, hardware, delivery, installation, taxes and duties.
  • Currency, validity period, payment stages, and the point at which drawings are frozen.
  • Production lead time measured from drawing approval, not from enquiry.
  • Warranty scope and what is treated as a claim, plus spare-part availability for hardware and light sources.
A short rule of thumb: if your RFQ can be answered with one number, it is missing something. A quotation for a made-to-measure curio cabinet should come back with questions about survey, glass load, lighting access and installation — that response is a better sign than an instant price.

A ready-to-send checklist

  • Project type, location and the room the cabinet serves
  • Survey status plus overall dimensions in millimetres, with visible faces marked
  • Objects to be displayed, with sizes, weights and photos
  • Carcass and front materials, finish reference and sheen level
  • Lighting position, colour temperature, dimming, driver access and supply voltage
  • Quantities per configuration, site-ready date and installation window
  • Incoterms wanted, destination, access constraints and who installs
  • The quotation breakdown you expect back, including exclusions
SANTERSON works as a manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, covering design coordination, custom and OEM production, door-to-door logistics and installation support. Send the checklist above with your drawings to request a quotation, and include photographs of the pieces you intend to display so the interior specification can be settled in the first round rather than the third.